National Highway 58 (India, old numbering)

Source: Wikipedia, the free encyclopedia.

This article is about the old number of Delhi-Meerut-Roorkee-Haridwar-Badrinath National Highway.

National Highway 58 shield}}
National Highway 58
Ghaziabad, Uttar Pradesh
North endMana Pass north of Badrinath, Uttarakhand
Location
Country
Ghaziabad - Meerut - Muzaffarnagar - Roorkee
- Haridwar - Rishikesh - Joshimath - Badrinath - Mana Pass
Highway system
NH 57A
NH 59

National Highway 58 (NH 58) was a

.

Of its total length of 538 km, NH 58 traversed 165 km in Uttar Pradesh and 373 km in Uttarakhand.[1]

The highway was constructed and maintained by National Highways Authority of India from Delhi to Rishikesh and Border Roads Organisation (BRO) of Indian Army from Rishikesh, where the plains end and the mountains start, to its northernmost end. The highway bypasses Meerut city that was a big bottleneck. Bypasses have been constructed at Muzaffarnagar and Roorkee.[2]

Various segments of NH 58 have got new numbers now and NH 58 does not exist as such. However, many persons continue to use the term NH 58 for the Delhi-Meerut-Haridwar highway.

NH 58 broken into various NH numbers

With the National Highways Authority of India

renumbering
all national highways in India, various segments of NH 58 got new NH numbers. These are:

The highway bypasses the towns and cities en route from Haridwar to Meerut.

Importance of NH 58 (old number)

Religious

It is an important route for

Ganga river originates), Kedarnath temple and Badrinath
temple. The pilgrims visit Haridwar and Rishikesh in the plains the entire year but more so during the winter. The pilgrim season in the hills starts with melting of the snow at the end of April or in the beginning of May and continues until the onset of monsoon rains in late June. Buses and vehicles packed with pilgrims and tourists throng the highway during the summer months.

The highway is packed with pilgrims and tourists during pilgrimage season or during important festivals.

Ganga
river and carry it to their villages and homes walking on foot all the way during one fortnight, one lane of the highway is reserved for these pilgrims who walk on foot and vehicles have to use only one lane for about two weeks in a year.

Tens of millions of pilgrims attending the Kumbh Mela in January to March 2021 at Haridwar will use this highway extensively. More than 50 million devotees attended the last Kumbh Mela.[4]

Strategic and military

The highway connects with the border with Tibet. It is built and maintained by Border Roads Organisation (BRO) of Indian Army from Rishikesh, where the plains end and the mountains start, to its northernmost end. Earlier it was built only up to Chamoli and has over the years gradually been extended to Joshimath, Badrinath and finally to Mana Pass near the border with Tibet. The army along with civilians living in Garhwal are its major user. CharDham yatra in summer is all thru this route.

Development

As of December 2013, the Meerut to Muzaffarnagar stretch is 4-laned on toll basis including bypasses at Khatauli and Muzaffarnagar. The Muzaffarnagar to Haridwar stretch has been awarded for similar development with scheduled completion by February 2013, but has been delayed due to problems such as land acquisition, tree felling and inadequate mobilization by the Concessionaire.[5] Also, a flyover at Mohan Nagar, a 4710 m long viaduct at Modinagar and a 1710 m long viaduct at Murad Nagar are proposed.[6]

  • February 2020: Roorkee bypass road construction work restarted, its expected to be completed by November 2020.[7][8]
  • February 2021: Roorkee bypass opens for traffic. [9]

See also

References

  1. ^ "National Highways and their lengths". National Highways Authority of India. Archived from the original on 10 February 2010. Retrieved 12 February 2009.
  2. ^ "NHAI cancels contract for Dehradun highway, serves notice for Haridwar stretch | India News - Times of India". The Times of India.
  3. The Tribune
    . 23 June 2009.
  4. ^ Jha, Monica (23 June 2020). "Eyes in the sky. Indian authorities had to manage 250 million festivalgoers. So they built a high-tech surveillance ministate". Rest of World. Retrieved 23 June 2020.
  5. ^ "Press Release - Development of Meerut-Muzaffarnagar-Haridwar Stretch". Press Information Bureau, Government of India. 17 December 2013. Retrieved 6 January 2014.
  6. ^ "Press Release - Construction of Flyovers on National Highway-58". Press Information Bureau, Government of India. 9 December 2013. Retrieved 6 January 2014.
  7. ^ "अतिक्रमण हटाकर शुरू कराया हाईवे बाईपास निर्माण कार्य".
  8. ^ "NH-58 project to be completed a month before deadline, says NHAI official | Dehradun News - Times of India". The Times of India.
  9. ^ "उत्तराखंड से दिल्ली की दूरी हो गई कुछ कम..आखिरकार खुल ही गया 12 Km लंबा बाईपास".