State Route 527 (SR 527, also known as the Bothell–Everett Highway) is a state highway in Snohomish County, Washington. It travels 9 miles (14 km) from north to south, connecting the northern Seattle suburbs of Bothell, Mill Creek, and Everett. The highway intersects Interstate 405 (I-405) at its southern terminus, SR 96 in northern Mill Creek, and I-5 at an interchange with SR 99 and SR 526 in Everett.
The Bothell–Everett Highway was built in the 1910s as part of the intercity
Since its opening, suburban development in Mill Creek and northern Bothell has contributed to traffic congestion on stretches of SR 527. During the 1990s and early 2000s, the state government funded several projects that widened the highway to its present four-lane configuration with sidewalks, bus pullouts, and
Route description
SR 527 begins as a continuation of the Bothell–Everett Highway at a partial cloverleaf interchange with I-405 in northern Bothell, located in Snohomish County. The interchange is located adjacent to the Canyon Park park and ride, a major bus transfer facility. The highway travels northeast through the Canyon Park business park and turns north after crossing North Creek, following it to a junction with SR 524 at Thrasher's Corner.[2] SR 527 then crosses into the unincorporated North Creek area, which is filled with suburban homes and apartment complexes that line the road,[3] along with commercial areas at Kennard Corner and near North Creek County Park.[4][5]
The highway continues north into the center of
Following the junction, SR 527 curves along the shore of
SR 527 is maintained by the
History
An early
The Pacific Highway, later numbered to State Road 1 in 1923 and part of
Major suburban development in the Mill Creek area began in the 1970s and contributed to growing traffic congestion on SR 527,
The first phase of the project, from 228th Street near Canyon Park to 208th Street at Thrashers Corner, was completed in 1991 at a cost of $5.6 million.[38] Construction of the second phase, between Thrashers Corner and 164th Street in Mill Creek, was delayed by concerns that stormwater runoff would be inadequately handled by the new road.[39] It began construction in 1993 and was completed four years later at a cost of $18.8 million.[19] The City of Bothell also began its own widening project on a stretch of the highway south of Canyon Park in 1998, having decided against rerouting SR 527 onto a new bypass of the city center.[40][41] The state government had proposed transferring the section to Bothell in the 1980s, which was met with protests from city officials.[42]
The third phase of the state's widening project, between 164th Street and 132nd Street, was constructed from 2003 to 2004 and cost $27.8 million.
In 2009, the City of Bothell adopted plans to convert the southernmost blocks of SR 527 into a mixed-use boulevard and submitted a request to transfer a section of the highway from the state's control.[46] The proposed transfer received the recommendation of the state transportation commission in July 2010 and was passed by the state legislature in April 2011.[47] As a result, the southernmost 2.51 miles (4.04 km) of SR 527 was decommissioned from the state highway system and the highway's southern terminus was moved from SR 522 to I-405.[47] The $23 million boulevard, funded by a state grant and city revenue, was completed in August 2017 and added wider sidewalks, four sets of parallel parking lanes, a business access lane also designated for use by bicyclists, and medians to separate traffic.[48]
Major intersections
The entire highway is in Snohomish County.
Location | mi[1] | km | Destinations | Notes | |
---|---|---|---|---|---|
Bothell | 0.00 | 0.00 | I-405 – Bellevue, Bellevue, Lynnwood | Continues south as Bothell–Everett Highway | |
1.11 | 1.79 | SR 524 (208th Street) – Maltby | |||
Mill Creek | 6.02 | 9.69 | SR 96 west to I-5 via 16th Avenue | ||
6.22 | 10.01 | SR 96 east (132nd Street) | |||
Vancouver BC | |||||
9.29 | 14.95 | Seattle, Everett | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
References
- ^ a b c Multimodal Planning Division (January 3, 2018). State Highway Log Planning Report 2017, SR 2 to SR 971 (PDF) (Report). Washington State Department of Transportation. pp. 1582–1590. Retrieved August 27, 2018.
- ^ Kossen, Bill (May 28, 2002). "No more dot on the map; Commercial developers discover Bothell crossroads". The Seattle Times. p. C1.
- ^ Haglund, Noah (June 4, 2016). "Rapid urban growth alters country life in North Creek area". The Everett Herald. Retrieved August 27, 2018.
- ^ a b c d Google (August 27, 2018). "State Route 527" (Map). Google Maps. Google. Retrieved August 27, 2018.
- ^ a b c Washington State Department of Transportation (2014). Washington State Highways, 2014–2015 (PDF) (Map). Olympia: Washington State Department of Transportation. Puget Sound inset. Archived from the original (PDF) on February 21, 2017. Retrieved August 27, 2018.
{{cite map}}
: External link in
(help)|inset=
- ^ a b Hinshaw, Mark (March 16, 2003). "New town center gives focus to a scattered community". The Seattle Times. p. G1.
- ^ City of Mill Creek: Main City Map with Trails (PDF) (Map). 1 inch = 500 feet. City of Mill Creek. January 2017. Retrieved August 27, 2018.
- ^ "SR 5 – Exit 189: Junction SR 99/SR 526/SR 527" (PDF). Washington State Department of Transportation. January 13, 2013. Retrieved August 27, 2018.
- ^ 2016 Annual Traffic Report (PDF) (Report). Washington State Department of Transportation. 2017. p. 205. Archived from the original (PDF) on August 12, 2017. Retrieved August 27, 2018.
- ^ "State Highway National Highway System Routes in Washington" (PDF). Washington State Department of Transportation. 2017. Retrieved August 27, 2018.
- ^ "What is the National Highway System?". Federal Highway Administration. January 31, 2017. Retrieved August 27, 2018.
- ^ Everett Transit System Map (Map). Everett Transit. March 2018. Archived from the original on August 28, 2018. Retrieved August 27, 2018.
- ^ Community Transit System Map (PDF) (Map). Community Transit. March 2018. Retrieved August 27, 2018.
- ^ Giordano, Lizz (March 25, 2019). "Swift Green Line starts rolling, from Bothell to Boeing". The Everett Herald. Retrieved March 25, 2019.
- ^ Lindblom, Mike (March 22, 2019). "Swifter bus service begins in Mill Creek and north Bothell this weekend". The Seattle Times. Retrieved March 25, 2019.
- ^ Seattle Quadrangle, Washington (Map). 1:125,000. United States Geological Survey. October 1897. Retrieved August 27, 2018.
- ^ "Washington State's Historic State Roads: Historic Context for Island, Snohomish, King, Pierce, and Kitsap Counties" (PDF). Washington State Department of Archaeology and Historic Preservation. January 2014. pp. 208–209. Retrieved August 27, 2018.
- ^ "Chapter 65: Classifying Public Highways" (PDF). Session Laws of the State of Washington, 1913. Washington State Legislature. March 12, 1913. p. 221. Retrieved August 30, 2018.
- ^ a b c d e Brooks, Diane (May 25, 2006). "Loggers to latte stands: Route spans history". The Seattle Times. p. B4. Retrieved August 27, 2018.
- ^ "Paved Highway to Everett Nears Completion". The Seattle Times. November 12, 1916. p. 6.
- Newspapers.com.
- ^ "Chapter 185: Primary and Secondary State Highways" (PDF). Session Laws of the State of Washington, 1923. Washington State Legislature. March 19, 1923. pp. 628–629. Retrieved August 31, 2018.
- .
- ^ "New Highway Shortens Trip; Everett Road Open Oct. 15". The Seattle Times. August 29, 1927. p. 20.
- )
- ^ "Old Highway Route is Turned Back to Snohomish County". The Everett Herald. November 9, 1927. p. 1. Retrieved January 27, 2024 – via Newspapers.com.
- ^ "Chapter 207: Classification of Public Highways" (PDF). Session Laws of the State of Washington, 1937. Washington State Legislature. March 18, 1937. p. 998. Retrieved August 31, 2018.
- ^ "Chapter 239: Public Highways" (PDF). Session Laws of the State of Washington, 1943. Washington State Legislature. March 20, 1943. p. 721. Retrieved August 31, 2018.
- ^ "Chapter 172: Highways" (PDF). Session Laws of the State of Washington, 1957. Washington State Legislature. March 21, 1957. p. 638. Retrieved August 30, 2018.
- Washington State Highway Commission. Archived from the original(PDF) on February 17, 2017. Retrieved September 9, 2018.
- ^ "To End Confusion: Highways Given Different Numbers". The Seattle Times. January 26, 1964. p. 24.
- OCLC 29654162. Retrieved November 26, 2018 – via WSDOT Library Digital Collections.
- ^ Barr, Robert A. (October 6, 1969). "405 Freeway Link To Open Next Month". The Seattle Times. p. 7.
- ^ Bergsman, Jerry (May 8, 1990). "Plans afoot to widen Bothell-Everett highway". The Seattle Times. p. E3.
- ^ Keene, Linda (August 23, 1989). "Once-rural road now scene of showdown over growth". The Seattle Times. p. A1.
- ^ a b Tuinstra, Rachel (July 2, 2003). "City may condemn land for highway". The Seattle Times. p. H13.
- ^ Bergsman, Jerry (November 1, 1990). "Relief is now in sight for motorists". The Seattle Times. p. F3.
- ^ Bergsman, Jerry (February 4, 1991). "Bothell-Everett highway work may ease traffic, limits on growth". The Seattle Times. p. A1.
- ^ Bergsman, Jerry (January 6, 1993). "Mill Creek roadwork to be revived". The Seattle Times. p. C3.
- ^ "Projects aimed at aiding congestion". The Seattle Times. March 30, 1998. p. B2.
- ^ "Council reconsiders traffic alternatives". The Seattle Times. October 26, 1989. p. C3.
- ^ Bergsman, Jerry (December 3, 1986). "State road study criticized". The Seattle Times. p. H1.
- ^ "SR 527 - 164th St. SE to 132nd St. SE Additional Lanes". Washington State Department of Transportation. Archived from the original on June 21, 2006. Retrieved September 26, 2008.
- ^ a b Kapralos, Krista (May 17, 2006). "Highway widening project completed". The Everett Herald.
- ^ "SR 527 - 132nd St. SE to 112th St. SE - Complete May 2006". Washington State Department of Transportation. Archived from the original on December 16, 2006. Retrieved September 26, 2008.
- Congress for the New Urbanism. Retrieved September 10, 2018.
- ^ a b "Final Bill Report: HB 1520" (PDF). Washington State Legislature. May 2011. Retrieved September 10, 2018.
- ^ Slager, Melissa (August 23, 2017). "Bothell leans European with its new multiway boulevard". The Everett Herald. Retrieved September 10, 2018.