The Baltimore Belt Line was constructed by the
Origins
The B&O's original connection to New York in
Construction
Connecting the new Philadelphia Branch to the rest of the B&O system was a considerable engineering challenge. A new surface line across the center of town was politically impossible and prohibitively expensive. Building around the outskirts of town would have required massive
The route the B&O chose started from the existing end of the track at Camden Street Station, at the west end of "The Basin" (modern Inner Harbor) of the Northwest Branch of the Patapsco River. A tunnel was constructed directly under Howard Street, heading north–south until just before it crossed the existing PRR line.
At the north portal of the tunnel, Mount Royal was constructed between 1891 and 1896. The track then curved around the northwest corner of the center city going east, passed through six other (much shorter) tunnels, continuing across the northern outskirts of downtown, curving around the Northeast corner of the old City, finally heading southeast to meet the already constructed line just north of the Canton neighborhood and connecting with the East Coast route. The cost of construction drove the Baltimore & Ohio Railroad into bankruptcy shortly after the line opened in 1895, 68 years after the line was founded in 1827 as America's first passenger / freight railroad.
Initially there were plans to build three new stations in Baltimore, but concern for interference with freight haulage and expense eventually reduced this to a single station at Mount Royal Avenue, just west by the Jones Falls stream, which opened on September 1, 1896. Lower-level platforms were added later at the east end of B&O's Camden Street Station in 1897.[2][5]
Howard Street Tunnel
The Howard Street Tunnel, originally a 1.4-mile (2.3 km) long tunnel under Howard Street in downtown Baltimore, took four and a half years to build (1890–1895) and was the longest tunnel on the B&O's system.[6] Its construction cost $7 million (equivalent to more than $200 million in 2018) and required 2,400 workers.[7] In the mid-1980s, the tunnel's original length of 1.4 miles or 7,340 feet (2,237 m) was extended an additional three-tenths of a mile (480 m) further south of its original Camden Station portal when the B&O successor CSX Transportation's mainline track east of the Baltimore & Ohio Warehouse at Camden Yards was covered over for construction of Interstate 395.[8] The tunnel is brick-lined with iron-arched centerings. At the time of completion it was considered innovative for its use of electricity for illumination and powering of locomotives. Inside the tunnel, there was an underground platform for trains serving Camden Station. The Howard Street Tunnel is listed on the National Register of Historic Places.[9]
Electrification
By this time the Pennsylvania Railroad line through Baltimore and points south had been in operation for twenty years. Due to the built-up nature of the area traversed and the hilly terrain, much of its line through town was in tunnels, which posed severe ventilation problems. Large chimneys were constructed above the Pennsylvania line, in a not entirely successful attempt to disperse the fumes from the coal-fired locomotives. However, by 1890 electric locomotion was beginning to appear possible, and in 1892 the B&O thus contracted with General Electric (GE) for electric locomotives, powerhouse equipment, and an electrical distribution system.[5] This equipment was delivered beginning in 1895, and the first train pulled by an electric locomotive operated through the Howard Street Tunnel on June 27, 1895.[10]
The grade on the electrified portion was downhill to Camden Station; therefore traffic heading southbound ("westbound", in B&O timetables), from Mount Royal Station, simply drifted through the tunnels. Since the engine was not working, the smoke produced was relatively light. Going upgrade northbound ("eastbound", in B&O timetables) the electric locomotives were coupled to the front of the train at Camden Station and pulled the entire train, including the steam locomotive, through the Howard Street tunnel. When northbound passenger trains stopped at Mt. Royal Station at the north end of the tunnel, the electric locomotive was uncoupled. Northbound freight trains were pulled by electric locomotives for another two miles, until reaching Huntingdon Avenue in east Baltimore. There the steam locomotive closed its cylinder cocks, took up the load, and the electric locomotive uncoupled on the fly, accelerating ahead to a pocket siding between the tracks.[5]
General Electric installed
Initially power was supplied through a unique system in which a pickup shoe rode in a channel above and to one side of the track. This proved vulnerable to contamination from coal smoke, and after a short time it was replaced by a conventional
Latter day operation
Throughout much of its history until the end of passenger trains in 1958, the line had relatively low passenger traffic, averaging six daily New York–Washington trains each way. Freight traffic was also limited by the scarcity of online industry east of Baltimore and B&O's lack of a connection across the Potomac River at Washington, D. C., to the southern railroads. The massive Pennsylvania main line carried most traffic to the northeast.
By the 1970s, however, both railroads were failing financially. The PRR had been merged into Penn Central in 1968, and two years later the new company declared bankruptcy.[12] The B&O became part of the Chessie System in 1973, which in turn was merged into CSX in 1980.[13]
In 1976 the PRR line became part of the newly formed
Howard Street Tunnel fire
On July 18, 2001, a 60-car CSXT freight derailed in the Howard Street Tunnel, sparking a fire that burned for six days and blocked traffic for much longer. The Howard Street Tunnel fire called attention to the Belt Line, both as a risk to the surrounding structures and as a link in rail traffic. CSXT has implemented various improvements to increase the integrity of the link, but is limited by the shallow depth of the bore (only three feet or 0.91 meters below the surface at the south end) and the instability of the surrounding soil.
Retaining wall collapse
On April 30, 2014, a block-long portion of a retaining wall in a below-grade stretch of the Belt Line in southern Charles Village collapsed after a heavy rainstorm, sending part of East 26th Street and a number of cars onto the tracks. No one was injured but the tracks were blocked by debris, shutting down railroad operations as well as the city block directly above them.[15] On May 2, 2014, freight trains once again began running through the tunnels along this stretch of the Baltimore Belt Line. East 26th Street was reopened to vehicular traffic a year later.
Howard Street Tunnel clearance improvements
Reconstructing the Howard Street Tunnel to accommodate double-stacked intermodal containers had been once thought to cost $1–3 billion. However, in April 2016, a $425 million plan was revealed that would create the needed 1.5 ft (0.46 m) of additional clearance in the tunnel by trimming and notching its arched ceiling, lowering its floor, and using steel crossties, which have a lower profile than wood crossties. The Maryland Department of Transportation subsequently applied for a $155 million FY2016 FASTLANE grant to help fund a project based on this lower-cost plan, but the grant was not received. In December 2016, MDOT reapplied for a FASTLANE grant of the same amount in the FY2017 round of funding. In addition to the federal funds expected from the grant, the State of Maryland would contribute $145M, and CSX $125M, towards the cost of the project. In expectation of the grant funding, CSX is investing $25M in the tunnel – $21M to improve its water discharge system, and $4M for engineering and design of the clearance improvements. The project, which would also increase the clearance at nine bridges north of the tunnel, would last 4–5 years (due to having to be scheduled around active rail traffic), create about 500 construction jobs, and would result in 178,000 containers per year being moved by rail from the Port of Baltimore instead of by truck. Maryland Governor Larry Hogan said that the state would explore other funding solutions if the FY2017 FASTLANE grant is not received.[16][17][18][19][20] On July 22, 2019, U.S. Transportation Secretary Elaine Chao announced the award of $125 million in federal infrastructure funding for the project.[21]
See also
- Railroad electrification in the United States
- List of tunnels documented by the Historic American Engineering Record in Maryland
References
- ^ "A ninety-six ton electric locomotive". Scientific American. New York. 10 August 1895.
- ^ ISBN 0-934118-17-5)
- )
- OCLC 34099225.
- ^ ISBN 0-89778-155-4)
- ^ Harwood, Royal Blue Line, p. 86.
- ^ Kelly, Jacques (July 27, 2019). "Shrouded in darkness, Baltimore's Howard Street Tunnel is a workhorse rail artery". The Baltimore Sun. p. 3. Retrieved July 27, 2019.
- ISBN 1-879314-08-8.
- ^ Nancy Miller (August 1972). "National Register of Historic Places Registration: Howard Street Tunnel" (PDF). Maryland Historical Trust. Archived (PDF) from the original on 2016-04-07. Retrieved 2016-03-01.
- ^ F.G. Bennick, "B&O was first U.S. railroad to use electric locomotives", Baltimore & Ohio Magazine, April, 1940.
- ^ J.H. Davis, "B&O Substation for Main Line, through Baltimore", Baltimore & Ohio Magazine, April, 1940.
- ISBN 978-0-226-77658-3.
- ISBN 978-0-7603-1796-9.
- ^ Halsey III, Ashley (March 28, 2012). "Aging Baltimore tunnel a threat to shipping economy for the city and Maryland". The Washington Post. Archived from the original on March 30, 2012. Retrieved March 29, 2012.
- ^ Hermann, Peter (April 30, 2014). "Street collapses in Baltimore, washing away cars". The Washington Post. Archived from the original on August 11, 2016. Retrieved August 24, 2017.
- ^ Campbell, Colin (September 28, 2016). "CSX and Maryland officials still expect federal funding for Howard Street Tunnel". The Baltimore Sun. Archived from the original on November 18, 2016. Retrieved November 18, 2016.
- ^ "Hogan Administration Submits FASTLANE Grant Application to Double-Stack Howard Street Tunnel". Office of Governor Larry Hogan. State of Maryland. December 16, 2016. Archived from the original on December 28, 2016. Retrieved December 27, 2016.
- ^ "Governor Larry Hogan, CSX CEO Michael Ward Confirm Commitment to Howard Street Tunnel Project". Office of Governor Larry Hogan. State of Maryland. October 24, 2016. Archived from the original on December 28, 2016. Retrieved December 27, 2016.
- ^ Cox, Erin (October 24, 2016). "Hogan pledges to revamp 'infamous' Howard Street Tunnel". The Baltimore Sun. Archived from the original on December 29, 2016. Retrieved December 28, 2016.
- ^ Prudente, Tim (April 14, 2016). "Maryland seeks $155 million from feds to clear freight bottleneck beneath Baltimore". The Baltimore Sun. Archived from the original on December 29, 2016. Retrieved December 28, 2016.
- ^ Campbell, Colin; Wood, Pamela (July 23, 2019). "Feds award long-sought grant to help expand Baltimore's Howard Street Tunnel but not as much as Maryland wanted". Baltimore Sun. Archived from the original on July 27, 2019. Retrieved July 27, 2019.
- "The Howard Street Tunnel- Moving the Freight Through Baltimore", Smith, Jeffrey, The National Railway Bulletin, Volume 66, Number 5, 2001
- "Baltimore's Unseen Artery: A Brief History of the Baltimore Belt Railroad and Its Howard Street Tunnel", Lee, J. Lawrence, ASCE Civil Engineering Conference and Exposition 2004
- B&O Power: Steam, Diesel and Electric Power of the Baltimore and Ohio Railroad 1829 – 1964, Sagle, Lawrence W., Alvin F. Staufer, 1964
External links
- Historic American Engineering Record (HAER) No. MD-11, "Baltimore & Ohio Railroad, Howard Street Tunnel, 1300 Mount Royal Avenue, Baltimore, Independent City, MD", 6 photos, 3 data pages, 1 photo caption page