Jammu–Baramulla line

Source: Wikipedia, the free encyclopedia.

Udhampur-Srinagar-Baramula Rail Link (USBRL)
Overview
StatusSemi operational till
broad gauge
ElectrificationYes
Operating speed130 km/h (81 mph)
Highest elevation1,730[1] m (5,680 ft)
Route map
Map Jammu–Baramulla line highlighted in red
km
338
Baramulla
Uri (inprogress)
(inprogress)
Kupwara Line (inprogress)
 
Kupwara
Bandipora Line
(proposed)
330
Sopore
323
Hamre
315
Pattan
307
Mazhom
297
Nadigam
292
Budgam
281
Srinagar
275
Pampore
Jhelum Bridge
269
Kakapora
259
Awantipora
252
Panzgom
Shopian Line
(inprogress)
245
Bijbehara
to Pahalgam (inprogress)
238
Anantnag
231
Sadura
226
Qazigund
Hillar Shahabad
208
Banihal
Tunnel T74R (
8.6 km
5.3 mi
)
Khari
Tunnel T49 (
12.75 km
7.92 mi
)
Sumber
Tunnel T48 (
10.2 km
6.3 mi
)
Sangaldan
Sawalkote
Dugga
Bakkal
Reasi
78
Shri Mata Vaishno
Devi Katra
62
Chak Rakhwal
Bhaderwah Line
(planned)
53
Udhampur
44
Ramnagar
Tawi Bridge
22
Manwal
14
Sangar
10
Bajalta
Poonch line
(planned)
0
Jammu Tawi
km

The Jammu–Baramulla line

Chenab Bridge lies on this line, which is the tallest railway bridge in the world.[5] The total project cost in 2022 was INR28,000 crore (~US$3.5 billion).[6]

Construction of the route faced natural challenges including major earthquake zones, extreme temperatures and inhospitable terrain.[7] This Rail project from Jammu to Baramula was being initiated by Prime Minister Shri PV Narsimha Rao in 1996 later in 2002 Prime Minister Shri Atal Bihari Vajpayee announced it National Project. Although scheduled completion date for the project was 15 August 2007, the revised timeline for the completion of remaining Katra–Banihal section of the project is November–December 2023.[8]

The extension of railway line from Baramulla to Kupwara has also been approved, and revised Detailed Project Report (DPR) for it was submitted in July 2020 by the Railway Board.

Timeline

However, the entire project of connecting Kashmir to Rest of India by rail which was slated to be commissioned in February this year, was further delayed to the third quarter of the year due to infrastructural snags. The entire length of 272 km (169 mi) connecting Udhampur with Srinagar and Baramulla was earlier planned to be inaugurated prior to the Loka Sabha elections in March with a Vande Bharat express service between Udhampur and Baramulla.[38]

Progress

The railway line is divided into four sections:[7]

  • Leg 0, running 53 km from Jammu to Udhampur and completed in April 2005.[9]
  • Leg 1, running 25 km from Udhampur to Katra. The section was completed on 4 July 2014.
  • Leg 2, running 111 km from Katra to Banihal section has total tunnels 35 ie 27 main and 8 escape. This under construction section was expected to be completed by nov-dec 2023.[39]
  • Leg 3 running 135 km from Banihal to Baramulla. The section was completed on 26 June 2013.[40]

Leg 0

Long orange-and-white passenger train in a station
Jammu Tawi railway station

Leg 0 has been operational since 2005. It was built over 21 years, between 1983 and 2004-05.

Leg 1

Leg 1 has been operational since July 2014. The leg had missed opening dates in the past, including December 2005, December 2006[41] and May 2009.[42] Work on the section, suspended for two years due to a partial tunnel collapse, resumed in September 2009.[43] Although the section was planned to open by 2 February 2014, passenger service was delayed due to Commission of Railway Safety concerns about one bridge and tunnel. The route includes seven tunnels and 30 bridges.[44] The section was opened on 4 July 2014.

Leg 2

Leg 2, running 111 km from Katra to Banihal is under construction, and missed the deadline in December 2023. Construction on the leg has been beset by technical difficulties with alignment and disputes with contractors,[22] and was originally expected to be finished in 2017–18.[45][46][47][48] This is the line's most difficult section of the rail line, with 62 bridges and a number of tunnels totalling 10 km out of total 129 km. It requires 262 km of access roads connecting 147,000 people in 73 villages; 160 km, connecting 29 villages, is completed.[49] In July 2008, work on part of the Katra-Banihal section was suspended for a possible realignment.[50] The alternative alignment, proposed by the railway, reduced the track length from 126 km to 67 km. A committee appointed by the Railway Board recommended abandoning 93 km of the previously-approved alignment.[51] On 12 November 2014, the Delhi High Court directed the central government to appoint a committee to review the 126 km-long section.[52]

An 18 km stretch of Leg 2, between

Pir Panjal Railway Tunnel, also known as the Banihal railway tunnel. India's longest rail tunnel, it is 8.4 m wide and 7.39 m high. The tunnel includes a 3 m-wide service road for maintenance and emergency use. Its average elevation, 1760 m, is 440 m below the existing road tunnel.[49]

The tunnel facilitates transportation during winter (when inclement weather closes the Srinagar-Jammu highway), and halves the distance between

Quazigund and Banihal (35 km by road and 17.5 km by train).[54] The Banihal railway station is 1,702 m (5,584 ft) above mean sea level, and trains run from Banihal to Qazigund through the tunnel. The 5 km Banganga section was expected to be operational before the completion date of 2017–18 for the entire project.[55]

This leg contains the construction of two extremely challenging bridges,

.

Status updates

Status update of under construction 148 km route from Katra to Banihal.

  • Oct 2018: work on
    Chenab Bridge have stopped due to difference of opinion between contractor and railway staff.[56]
  • Dec 2018: Rail line likely to miss 2020 deadline.[57]
  • Aug 2019: New target period for completion is 2021–22.[58]
  • July 2020: The Railways have completed the construction of over 20 out of 37 small and large bridges. The Union Railway Minister Piyush Goyal announced that the construction of this leg will be completed by August 2022.[59]
  • Aug 2022: 75% (28) of total 37 bridges and 97.6% of 35 tunnels (160.52 km out of total 164 km tunnel length completed, including 95.47 km of 27 main tunnels and 65.05 km of 8 escape tunnels) of tul completed. Cumulative spend on Katra-Banihal rail link up to June is INR23071 crore (~US$3 billion).[60] Chenab Railway Bridge - world's highest railway bridge also completed after its 'Golden joint' was launched on Chenab river and minor works on 1.3 km long bridge is expected to be completed by November 2022.[61]
  • On 20 February 2024 Banihal to sangaldan half distance is opened for public and train runs from baramulla to sangaldan

Leg 3

Station with overhead walkway and mountains in the background
Banihal railway station

Leg 3 has been operational since October 2009. The line from

Jammu Tawi
(or Udhampur) to Banihal by road and from Banihal to Srinagar by rail is possible.

The Banihal–Baramulla section is also being electrified, and track-electrification work has been in full swing since July 2020.

In June 2017 Ministry of Railways also laid the foundation stone of five new halt railway stations on the Banihal–Baramulla section i. e. Sangdan, Ratnipora, Razwan, Monghall and Nadigam but civil works of these stations has yet to start.[62]

Extension

Udhampur-Srinagar-Baramula Rail Link (USBRL)
km
338
Baramulla
Uri (inprogress)
(inprogress)
Kupwara Line (inprogress)
 
Kupwara
Bandipora Line
(proposed)
330
Sopore
323
Hamre
315
Pattan
307
Mazhom
297
Nadigam
292
Budgam
281
Srinagar
275
Pampore
Jhelum Bridge
269
Kakapora
259
Awantipora
252
Panzgom
Shopian Line
(inprogress)
245
Bijbehara
to Pahalgam (inprogress)
238
Anantnag
231
Sadura
226
Qazigund
Hillar Shahabad
208
Banihal
Tunnel T74R (
8.6 km
5.3 mi
)
Khari
Tunnel T49 (
12.75 km
7.92 mi
)
Sumber
Tunnel T48 (
10.2 km
6.3 mi
)
Sangaldan
Sawalkote
Dugga
Bakkal
Reasi
78
Shri Mata Vaishno
Devi Katra
62
Chak Rakhwal
Bhaderwah Line
(planned)
53
Udhampur
44
Ramnagar
Tawi Bridge
22
Manwal
14
Sangar
10
Bajalta
Poonch line
(planned)
0
Jammu Tawi
km

Infrastructure and construction

Rail bridge, photographed from the track
Rail bridge in Banihal

The line may be the most difficult rail project undertaken on the

Qingzang Railway
, completed in 2006 across permafrost and climbing to over 5,000 m (16,000 ft) above sea level, is comparable. Although the Indian temperatures are less severe, the region experiences harsh winters with heavy snowfall. In the Pir Panjal Range, most peaks exceed 15,000 ft (4,600 m) in height.

The route includes many bridges, viaducts and tunnels. The railway is expected to cross over 750 bridges and pass through over 100 km (62 mi) of tunnels, the longest of which is 11,215 m (6.969 mi).[7] Engineering challenges include crossing the Chenab River on a 1,315-metre-long (4,314 ft) bridge 359 m (1,178 ft) above the riverbed and crossing the Anji Khad on a 657-metre-long (2,156 ft) bridge 186 m (610 ft) above the riverbed.[65] The Chenab Bridge will be the highest railway structure of its kind in the world, 35 metres (115 ft) higher than the top of the Eiffel Tower. Both bridges will be simple. Weathering steel is planned for an environmentally-friendly appearance and to eliminate the need for painting. The design and structure is similar to West Virginia's New River Gorge Bridge. The project is managed by the Konkan Railway Corporation. Completion was scheduled for 2012 (four years after the first isolated section of the route was opened for local passenger service), and it requires 26,000 tonnes of steel.

Train rounding a snowy curve
Rounding a curve in Qazigund

All tunnels are built with the

New Austrian tunnelling method, and a number of challenges have been encountered while tunnelling through the geologically-young, unstable Sivalik Hills. In particular, water entered the Udhampur-to-Katra section; this required drastic solutions with steel arches and several feet of shotcrete
. Along with shotcrete, lattice girder support were provided according to different class of rocks found along the entire terrain of mountains in the proposed project. Although the rail line is being built through a mountainous region, a one-percent
broad gauge continuous welded rail laid on concrete sleepers, with a minimum curve radius of 676 m. The maximum speed will be 100 kilometres per hour (62 mph).[7]
Provision for future doubling will be made on major bridges. Provisions for future electrification will also be made, although the rail line will use diesel locomotives initially; the region is presently electricity-scarce. There will be 30 stations on the route, initially served by 10–12 trains per day.

Closed-circuit television cameras at major bridges, tunnels and stations are planned, and all major bridges and tunnels are illuminated.

Rolling stock

Long passenger train at a large station
Passenger train at Srinagar railway station

Passenger service will be provided by high-power

suspension for riding comfort. There is a compartment for the physically disabled, with wider doors.[66]

Freight rolling stock for the route will come from the existing national fleet. Freight service (grain and petroleum products) will run between the 10–12 daily passenger trains. Maintenance will be done at the

Badgam workshop, north of Srinagar. Three-aspect colour-light signalling is being installed on the route for safety, and GSM-R
equipment may be installed in the future to improve its quality.

Project agencies

Chenab Bridge for around ₹974 crore.[68] Gammon India and South Africa's Archirodon Construction will build the Anji Khad Bridge
for ₹745 crore.

Construction-related casualties

See also

References

  1. ^ "Indian Railways: More than broad, metre and narrow gauges". FirstPost. 25 February 2013.
  2. ^ "Jammu-Baramulla line". Railway Technology.
  3. ^ "Centre approves Baramulla-Kupwara rail link". The Economic Times. Retrieved 17 January 2022.
  4. ^ "Chenab rail bridge to be ready by next year". The Times of India. 2 August 2020.
  5. ^ "Salient Features of the Chenab and Anji Khad Bridges" (PDF). Official Webpage of the Konkan Railway Corporation Limited. Archived from the original (PDF) on 8 December 2003. Retrieved 14 August 2008.
  6. ^ "Another Engineering marvel: Railways making India's first-ever cable-stayed rail bridge". NewsOnAir. 17 February 2022. Retrieved 14 September 2022.
  7. ^ a b c d e Harish Kunwar. "Train-Link for J & K Prosperity". Press Release, Press Information Bureau, Government of India, dated 2008-10-16. Retrieved 25 November 2008.
  8. ^ "Railway Board Chairman-CEO inspects ongoing work on Katra-Banihal section". The Statesman. 11 September 2022. Retrieved 14 September 2022.
  9. ^ a b Harsh Bhal (13 April 2005). "A landmark development: Jammu-Udhampur rail line". Press Release, Press Information Bureau, Government of India. Retrieved 13 August 2008.
  10. ^ S.P. Sharma & Tripti Nath. "Manmohan flags off first Udhampur-Jammu train". Online Edition of The Tribune, dated 2005-04-14. Retrieved 13 August 2008.
  11. ^ Raghvendra Rao. "No full stops in this train journey". Online edition of The Indian Express, dated 2008-08-07. Archived from the original on 10 August 2008. Retrieved 10 August 2008.
  12. ^ Manoj Mitta (18 September 2008). "With Chenab project scrapped, Rs 450 cr may go waste". The Times of India. Archived from the original on 21 October 2012. Retrieved 18 September 2008.
  13. ^ Manoj Mitta (26 October 2008). "Course correction saves Kashmir train". The Times of India. Archived from the original on 22 October 2012. Retrieved 15 December 2008.
  14. ^ Manoj Mitta (12 September 2008). "India drops plans for world's highest bridge". The Times of India. Archived from the original on 21 October 2012. Retrieved 23 September 2008.
  15. ^ "Manmohan flags off first train in Kashmir Valley". Online edition of The Hindu, dated 2008-10-12. Chennai, India. 12 October 2008. Archived from the original on 7 July 2009. Retrieved 12 October 2008.
  16. ^ "Prime Minister flags off Kashmir Valley's dream train". India Today. 11 October 2008.
  17. ^ "Valley train reaches Baramulla". 14 February 2009.
  18. ^ PTI (14 February 2009). "Train between Baramulla, Anantnag to be flagged off today". Online edition of The Hindu, dated 2009-02-14. Chennai, India. Archived from the original on 7 July 2009.
  19. ^ "Questions asked by Mr. Sharifud-Din Shariq during Lok Sabha session November – December 2009". 27 December 2009.
  20. ^ "GoI shelves vital railway projects in JK Lastupdate:- Fri, 13 Dec 2013 18:30:00 GMT GreaterKashmir.com". Archived from the original on 4 January 2014. Retrieved 3 January 2014.
  21. Outlook India, dated 2009-06-08. Archived from the original
    on 31 January 2013. Retrieved 1 June 2009.
  22. ^
    Indian Express
    , dated 2009-06-23. Retrieved 23 June 2009.
  23. ^ "Prime Minister dedicates Anantnag-Quazigund rail line in Kashmir to nation". Press Release, Press Information Bureau, Government of India. 28 October 2009. Retrieved 2 December 2009.
  24. ^ "Railways complete construction of crucial tunnel in Kashmir". Indian Express. New Delhi, India. 4 December 2010.
  25. ^ "Country's longest rail tunnel opens to trial in Valley". Hindustan Times. 28 December 2012. Retrieved 6 June 2019.
  26. ^ "Excavation for foundation of world's tallest rly bridge begins | Dail…". Archived from the original on 12 July 2012.
  27. ^ "The Tribune, Chandigarh, India - Jammu & Kashmir". Archived from the original on 29 November 2012. Retrieved 11 December 2012.
  28. ^ "Railways conduct trial run of Udhampur-Katra train".
  29. ^ "Centre approves Baramulla-Kupwara rail link". The Economic Times.
  30. ^ "Minister of Railways Lays the Foundation Stone for Five New Halt Stations Between Quazigund-Baramulla". 29 June 2017.
  31. ^ "Arch Closure Ceremony of Chenab Bridge on USBRL Project , Northern Railway". Youtube, USBRL, Northern Railways. Archived from the original on 22 December 2021.
  32. ^ Chenab Bridge: World's Highest Railway Arch Bridge Constructed In Jammu & Kashmir new Video 24/03/22, retrieved 24 March 2022
  33. ^ "Another milestone achieved in Udhampur-Srinagar Rail link Dream project".
  34. ^ "Final Location Survey of five lines has been sanctioned in Jammu and Kashmir". 20 December 2023.
  35. ^ "USBRL project CRS inspection concludes With high speed trial run".
  36. ^ "PM Modi Flags off Jammu-Kashmir's first electric train on Udhampur-Srinagar-Baramulla rail link". 20 February 2024.
  37. ^ "India's longest transportation tunnel opens in Jammu on Udhampur-Srinagar-Baramula rail link".
  38. ^ "Plans to connect Kashmir with rest of India through rail pushed to July". The Hindu. 21 February 2024.
  39. ^ bureau, Odisha Diary (29 June 2017). "Minister of Railways Lays The Foundation Stone For Five New Halt Stations Between Quazigund-Baramulla – OdishaDiary". orissadiary.com.
  40. ISSN 0971-751X
    . Retrieved 3 November 2019.
  41. ^ "Inauguration of Udhampur-Katra rail line delayed by a year". Archived from the original on 29 September 2012. Retrieved 23 July 2009.
  42. ^ "Katra to be linked by rail line by May next year". The Times of India. 12 January 2008. Archived from the original on 22 October 2012. Retrieved 26 November 2008.
  43. ^ Jupinderjit Singh (4 August 2009). "Work on Udhampur-Katra rail project to begin in Sept". The Tribune. Archived from the original on 7 October 2009. Retrieved 12 December 2009.
  44. ^ "J&K: Trains to go up to Katra from February". The Times of India. Archived from the original on 27 January 2014.
  45. ^ "jk-rail-line-to-be-operational-by-2017". The Times of India. 25 February 2011.
  46. ^ "Indian railways to chug into Kashmir by 2017". Archived from the original on 1 June 2011. Retrieved 1 June 2011.
  47. ^ "Connecting Kashmir Valley To India Via India's Longest Rail Tunnel". Archived from the original on 3 June 2011.
  48. ^ Suryamurthy, R. (30 May 2011). "Rail sees Valley link by end 2012". The Telegraph. Calcutta, India. Archived from the original on 11 September 2012.
  49. ^ a b "Welcome to Northern Railway Construction Organization (USBRL Project), INDIA".
  50. ^ Press Trust of India (25 November 2014). "PAC blames Railways for Rs 3,258 cr loss in Kashmir project". Business Standard India.
  51. ^ "Kashmir's missing link". The Times of India. 13 July 2014.
  52. ^ Press Trust of India (12 November 2014). "Katra-Banihal rail link: HC directs Centre to form committee". Business Standard India.
  53. ^ "PM, Sonia flag off train connecting Banihal in Jammu and Qazigund in Kashmir". The Times of India. Archived from the original on 29 June 2013.
  54. ^ "Indian Railways makes history, runs train through Asia's second longest tunnel".
  55. ^ "Archived copy" (PDF). Archived (PDF) from the original on 4 March 2016. Retrieved 2 July 2013.{{cite web}}: CS1 maint: archived copy as title (link)
  56. ^ "Construction on Iconic Chenab Rail Bridge Stops, Kashmir Rail Link Project Delayed Further".
  57. ^ "Kashmir railway project likely to miss 2020 deadline too". www.greaterkashmir.com. Archived from the original on 15 December 2018.
  58. ^ Jacob, Shine (19 August 2019). "Railway project to link Kashmir with rest of India put on fast track". Business Standard India.
  59. ^ "Udhampur-Srinagar-Baramulla Rail Link project to be completed by next year". mint. 14 February 2021. Retrieved 27 January 2022.
  60. ^ "Katra-Banihal link: Indian Railways completes over 75 percent of 37 bridges, 97.6 pc tunnelling work". mint. 17 August 2022. Retrieved 14 September 2022.
  61. ^ "World's highest railway bridge 'Golden joint' launched on Chenab in J&K". 14 August 2022.
  62. ^ @RailMinIndia (29 June 2017). "2/FIVE NEW HALT STATIONS INCLUDE..." (Tweet) – via Twitter.
  63. ^ "Credit war in Kashmir after Centre approves railway link". 30 November 2018.
  64. ^ "Rail network in Jammu and Kashmir likely to be extended to LoC". 12 September 2023.
  65. ^ "Salient Design Features of the Chenab and Anji Khad bridges" (PDF). Official webpage of the Konkan Railway Corporation Limited. Archived from the original (PDF) on 8 December 2003. Retrieved 14 August 2008.
  66. ^ "History and hope ride on Kashmir's hi-tech train". Online edition of the Economic Times, dated 2008-10-11. 11 October 2008. Retrieved 11 December 2008. [dead link]
  67. ^ "UDHAMPUR-SRINAGAR-BARAMULLA NEW B.G. RAILWAY LINE PROJECT:PIR PANJAR TUNNEL (ZONE VA and VB)". Official webpage of HCC. Archived from the original on 26 October 2007. Retrieved 2 December 2008.
  68. ^ "Bridges, Flyovers and Viaducts". Official webpage of AFCONS. Archived from the original on 8 July 2008. Retrieved 23 September 2008.
  69. ^ "Six labourers killed, 2 hurt in Reasi mishap". Online edition of The Tribune, dated 2008-04-18. Retrieved 16 May 2011.
  70. ^ "The Tribune, Chandigarh, India - Jammu & Kashmir".
  71. ^ "2 killed at rail project site". Online edition of The Tribune, dated 2011-03-27. Retrieved 13 August 2011.

External links