Mets–Willets Point station (IRT Flushing Line)
Mets–Willets Point Mets–Willets Point) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Structure | Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 2 side platforms (local) 1 island platform (express & northbound local) cross-platform interchange (northbound only) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 3 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | May 7, 1927 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rebuilt | April 24, 1939[2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accessible | Partially ADA-accessible (Northbound side (local) platform only; open only on game days and for special events[3]) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opposite- direction transfer | Yes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Former/other names | Willets Point Boulevard World's Fair Willets Point–Shea Stadium | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Traffic | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2023 | 1,818,251[4] 27.1% | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rank | 220 out of 423[4] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Mets–Willets Point station (formerly Willets Point–Shea Stadium station) is a
The station opened on May 7, 1927, as a local station named Willets Point Boulevard, with two side platforms and three tracks. It was rebuilt into the current layout of three tracks, two side platforms, and a center island platform for the 1939 New York World's Fair. The overpass to Flushing Meadows–Corona Park was rebuilt in the early 1940s. Ahead of the 1964 New York World's Fair, the original wooden platforms were replaced with more durable concrete slabs; shortly afterward, the station was renamed for the nearby Shea Stadium. After Shea Stadium was replaced by Citi Field in 2009, the station was renamed after the New York Mets baseball team, and a ramp was added to the Flushing-bound side platform. A connection to the proposed AirTrain LaGuardia people mover system was announced in 2015, but the people mover was canceled in 2023.
The station's peak use occurs during Mets games at Citi Field (and at Shea Stadium from 1964 until 2008), located on the north side of the station, and during events at the
History
Construction and opening
The 1913 Dual Contracts called for the Interborough Rapid Transit Company (IRT) and Brooklyn Rapid Transit Company (BRT; later Brooklyn–Manhattan Transit Corporation, or BMT) to build new lines in Brooklyn, Queens, and the Bronx. Queens did not receive many new IRT and BRT lines compared to Brooklyn and the Bronx, since the city's Public Service Commission (PSC) wanted to alleviate subway crowding in the other two boroughs first before building in Queens, which was relatively undeveloped. The IRT Flushing Line was to be one of two Dual Contracts lines in the borough, along with the Astoria Line; it would connect Flushing and Long Island City, two of Queens' oldest settlements, to Manhattan via the Steinway Tunnel. When the majority of the line was built in the early 1910s, most of the route went through undeveloped land, and Roosevelt Avenue had not been constructed.[7]: 47 Community leaders advocated for more Dual Contracts lines to be built in Queens to allow development there.[8] The Flushing Line west of 103rd Street opened in 1917.[9] The IRT agreed to operate the line under the condition that any loss of profits would be repaid by the city.[10] In 1923, the BMT started operating shuttle services along the Flushing Line, which terminated at Queensboro Plaza.[11]
As part of the Dual Contracts, the PSC would build the line eastward to at least
The BMT used wooden elevated rolling stock, as the Flushing Line was built to IRT clearances, and standard steel BMT subway rolling stock were not compatible.[11] Furthermore, because the Main Street station was underground, all elevated trains on the Flushing Line had to terminate at Willets Point Boulevard, as elevated trains were banned in subway tunnels.[19] On January 22, 1928, the line was extended one stop east to Main Street.[14] Afterward, Willets Point Boulevard was by far the least used station on the Flushing Line; it recorded 66,042 entries in 1930, whereas every other station on the line had at least one million passengers.[20] After the Long Island Rail Road closed its Whitestone Branch to the neighborhood of Whitestone in early 1932, there were proposals to connect the branch with the subway at the Willets Point Boulevard station,[21][22] but this did not happen.[23]
20th-century modifications
1939 World's Fair
The site just south of the Willets Point Boulevard station was remodeled into
Work on an overpass between the Willets Point Boulevard station and Flushing Meadows Park commenced in late 1937.[30] Ramps and stairs were built from each platform to the overpass, where 16 turnstiles and a canopy were installed.[31] Construction on the station itself began in January 1938, at which point the project had a budget of $494,000. The station had been revised to three tracks and three platforms. The center track and platform would be served by express trains that terminated at Willets Point Boulevard, while the outer two tracks would be used by local trains to Main Street. The IRT installed signals on the express track, which had previously been used as a storage track, and it built a power substation to allow for more frequent service.[30][31] The IRT bought 50 World's Fair Lo-V subway cars in conjunction with these upgrades.[32][33] World's Fair Special express trains began service on April 24, 1939.[34][35] The fair opened on April 30, and 110,689 people entered the station on that day alone.[36]
1940s and 1950s
The city government took over the IRT's operations on June 12, 1940.[37][38] After the World's Fair closed in October 1940, the Willets Point Boulevard station continued to operate, serving Flushing Meadows Park.[39][40] The overpass to Flushing Meadows Park was reconstructed in 1941.[41] As part of a pilot program aimed at reducing traffic congestion in midtown Manhattan,[42] a park and ride facility with 3,000 parking spots opened next to the Willets Point Boulevard station in November 1947.[43][44] Many of the Willets Point Boulevard station's riders came from the park-and-ride facility and from United Nations General Assembly meetings in Flushing Meadows Park, but the New York Daily News said in 1949 that the station "serves practically no resident population".[45]
The IRT routes were given numbered designations in 1948 with the introduction of
At the end of 1949, the city proposed diverting several bus routes that terminated in Flushing, sending these routes to Willets Point Boulevard.[45][53] The bus-terminal plan faced great opposition. Critics objected that business near the bus terminals in Flushing would decrease and that travel times from Willets Point Boulevard to points east would increase. Supporters of the plan noted the heavy traffic congestion on Flushing streets and the narrowness of the stairways at the Main Street station.[54] Super-express 7 trains started serving the station in 1953, running nonstop between Queensboro Plaza and Willets Point Boulevard during rush hours in the peak direction.[55][56] The super-express service was discontinued in 1956.[57]
1964 World's Fair and Shea Stadium
In 1960, the
With the opening of the World's Fair in April 1964, trains were lengthened to eleven cars,
One of Shea Stadium's parking lots, adjacent to the station, was expanded in 1978, becoming a park-and-ride facility with 1,500 spaces.[69] In 1983, Donald Trump proposed erecting a football stadium within Flushing Meadows–Corona Park and have the city government renovate the Willets Point subway station;[70] however, the stadium was never built.[71]
21st century
The MTA reintroduced express service to Manhattan at the conclusion of New York Mets weeknight games in July 2007.
After Shea Stadium was replaced with Citi Field in 2009, the Metropolitan Transportation Authority renamed the stop Mets–Willets Point, omitting the corporate-sponsored name associated with the current stadium.[76][77] Citigroup had sponsored the new baseball field but did not sign a naming rights deal with the MTA.[78] Had the naming rights deal been achieved, the station would have been known as Willets Point–Citi Field.[79] In conjunction with Citi Field's construction, the MTA also spent $40 million to renovate the subway and LIRR stations at Willets Point, including $18 million on the subway station.[76][77] The MTA repainted the station, replaced lighting, and renovated the platforms.[77] A ramp to the northbound side platform was rehabilitated, making that platform compliant with the Americans with Disabilities Act of 1990 (ADA).[80][81] However, the other platforms remained inaccessible, prompting protests from disability rights advocates.[81] Except for game days, the Mets–Willets Point station remained sparsely used, with 4,155 passengers on an average weekday in 2014.[82]
Unbuilt AirTrain station
On January 20, 2015, New York Governor
Station layout
Platform level |
Side platform | |
Southbound local | ← toward 34th Street–Hudson Yards (111th Street) ← AM rush toward 34th Street–Hudson Yards (Junction Boulevard) | |
Center track | ← special event service toward 34th Street–Hudson Yards (61st Street–Woodside) PM rush/evenings toward Flushing–Main Street (Terminus) → | |
Island platform | ||
Northbound local | toward Flushing–Main Street (Terminus) → | |
Side platform, special event service only | ||
Mezzanine | Fare control, station agent, MetroCard machines | |
Ground | Street level | Entrances/exits |
The Mets–Willets Point station contains three tracks and three platforms. From compass north to south, there is a southbound
West of the station, there are switches between the local tracks, the express track, and the northern layup track to
Exits
On the south side of the station, a wheelchair-accessible ramp connects the mezzanine and the northbound (southern) side platform to a
A wooden mezzanine is located underneath the tracks and platforms, with two ramps to the southbound platform and two stairways to the island platform.
Accessibility
The Mets–Willets Point station is generally not accessible to passengers with disabilities, except during sporting events, when the northbound side platform is open.[98][99] In 2009, the MTA built a ramp from the south side of Roosevelt Avenue to the station mezzanine.[98][80] The two existing ramps from the mezzanine to station level were modified to make them ADA-accessible; the work cost $4 million. The ramps are owned and maintained by the New York City Department of Parks and Recreation.[80]
Some riders with disabilities were unhappy that the station was not made completely accessible during the station's renovation. By contrast, other New York City Subway stations that serve sports venues, including
A footbridge had formerly extended north over Casey Stengel Plaza, leading to a long, circular staircase with turnstiles at the bottom, bringing people close to Gate E at Shea Stadium. In 2008, the footbridge and turnstiles were removed and replaced with a wider stairway which is now situated at Mets Plaza, close to Citi Field's Jackie Robinson Rotunda. The arrangement of turnstiles in the mezzanine was also reconfigured to improve the post-game pedestrian flows and allow fans to use all ramps, whether they were using the subway or walking across the Passarelle Boardwalk to reach the Long Island Rail Road station or parking lots in Flushing Meadows–Corona Park.[74]
Notes
- ^ The station is not marked as a wheelchair-accessible station on the New York City Subway map, even in the northbound direction.[101] The MTA also does not list the station as being wheelchair-accessible on its website.[102]
References
- ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
- ^ "Fast Subway Service to Fair Is Opened; Mayor Boards First Express at 6:25 A.M." The New York Times. April 25, 1939. p. 1. Archived from the original on June 16, 2018. Retrieved January 16, 2010.
- ^ "Mets - Willets Point Station Service Advisories". MTA New York City Transit. Archived from the original on April 22, 2009. Retrieved September 26, 2009.
- ^ a b "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
- ^ "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
- ^ a b c "7 Subway Timetable, Effective June 26, 2023". Metropolitan Transportation Authority. Retrieved August 26, 2023.
- ^ ISBN 978-0-82325-369-2.
- ^ "Move for Rapid Transit" (PDF). Newtown Register. December 2, 1909. p. 1. Retrieved September 30, 2017 – via Fultonhistory.com.
- ^ "Transit Service on Corona Extension of Dual Subway System Opened to the Public; First Train From Grand Central Station Carries City Officials and Business Men Over New Route;-The Event Celebrated Throughout the Borough of Queens". The New York Times. April 22, 1917. Archived from the original on March 4, 2016. Retrieved September 30, 2017.
- ^ a b "Flushing Line Risk Put on the City – Interborough Agrees to Equip and Operate Main St. Branch, but Won't Face a Loss – It May Be a Precedent – Company's Letter Thought to Outline Its Policy Toward Future Extensions of Existing Lines" (PDF). The New York Times. December 4, 1913. Archived (PDF) from the original on May 18, 2022. Retrieved September 18, 2015.
- ^ ProQuest 103096376.
- ^ "New Rapid Transit Commission Preparing Plans for Extension of Corona Line to Flushing – Board of Estimate Has Authorized Extension of Line From Corona to New Storage Yards Near Flushing River—Queensboro Subway to Have Connection With Proposed Eighth Avenue Line Near Times Square" (PDF). The New York Times. June 12, 1921. Archived (PDF) from the original on May 18, 2022. Retrieved September 18, 2015.
- ^ Poor's...1925. 1925. p. 523. Archived from the original on February 15, 2023. Retrieved October 19, 2022.
- ^ a b "Flushing Rejoices as Subway Opens – Service by B.M.T. and I.R.T. Begins as Soon as Official Train Makes First Run – Hope of 25 Years Realized – Pageant of Transportation Led by Indian and His Pony Marks the Celebration – Hedley Talks of Fare Rise – Transit Modes Depicted" (PDF). The New York Times. January 22, 1928. Retrieved September 18, 2015.
- ^ from the original on June 15, 2018. Retrieved October 19, 2022.
- ProQuest 1130954477.
- ^ "Dual Queens Celebration" (PDF). The New York Times. May 15, 1927. p. 3. Archived from the original on February 15, 2023. Retrieved October 2, 2011.
- ^ "Flushing to Celebrate" (PDF). The New York Times. May 13, 1927. p. 8. Archived from the original on February 15, 2023. Retrieved October 2, 2011.
- ProQuest 1112941793.
- ProQuest 1114167996.
- ProQuest 1114495396.
- from the original on October 19, 2022. Retrieved October 19, 2022.
- from the original on October 19, 2022. Retrieved October 19, 2022.
- ^ "Expanded Transit For Fair Is Asked; State and City Boards Join in Plea for Appropriation of $1,850,000" (PDF). The New York Times. December 24, 1936. Retrieved October 1, 2017.
- ISSN 0362-4331. Retrieved October 1, 2017.
- from the original on October 19, 2022. Retrieved October 19, 2022.
- from the original on October 19, 2022. Retrieved October 19, 2022.
- ProQuest 1266812738.
- from the original on October 19, 2022. Retrieved October 19, 2022.
- ^ ProQuest 1240588402.
- ^ from the original on October 19, 2022. Retrieved October 19, 2022.
- from the original on October 19, 2022. Retrieved October 19, 2022.
- ProQuest 1243080430.
- ^ "Fast Subway Service to Fair Is Opened; Mayor Boards First Express at 6:25 A.M." (PDF). The New York Times. April 25, 1939. Retrieved January 16, 2010.
- ProQuest 1255491255.
- from the original on October 19, 2022. Retrieved October 19, 2022.
- from the original on January 7, 2022. Retrieved May 14, 2022.
- ProQuest 1248134780.
- from the original on October 19, 2022. Retrieved October 19, 2022.
- ProQuest 1263415458.
- ^ "Fair Site Will Keep Train Connections". New York Daily News. April 3, 1941. p. 658. Archived from the original on October 19, 2022. Retrieved October 19, 2022.
- from the original on October 19, 2022. Retrieved October 19, 2022.
- from the original on October 19, 2022. Retrieved October 19, 2022.
- ProQuest 1313566889.
- ^ a b "Flushing Bus Terminal May Be Transferred". New York Daily News. December 26, 1949. p. 406. Archived from the original on October 19, 2022. Retrieved October 19, 2022.
- ^ Brown, Nicole (May 17, 2019). "How did the MTA subway lines get their letter or number? NYCurious". amNewYork. Archived from the original on March 2, 2021. Retrieved January 27, 2021.
- ^ Friedlander, Alex; Lonto, Arthur; Raudenbush, Henry (April 1960). "A Summary of Services on the IRT Division, NYCTA" (PDF). New York Division Bulletin. 3 (1). Electric Railroaders' Association: 2–3. Archived (PDF) from the original on September 14, 2020. Retrieved January 27, 2021.
- from the original on February 15, 2023. Retrieved October 7, 2017.
- from the original on April 29, 2018. Retrieved April 29, 2018.
- ProQuest 1325174459.
- ^ Minutes and Proceedings of the New York City Transit Authority. New York City Transit Authority. 1955. Archived from the original on September 13, 2020. Retrieved August 31, 2016.
- ^ "R17s to the Flushing Line". New York Division Bulletin. 5 (6). Electric Railroaders' Association: M-8. December 1962. Archived from the original on October 20, 2022. Retrieved October 20, 2022 – via Issuu.
- from the original on October 19, 2022. Retrieved October 19, 2022.
- ISSN 0362-4331. Retrieved October 1, 2017.
- from the original on October 20, 2022. Retrieved October 20, 2022.
- ProQuest 1322299710.
- ^ Linder, Bernard (December 1964). "Service Change". New York Division Bulletin. Electric Railroaders' Association.
- from the original on October 20, 2022. Retrieved October 20, 2022.
- ProQuest 1325112256.
- ProQuest 1327511197.
- from the original on October 20, 2022. Retrieved October 20, 2022.
- from the original on October 20, 2022. Retrieved October 20, 2022.
- from the original on October 20, 2022. Retrieved October 20, 2022.
- ^ ProQuest 895741554.
- ^ "TA to Show Fair Train". Long Island Star – Journal. August 31, 1963. Retrieved August 30, 2016 – via Fulton History.
- ProQuest 895766286.
- ISBN 9780823261932. Archivedfrom the original on February 15, 2023. Retrieved October 20, 2022.
- ^ from the original on October 20, 2022. Retrieved October 20, 2022.
- from the original on October 20, 2022. Retrieved October 20, 2022.
- from the original on October 20, 2022. Retrieved October 20, 2022.
- from the original on April 7, 2021. Retrieved October 20, 2022.
- ^ "MTA New York City Transit Introduces 7 Express Service After Mets Home Games" (Press release). New York City Transit. July 11, 2007. Archived from the original on October 16, 2007. Retrieved October 16, 2009.
- ^ Chan, Sewell (July 11, 2007). "After Mets Games, a Faster Ride Home by Train". City Room. Archived from the original on October 20, 2022. Retrieved October 20, 2022.
- ^ a b "New York City Transit Provides Enhanced Mets Post-Game 7 Express Service" (Press release). New York City Transit. April 9, 2008. Archived from the original on December 29, 2008. Retrieved October 16, 2009.
- ^ "7 Post Game Express Now Stops at Court Square on Game Nights" (Press release). New York City Transit. May 9, 2008. Archived from the original on September 18, 2012. Retrieved October 16, 2009.
- ^ a b Parker, Billy (March 12, 2009). "MTA the First to Officially *Not* Recognize the Name Citi Field". Gothamist. Archived from the original on October 20, 2022. Retrieved October 20, 2022.
- ^ a b c Neuman, William (March 11, 2009). "Mets Decline to Buy Name for Subway Station at Citi Field". The New York Times. Archived from the original on January 7, 2017. Retrieved October 24, 2015.
- from the original on October 20, 2022. Retrieved October 20, 2022.
- ^ Neuman, William (March 11, 2009). "Stadium Is Citi Field, but the Subway Stop Has Other Ideas". The New York Times. Archived from the original on April 2, 2009. Retrieved September 26, 2009.
- ^ a b c d e "Mets-Willets Point Station: A New Name and a Fresh Look" (Press release). MTA New York City Transit. April 10, 2009. Archived from the original on July 8, 2014. Retrieved September 26, 2009.
- ^ a b Parker, Billy (April 13, 2009). "Citi Field Becomes the New Apple of Met Fans' Eyes Tonight". Gothamist. Archived from the original on October 20, 2022. Retrieved October 20, 2022.
- ^ a b Honan, Katie (February 9, 2016). "Mets-Willets Pt. 7 Train Station Getting $48M Overhaul, MTA Says". DNAinfo New York. Archived from the original on November 27, 2022. Retrieved October 20, 2022.
- ^ Durkin, Erin (January 20, 2015). "Andrew Cuomo announces $450M plan to build AirTrain connecting LaGuardia Airport to the subway". New York Daily News. Archived from the original on January 21, 2015. Retrieved January 21, 2015.
- ^ Honan, Katie. "Cuomo Announces AirTrain to LaGuardia Airport from Subway, LIRR". DNAinfo. Archived from the original on January 20, 2015. Retrieved January 20, 2015.
- ^ Rivoli, Dan (May 9, 2017). "NYC firm hired for $14.6M to develop LaGuardia AirTrain proposal". New York Daily News. Archived from the original on May 12, 2017. Retrieved May 9, 2017.
- ^ "PANYNJ Proposed Capital Plan 2017-2026" (PDF). Port Authority of New York and New Jersey. January 11, 2017. Archived (PDF) from the original on February 2, 2017. Retrieved February 7, 2017.
- ^ Kessler, Eve (March 16, 2021). "Cuomo's 'Wrong Way AirTrain' Boondoggle Moves Ahead". Streetsblog NYC. Archived from the original on May 20, 2022. Retrieved August 17, 2022.
- ^ Duggan, Kevin (October 12, 2021). "Port Authority pauses $2.1B LaGuardia AirTrain plan to review alternatives at Hochul's request". AM New York. Archived from the original on June 11, 2022. Retrieved August 17, 2022.
- ^ Duggan, Kevin (March 2, 2022). "Port Authority reveals possible alternatives to LaGuardia AirTrain". AM New York. Archived from the original on June 10, 2022. Retrieved August 17, 2022.
- ^ Nessen, Stephen (March 3, 2022). "After scrapping Cuomo's AirTrain, Port Authority releases 14 other options". Gothamist. Archived from the original on August 17, 2022. Retrieved August 17, 2022.
- from the original on March 14, 2023. Retrieved March 13, 2023.
- ^ "LaGuardia AirTrain NYC: Hochul scraps plan and MTA, Port Authority improve bus service". ABC7 New York. March 13, 2023. Archived from the original on March 13, 2023. Retrieved March 14, 2023.
- ^ OCLC 49777633 – via Google Books.
- ^ "Subway Map" (PDF). Metropolitan Transportation Authority. September 2021. Retrieved September 17, 2021.
- Dropbox. Retrieved April 27, 2018.
- ^ a b c "18: Transit and Pedestrians". Willets Point Development Plan (PDF). New York City Department of City Planning. 2007. p. 18.7. Archived (PDF) from the original on March 2, 2017. Retrieved April 1, 2021.
- ^ "Mets encourage fans to take mass transit and arrive early to the Subway Series next week at Citi Field". Major League Baseball. May 8, 2014. Archived from the original on October 20, 2022. Retrieved October 20, 2022.
- ^ a b c "Accessibility at the Mets-Willets Point subway station". PCAC. June 21, 2009. Archived from the original on October 20, 2022. Retrieved October 20, 2022.
- ^ a b c "Mets/Willets Point Station". New York Mets. July 16, 2016. Archived from the original on August 19, 2016. Retrieved July 16, 2016.
- ^ Haddon, Heather (April 12, 2009). "Advocates: make Mets subway station accessible". AM New York.
- ^ "Subway Map" (PDF). Metropolitan Transportation Authority. September 2021. Retrieved September 17, 2021.
- ^ "MTA Accessible Stations". MTA. July 11, 2022. Archived from the original on December 10, 2021. Retrieved October 21, 2022.
- ^ Pesantez, Nathaly (February 20, 2019). "Transit Advocacy Group Places 40th Street Station Among 50 Subway Stops That Should Be Made Accessible". Sunnyside Post. Archived from the original on October 21, 2022. Retrieved October 21, 2022.
External links
- nycsubway.org – IRT Flushing Line: Willets Point/Shea Stadium
- Station Reporter — 7 Train
- The Subway Nut — Mets–Willets Point Pictures
- Willets Point entrance from Google Maps Street View
- Ramp entrance from Google Maps Street View
- Platforms from Google Maps Street View