42nd Street–Bryant Park/Fifth Avenue station

Coordinates: 40°45′17″N 73°59′03″W / 40.7548°N 73.9842°W / 40.7548; -73.9842
Source: Wikipedia, the free encyclopedia.

 42 Street–Bryant Park/
 5 Avenue
 
QM20
StructureUnderground
Levels2
Other information
AccessibleThe mezzanine is compliant with the Americans with Disabilities Act of 1990, but the platforms are not compliant ADA-accessible to mezzanine only; accessibility to platforms planned
Traffic
202354,266,441[a][2]Increase 20.5%
Rank1[a] out of 423[2]
Location
42nd Street–Bryant Park/Fifth Avenue station is located in New York City Subway
42nd Street–Bryant Park/Fifth Avenue station
42nd Street–Bryant Park/Fifth Avenue station is located in New York City
42nd Street–Bryant Park/Fifth Avenue station
42nd Street–Bryant Park/Fifth Avenue station is located in New York
42nd Street–Bryant Park/Fifth Avenue station
Street map

Map

Station service legend
Symbol Description
Stops all times Stops all times
Stops all times except late nights Stops all times except late nights
Stops rush hours in the peak direction only Stops rush hours in the peak direction only
Stops weekdays during the day Stops weekdays during the day

The 42nd Street–Bryant Park/Fifth Avenue station is an underground

<7>​​, ​A​, ​C​, ​E​, N, ​Q, ​R, ​W​, and S trains is open during the day from 6 a.m. to 12 a.m.[3]

The

Times Square. The Sixth Avenue Line platforms opened in 1940, completing construction of the first phase of the Independent Subway System (IND). Free out-of-system walking transfers between the stations on the two lines began being provided on weekdays in 1967, and an underground passageway was completed in 1971, allowing free in-system transfers. In 1998, the entire station complex was renovated. A free transfer to the Times Square station was opened in 2021 with the completion of a renovation project on the 42nd Street Shuttle. There are plans to add elevators to the station to make it compliant with the Americans with Disabilities Act of 1990
.

The IRT station has one island platform and two tracks and runs from west to east. The IND station has two island platforms and four tracks; it runs from north to south and is west of the IRT station. There is a mezzanine above the IRT platform, connected by a corridor to a mezzanine above much of the IND platform. A separate mezzanine exists above the extreme north end of the IND station. The 42nd Street–Bryant Park/Fifth Avenue complex served 17,213,702 passengers in 2019, making it the 13th busiest station in the subway system.[4]

History

Planning for a subway line in New York City dates to 1864.[5]: 21  However, development of what would become the city's first subway line did not start until 1894, when the New York State Legislature authorized the Rapid Transit Act.[5]: 139–140  The Rapid Transit Construction Company, organized by John B. McDonald and funded by August Belmont Jr., signed the initial Contract 1 with the Rapid Transit Commission in February 1900,[6] in which it would construct the subway and maintain a 50-year operating lease from the opening of the line.[5]: 165  Belmont incorporated the Interborough Rapid Transit Company (IRT) in April 1902 to operate the subway.[5]: 182  As part of the project, a section of tunnel under 42nd Street was constructed between the intersections of Park Avenue/41st Street and Broadway/47th Street. Degnon-McLean was awarded the contract to build this section of the line, and construction began on February 25, 1901.[6]

The first section of the line opened on October 27, 1904. The line did not serve Bryant Park directly; the nearest stations were

Grand Central, an express stop.[5]: 186  Additional lines opened in 1918, thereby dividing the original line into an H-shaped system.[7] The old route under 42nd Street became the 42nd Street Shuttle, which ran between Times Square and Grand Central without any intermediate stops.[8]

IRT Flushing Line

The

Grand Central–42nd Street and Queens had opened on June 22, 1915.[13]

Construction

In July 1920, the New York State Public Service Commission announced it would extend the Flushing Line two stops west to Times Square, with an intermediate station under Bryant Park. The western end of the Bryant Park station would be 300 feet (91 m) east of Sixth Avenue, while the eastern end would be about 100 feet (30 m) west of Fifth Avenue.[14][15] The 42nd Street Association, a local civic group, regarded the station as very important.[14] In May 1921, it was expected that contracts for the extension would be advertised shortly.[16]

On November 9, 1921, the New York State Transit Commission opened up the contract for the extension for bidding. The extension would take a slightly different route than the one specified in the Dual Contracts. The original proposal had the line constructed under 42nd Street to a point just to the east of Broadway, which would have forced riders transferring to the IRT Broadway–Seventh Avenue Line to walk a long distance.[17] On November 22, 1921, the Powers-Kennedy Contracting Corporation was awarded a contract to construct the extension on a low bid of $3,867,138, below the estimated cost of over $4 million.[17] This low bid was the narrowest margin ever recorded for any large city contract, beating out the next highest bidder by 0.7 percent. While the contractor was provided four years to complete work, engineers expected to reduce the time needed to do so to as little as three years. Since work on the project had to be completed underneath the foundations of several large buildings, such as theatres, and the north end of the New York Public Library, the contractor had to provide a $1 million bond.[18] The project was expected to reduce crowding on the 42nd Street Shuttle by enabling riders to use the Queensboro Subway to directly access Times Square. 24,000 of the estimated 100,000 daily shuttle riders transferred to and from the Queensboro Subway. The line was to extend as far as Eighth Avenue to connect with the proposed IND Eighth Avenue Line.[19][20]

Powers-Kennedy started excavating the line westward from Grand Central in May 1922. The Flushing Line extension was to run beneath the original line from Vanderbilt to Fifth Avenue,[21] running as little as 4 inches (100 mm) under the original line.[22] The tunnel also had to pass under a sewage line at Madison Avenue. The construction of the Fifth Avenue station required underpinning the New York Public Library Main Branch and extending the library's foundation downward.[22] The subway tunnel ran 35 feet (11 m) below ground level. During construction, workers took precautions to avoid interrupting the flow of traffic above ground and interfering with preexisting tunnels.[23] The contractors had completed the tunnels to Fifth Avenue by May 1923.[24] Local civic groups advocated for the Fifth Avenue station to be used as a temporary terminal while the permanent terminus at Times Square was being completed.[25][26] By the end of 1923, the Transit Commission had allocated $50,000 for the construction of a temporary crossover east of the Fifth Avenue station.[27]

The temporary terminal at Fifth Avenue was nearly complete by February 1926.[28][29] The station had two entrances on the south side of 42nd Street (one next to the library and the other next to the park). A third entrance was placed within the Stern's building on the north side.[28][29] Stern's funded the construction of the entrance inside its building, which also included storefront windows.[30] The entrance through the Stern's building did not open along with the rest of the station, and opened at a later point.[31] These entrances connected with a mezzanine above the platform. The platform was to be 480 feet (150 m) long, though only a 300-foot (91 m) section would be used initially as a double crossover to the east of the station still needed to be used while it was a terminal.[28][29] With the completion of the line to Eighth Avenue, the switch would be removed, and the platform could be extended.[31]

Opening and unification

The Fifth Avenue station on the Flushing Line was the first part of the complex to open.

The Fifth Avenue station opened on March 22, 1926, extending the IRT Flushing Line one stop to the west from the line's previous terminus at Grand Central.

Times Square on March 14, 1927,[35][36][37] following various delays.[34][38] The northern section of Bryant Park, which had been closed for four years during the line's construction, was restored shortly afterward.[39] By 1930, a fourth entrance to the Fifth Avenue station was being constructed from the basement of the Salmon Tower Building.[40]

The city government took over the IRT's operations on June 12, 1940.

Queensboro Plaza were extended in 1955–1956 to accommodate 11-car trains.[44]

IND Sixth Avenue Line

View of the mezzanine above the IND station

New York City mayor

Hudson & Manhattan Railroad (H&M)'s Uptown Hudson Tubes.[49] As a result, negotiations between the city and the H&M continued for several years.[50] The IND and H&M finally came to an agreement in 1930. The city had decided to build the IND Sixth Avenue Line's local tracks around the pre-existing H&M tubes, and add express tracks for the IND underneath the H&M tubes at a later date.[47] Also in 1930, the BOT identified the locations of 104 stations to be built in the IND system. Under this plan, there would have been a local station at Sixth Avenue and 42nd Street.[51]

The IND started advertising bids for the section of the Sixth Avenue Line between 43rd and 53rd Streets in April 1931.

Fiorello H. La Guardia announced that construction would start within six weeks.[58][59] The contractors were to excavate a construction shaft at Bryant Park (completing the shaft by April 1), upon which they would proceed northward.[60] La Guardia broke ground for the Sixth Avenue subway at Bryant Park on March 23, 1936.[61][62]

The line was built as a four-track tunnel north of 33rd Street (including the Rockefeller Center station), but there were only two tracks south of that street. The work largely involved

cut-and-cover excavations, although portions of the subway had to be tunneled through solid rock.[63] The builders also had to avoid disrupting the Sixth Avenue elevated or the various utility lines on the avenue,[64] and some of the pipes and wires had to be replaced in the process.[65] Excavation work was conducted 24 hours a day, with most of the blasting work being conducted at night.[63][66] Workers used small charges of dynamite to avoid damaging nearby buildings or the Catskill Aqueduct, which ran below Sixth Avenue and was a major part of the New York City water supply system.[67] The contractors built a compressor plant and a shaft at 46th Street, and they excavated another shaft at Bryant Park.[68]

Work on excavating the 42nd Street station was further complicated by the fact that it had to be built above the Flushing Line tunnel at 41st Street, but below the

West Fourth Street.[73] The opening of the Sixth Avenue Line relieved train traffic on the Eighth Avenue Line, which was used by all IND services except for the G Brooklyn–Queens Crosstown service.[74]

View of the IND platforms

The administration of mayor William O'Dwyer studied the possibility of converting the IND mezzanine and the adjacent passageway to Herald Square into a parking garage in mid-1946.[75] The city government examined three separate plans for a parking lot with 100 to 500 spaces.[76] BOT chairman Charles P. Gross dismissed the idea as prohibitively expensive.[76][77] In a 1951 report concerning the construction of bomb shelters in the subway system in the midst of the Cold War, the BOT proposed constructing a ramp between 40th Street and the 42nd Street–Bryant Park station.[78] In 1956, a marketplace for used books was proposed for the passageway leading to the 34th Street–Herald Square station.[79][80] By then, a gate at 40th Street blocked off access to the passageway from the 42nd Street–Bryant Park station.[80] The book mart would have housed the Fourth Avenue Booksellers Association, whose members declined an offer to relocate there.[79]

Station complex and later modifications

20th century

There initially was no direct connection between the IND's 42nd Street–Bryant Park station and the IRT's Fifth Avenue station, despite the fact that three other stations on the new line contained transfers to other services.[81] Though the BOT created free transfers at many points across the New York City Subway system in 1948, a free transfer was not added between the 42nd Street–Bryant Park and Fifth Avenue stations at the time because of heavy congestion in the "Times Square and 34th Street areas".[82] Starting on December 18, 1967, the New York City Transit Authority (NYCTA) provided paper tickets to passengers, allowing them to transfer between the IND and IRT stations for free during weekdays in the peak direction. Transfers to the IRT were distributed from 5 a.m. to noon, and transfers to the IND were distributed from noon to 8 p.m.. Passengers had to exit one station and use the sidewalk to enter the other. The paper tickets were a temporary measure until the NYCTA completed a passageway within fare control.[83]

Passageway between IRT Flushing Line and IND Sixth Avenue Line, opened in 1971

The NYCTA started constructing a 300-foot-long (91 m) passageway between the two stations in 1969. Workers dug a trench measuring 20 feet (6.1 m) wide and 35 feet (11 m) deep, then covered the trench with a 14-foot-deep (4.3 m) layer of fill. The project involved removing 14 plane trees from Bryant Park, which prompted protests from preservationists.[84] The developer of the nearby 1095 Avenue of the Americas office building contributed $500,000 to the station's renovation in exchange for permission to build additional office space.[85] About half of the tunnel was decorated with terrazzo floors; orange brick and tile walls; glass and steel railings; and recessed lighting.[86] The NYCTA completed the tunnel in 1971, upon which it was used by an average of 6,500 passengers during weekdays. The tunnel was decorated with eight porcelain murals, each measuring 10 feet (3.0 m) wide. The murals depicted historical and present-day structures at Bryant Park, including the Latting Observatory and New York Crystal Palace.[87]

In the late 1970s, the Flushing Line platform was painted beige as part of Operation Facelift, a system-wide refurbishment program led by

Phyllis Cerf Wagner.[88] The IND station had become rundown by the mid-1980s.[89] During this period, the IND mezzanine hosted various art exhibitions, including a showcase of schoolchildren's art[90] and portraits of subway riders from around the world.[91] The 42nd Street/Fifth Avenue station also recorded more felonies than almost any other New York City Subway station during the 1980s.[92] According to a 1986 study,passengers were more likely to be robbed at the 42nd Street/Fifth Avenue station than at any other place in the system.[93]

The Metropolitan Transportation Authority (MTA) announced in 1990 that it would spend $730 million to renovate 74 subway stations, including the 42nd Street station.[94] The passageway to the Herald Square station was closed the following year due to high crime.[95] In 1994, amid a funding shortfall, the administration of mayor Rudy Giuliani proposed delaying the station's renovation.[96][97] That October, the MTA announced it had "indefinitely" postponed plans for renovating the 42nd Street station.[94][98] The MTA again proposed renovating the station as part of its 1995–1999 capital plan.[99] Work was underway by mid-1999, but the project had fallen six months behind schedule, with a planned completion date of October 2002.[100] The IND station, which was formerly known simply as 42nd Street, was renamed 42nd Street–Bryant Park around 2003.[101]

21st century

In 2011, as part of a renovation of

Blackstone Group relocated the building's subway entrance eastward by several dozen feet.[102] As part of the development of 7 Bryant Park in 2012 and 2013,[103][104] the station entrance at the southwestern corner of 40th Street and Sixth Avenue was removed, and a new in-building accessible entrance was constructed at the northwestern corner of 39th Street and Sixth Avenue, completed by 2016.[105] The construction of the development had required a relocation of the street staircase at 40th Street to within the building per zoning requirements, but the developer, working with the MTA's Transit-Oriented Development, determined that the building and subway riders would benefit more from having the entrance at 39th Street. Removing the 40th Street entrance enabled the building to have its main entrance face Bryant Park.[106] The easement agreement between the MTA and the property developer was filed on May 14, 2012.[107]

Passageway between IND Sixth Avenue Line and 42nd Street Shuttle, opened in 2021

A transfer to the

Times Square was built as part of the 2015–2019 MTA Capital Program. A new platform for the shuttle, which would be 28 feet (8.5 m) wide and located between Tracks 1 and 4 (the outer tracks of the shuttle tunnel), replaced the existing curved platforms for tracks 1, 3, and 4. The platform was built along the section of the shuttle that runs under 42nd Street, which is located within a straight tunnel. The whole project was estimated to cost $235.41 million. The Times Square shuttle platform was extended 360 feet (110 m) east, and since an emergency point of egress had to be provided, it was also used to allow for a second point of entry at Sixth Avenue, with a connection to the IND Sixth Avenue Line platforms via a secondary mezzanine at the northern end of the platforms.[108][109][110] A construction contract was awarded in early 2019, with an estimated completion date of March 2022.[111][112] The free transfer opened on September 7, 2021, along with the new shuttle platform.[113]

In January 2020, the MTA announced plans to make the station complex accessible as part of the 42nd Street Connection Project. New elevators would be installed between platform level and the mezzanine of the Sixth Avenue Line station (one from each platform), a new elevator would be installed between the platform and mezzanine of the Flushing Line station, and two new stairs would be installed in the closed passageway to the W. R. Grace Building on the north side of 42nd Street between Fifth Avenue and Sixth Avenue. The project, which was to be completed between October 2021 and October 2023, would be bundled with developer and escalator improvement projects at Grand Central, and would be completed as part of a Design-Build procurement.[114] When the transfer passageway to the 42nd Street Shuttle opened, elevators were planned to be installed between the passageway and at least one of the platforms at a later date.[113]

The 39th Street easement entrance, along with eight other easement entrances in Manhattan, were closed early in 2020 at the request of building owners due to the COVID-19 pandemic.[115] The 39th Street entrance was the only entrance that remained closed in March 2022. In a response to a story by The City, an MTA spokesman said the entrance had been closed as the corridor at the bottom of the stairs had attracted illegal activities, and MTA Chairman Janno Lieber said that the agency did not have control over the developer.[116] In March 2024, the MTA installed low platform fences on the Flushing Line platform to reduce the likelihood of passengers falling onto the tracks. The yellow barriers, spaced along the length of the platform, do not have sliding platform screen doors between them.[117]

Service history

IRT station

When the Flushing Line station opened, it served as the western terminus of trains that traveled eastward to Queens.

rollsigns with numbered designations for each service.[119] The Times Square to Flushing route became known as the 7.[120] Express trains began running during the 1939 New York World's Fair.[121] Super-express 7 trains started serving the station in 1953, running nonstop between Queensboro Plaza and Willets Point Boulevard during rush hours in the peak direction,[122][123] but the super-express service was discontinued in 1956.[124]

IND station

When the Sixth Avenue Line station opened, the

KK train[131] until that route was discontinued in 1976.[132]

The Sixth Avenue Line station was also served by the JFK Express from 1978[133] to 1990 when it was discontinued.[134] When the Manhattan Bridge's north tracks were closed for repairs between 1986 and 1988, the Sixth Avenue Shuttle stopped at the station, running from 57th Street to Grand Street.[135] The Q train started running along the Sixth Avenue Line's express tracks in 1988[136] and continued to operate on the line until 2001.[137] The V train, which used the Sixth Avenue Line's local tracks, began serving the station in December 2001.[138] The V train was discontinued in 2010 and replaced by the M train.[139]

Station layout

Ground Street level Exit/entrance
Mezzanine Transfer passage Passageway to
42nd Street-Port Authority Bus Terminal
Mezzanine Fare control, station agent, transfer passageway between platforms
Elevators at:
  • northwest corner of 42nd Street and Sixth Avenue
  • South side of 42nd Street west of Sixth Avenue
  • West side of Sixth Avenue between 39th and 40th Streets
Note: Platform levels are not accessible through any elevator
Sixth Avenue
Line platforms
Northbound local "F" train"F" express train toward Jamaica–179th Street (47th–50th Streets–Rockefeller Center)
"M" train weekdays toward Forest Hills–71st Avenue (47th–50th Streets–Rockefeller Center)
Island platform
Northbound express "B" train weekdays toward Bedford Park Boulevard or 145th Street (47th–50th Streets–Rockefeller Center)
"D" train toward Norwood–205th Street (47th–50th Streets–Rockefeller Center)
Southbound express "B" train weekdays toward Brighton Beach (34th Street–Herald Square)
"D" train toward Coney Island–Stillwell Avenue via West End (34th Street–Herald Square)
Island platform
Southbound local "F" train"F" express train toward Coney Island–Stillwell Avenue via Culver (34th Street–Herald Square)
"M" train weekdays toward Middle Village–Metropolitan Avenue (34th Street–Herald Square)
Flushing Line
platforms
Southbound "7" train"7" express train toward 34th Street–Hudson Yards (Times Square–42nd Street)
Island platform
Northbound "7" train"7" express train toward Flushing–Main Street (Grand Central–42nd Street)

At 41st Street and Sixth Avenue, the IRT Flushing Line runs west–east and crosses underneath the IND Sixth Avenue Line, which runs north–south.[64][69] The IRT Flushing Line station is an express stop with two tracks and one island platform, while the IND Sixth Avenue Line station is an express stop with four tracks and two island platforms.[140]: 119, 124 

There are three elevators to street level: one each located on the northwestern and southwestern corners of Sixth Avenue and 42nd Street, and one on the western side of Sixth Avenue between 39th and 40th Streets. The first elevator serves a small mezzanine at the northern end of the Sixth Avenue Line platforms, while the latter two elevators serve a primary mezzanine above both sets of platforms. There are no elevators from either of the mezzanines to either platform level, so the station complex is not fully ADA-accessible, although the MTA plans to make the platforms accessible at a later date.[114]

Mezzanines

The IND station has two mezzanines above the two island platforms. The 42nd Street Shuttle, which passes perpendicularly over the Sixth Avenue Line at 42nd Street, divides the mezzanines.[141]: 45  A staircase from each platform goes up to the northern mezzanine, which consists of a small fare control area on the north side of 42nd Street. The southern mezzanine, south of 42nd Street, connects with the IRT Flushing Line platform and extends south to 40th Street. Four stairs lead from each platform to the southern mezzanine: two at the center of the platform and two near the south end of the platform.[140]: 119  The mezzanine has a florist, orange I-beam columns, lit-up ads, and space rentals along the walls.

The IRT mezzanine extends above most of the platform. Six stairs lead from the platform to the center of the mezzanine. The mezzanine slopes upward toward a set of

fare control areas at both ends. Near the western end, a ramp slopes down to the IND station.[140]
: 123 

Artwork

The walls of the passageway between the IRT and IND stations are decorated with a mosaic by Samm Kunce, Under Bryant Park, which was installed in 2002.[142][143] The artwork depicts pipes, rock outcroppings, and the roots of trees. According to Kunce, the artwork was based on the concept of systems.[143] The artwork also contains various quotations, including those by poets Ovid and James Joyce.[142] At the western end of the passageway (along the wall of the IND station's southern mezzanine) are depictions of dark rocks and plants, as well as a quote from philosopher Carl Jung: "Nature must not win the game, but she cannot lose".[143][144]

The walls of the mezzanine also contain light boxes for photographic exhibits.[145] The exhibits in the light boxes have included "The Great Escape", a series of nature-inspired photographs by Karine Laval, which were displayed starting in 2021.[146][147]

Closed Herald Square passageway

The IND station's southern mezzanine originally extended south from 42nd Street to the

Pennsylvania Station.[73] According to a 1940 report from the New York Herald Tribune, the passageway was believed to be "the longest of its kind in the world".[81]

In the 1980s, the passageway became a gathering spot for homeless people and drug users. On March 20, 1991, a woman was raped behind a pile of debris in the subway passageway during rush hour, which had entrances at 38th Street. Other commuters passed nearby but were unaware of what was happening. That passageway was closed the day after; it was used by 400 daily riders[152] and recorded 30 felonies since January 1, 1990. In response, on March 28, 1991, the NYCTA ordered the closing of the 15 most dangerous passageways in the system within a week, which the Transit Police and citizen advocacy groups had called for since the previous year. A woman was raped in the passageway in July 1990 with no response, but after another rape took place in August, the passageway's closure was called for by the local community board in September when a woman was raped in this passageway. Bureaucratic delays had prevented their closure, with their presentation to the MTA Board not scheduled until April 1991, after a public hearing on systemwide service reduction was to be held. The agency feared that closing the passageway without public comment would have caused an outcry for advocates for the homeless.[95] The NYCTA's director of public information said that the agency had erred in waiting for formal approval. The locations were chosen based on crime volume, lighting, traffic and physical layout. These entrances were closed under the declaration of a public safety emergency, and were blocked off with plywood and fencing until public hearings were held and official permission was obtained.[153]


Exits

IND section

High Entry-Exit Turnstiles (HEETs) provide access to and from the station. Outside fare control, a staircase goes up to the northeast corner of 42nd Street and Sixth Avenue.[140]: 119  In addition, two staircases and an elevator go up to the northwest corner.[140]: 119 [154] The northwest-corner entrance is a glass enclosure;[155] its glass roof contains a building-integrated photovoltaic (BIPV) installation, which produces some electricity for the structure.[156]

On the north end of the southern mezzanine is a fare control area and the passageway to the IRT Flushing Line. A ramp and staircase leads to an intermediate landing under 1095 Avenue of the Americas, where a stair and elevator leads to the street.[140]: 119  Two more staircases go up to the southeast corner of Sixth Avenue and 42nd Street.[140]: 119 [157] On the south end of this mezzanine is an unstaffed bank of regular and HEET turnstiles. Outside fare control, there are three staircases going up to the northwest, northeast, and southeast corners of 40th Street and Sixth Avenue with the northwestern one being built inside a building.[140]: 119 [157] There is another exit at the northwest corner of Sixth Avenue and 39th Street.[107][157] The entrance has a 10 ft (3.0 m)-wide stairway and elevator from street level to a 15 ft (4.6 m)-wide passageway leading to the station.[107] This replaced an entrance at the southwest corner of 40th Street and Sixth Avenue.[106]

IRT section

Entrance to the IRT section of the complex in front of the New York Public Library Main Branch

The IRT station has a full-length mezzanine directly above the platform and tracks; the full-time entrance is on the eastern end. A single stair on the southwest corner of 5th Avenue and 42nd Street (in front of the New York Public Library Main Branch) goes down to an area with a turnstile bank.[140]: 123 [157] This entrance was built within the library's stone balustrade.[28][29] Near the western end is another fare control area with HEETs.[140]: 123  Past the HEETs, two stairs ascend to the south side of 42nd Street between Fifth and Sixth Avenues on the northern edge of Bryant Park.[157]

There is a closed passageway from the mezzanine to an easement entrance in the Grace Building on the north side of 42nd Street between Fifth Avenue and Sixth Avenue. This entrance closed before 2004.[141]: 39 

IND Sixth Avenue Line platforms

 42 Street–Bryant Park
 
<F> two rush hour trains, peak direction (two rush hour trains, peak direction)
   M weekdays during the day (weekdays during the day)
Platforms2 island platforms
cross-platform interchange
Tracks4
Other information
OpenedDecember 15, 1940; 83 years ago (1940-12-15)
AccessibleThe mezzanine is compliant with the Americans with Disabilities Act of 1990, but the platforms are not compliant ADA-accessible to mezzanine only; accessibility to platforms planned
AccessibilityCross-platform wheelchair transfer available
Opposite-
direction
transfer
Yes
Services
Preceding station New York City Subway New York City Subway Following station
<F> two rush hour trains, peak directionM weekdays during the day
<F> two rush hour trains, peak directionM weekdays during the day
Track layout

Station service legend
Symbol Description
Stops all times Stops all times
Stops all times except late nights Stops all times except late nights
Stops weekdays during the day Stops weekdays during the day
Stops rush hours in the peak direction only (limited service) Stops rush hours in the peak direction only (limited service)

The 42nd Street–Bryant Park station on the IND Sixth Avenue Line is an express station with four tracks and two island platforms, which are 670 feet (200 m) long.[158] The station is served by the B train during weekdays until 11:00 p.m.,[159] the D train at all times,[160] the F train at all times,[161] and the M train during weekdays until 9:00 p.m.[162] Two <F> trains serve the station during rush hours in the peak direction (northbound in the morning and southbound in the afternoon).[161] The F, <F>, and M trains use the local tracks, and the B and D trains use the express tracks.[163]

Both outer track walls have a scarlet red trim line with a chocolate brown border and small tile captions reading "42" in white on black run below them at regular intervals. Red I-beam columns run along both sides of both platforms at regular intervals with alternating ones having the standard black station name plate in white lettering.

The ceiling of the platform level is held up by columns located every 15 feet (4.6 m), which support girders underneath the station's full-length mezzanine. The floor of the mezzanine is also supported by cross beams spaced every 5 feet (1.5 m), placed between the girders. The roof of the mezzanine is about 10 feet (3.0 m) below street level.[158]: 11 

One stair ascends from the north end of either platform to a passageway, which in turn connects to the

Nick Cave, Every One (2021), is installed in the passageway between the Times Square and 42nd Street–Bryant Park stations.[164][165] It consists of a mosaic flanking 11 digital screens; one side of the mosaic measures 143 feet (44 m) long and the other measures 179 feet (55 m) long.[165]

South of this station, there are three sets of crossovers, allowing trains to switch between all four tracks. Those switches are not currently used in revenue service. The crossovers were reconfigured to reduce the duplication of track switches of the downtown and uptown tracks, most notably, the switch from the express to local tracks.[166]

IRT Flushing Line platform

 5 Avenue
 
<7> rush hours until 9:30 p.m., peak direction (rush hours until 9:30 p.m., peak direction)​
Platforms1 island platform
Tracks2
Other information
OpenedMarch 22, 1926; 98 years ago (1926-03-22)
AccessibleThe mezzanine is compliant with the Americans with Disabilities Act of 1990, but the platforms are not compliant ADA-accessible to mezzanine only; accessibility to platforms planned
Opposite-
direction
transfer
Yes
Former/other namesFifth Avenue–Bryant Park
Services
Preceding station New York City Subway New York City Subway Following station
<7> rush hours until 9:30 p.m., peak direction
<7> rush hours until 9:30 p.m., peak direction
Track layout

to
Grand Central–42nd Street
to
Times Square–42nd Street
Station service legend
Symbol Description
Stops all times Stops all times
Stops all times except late nights Stops all times except late nights
Stops rush hours in the peak direction only Stops rush hours in the peak direction only

The Fifth Avenue station (signed as Fifth Avenue–Bryant Park) on the

<7> train on weekdays in the peak direction (westbound in the morning, eastbound in the afternoon).[167]

The ceiling of the platform level is held up by columns located every 15 feet (4.6 m), which support girders underneath the station's full-length mezzanine. The floor of the mezzanine is also supported by cross beams spaced every 5 feet (1.5 m), placed between the girders. Above the mezzanine, there are ventilation grates directly behind the parapet that surrounds Bryant Park.[158]: 24  The platform walls have a mosaic golden trimline with "5" tablets at regular intervals along it.

The Fifth Avenue station is the first within the subway system to receive a vending machine that dispenses make up and other retail products. Part of a pilot program to increase retail activity within the MTA system, it capitalized on a new trend in vending machine development when it was installed in 2013.[168]

Notes

References

  1. ^ a b c "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  2. ^ a b "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
  3. ^ a b "Subway Map" (PDF). Metropolitan Transportation Authority. September 2021. Retrieved September 17, 2021.
  4. ^ "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
  5. ^ a b c d e Walker, James Blaine (1918). Fifty Years of Rapid Transit — 1864 to 1917. New York, N.Y.: Law Printing. Retrieved November 6, 2016.
  6. ^ a b Report of the Board of Rapid Transit Railroad Commissioners for the City of New York For The Year Ending December 31, 1904 Accompanied By Reports of the Chief Engineer and of the Auditor. Board of Rapid Transit Railroad Commissioners. 1905. pp. 229–236.
  7. (PDF) from the original on February 21, 2021. Retrieved October 4, 2011.
  8. (PDF) from the original on February 21, 2021. Retrieved October 4, 2011.
  9. (PDF) from the original on July 7, 2021. Retrieved November 10, 2017.
  10. ^ a b Rogoff, David (1960). "The Steinway Tunnels". Electric Railroads. No. 29. Electric Railroaders' Association. Archived from the original on December 10, 2019. Retrieved December 22, 2020.
  11. from the original on April 25, 2022. Retrieved August 26, 2009.
  12. ^ New Subways For New York: The Dual System of Rapid Transit Chapter 1: Dual System of Rapid Transit. New York State Public Service Commission. 1913. Archived from the original on January 11, 2021. Retrieved December 22, 2020.
  13. from the original on April 14, 2018. Retrieved April 14, 2018.
  14. ^ from the original on July 12, 2022. Retrieved July 12, 2022.
  15. .
  16. ^ "East River Subway Nears Completion: Transit Commission Consulting Engineer Reports on Tube Construction". New York Herald. May 15, 1921. Archived from the original on July 15, 2022. Retrieved July 12, 2022.
  17. ^ a b "Queensboro Tube to be Extended West: Bids for Construction of Subway Over to 8th Ave. to be Opened Wednesday; Two Years' Job". New-York Tribune. November 6, 1922. Archived from the original on July 15, 2022. Retrieved July 12, 2022.
  18. ^ "Subway Bids 0.7 P.C. Apart: Unprecedentedly Small Difference in Estimates Offered". The Brooklyn Times Union. November 28, 1921. Archived from the original on July 15, 2022. Retrieved July 12, 2022.
  19. from the original on July 12, 2022. Retrieved July 12, 2022.
  20. .
  21. from the original on July 12, 2022. Retrieved July 12, 2022.
  22. ^ from the original on July 12, 2022. Retrieved July 12, 2022.
  23. from the original on August 14, 2019. Retrieved August 14, 2019.
  24. .
  25. from the original on July 12, 2022. Retrieved July 12, 2022.
  26. .
  27. from the original on July 12, 2022. Retrieved July 12, 2022.
  28. ^ from the original on July 10, 2022. Retrieved July 10, 2022.
  29. ^ .
  30. .
  31. ^ from the original on August 14, 2019. Retrieved July 10, 2022.
  32. ^ .
  33. ^ Annual Report of the Interborough Rapid Transit Company For The Year Ended June 30, 1925. Interborough Rapid Transit Company. 1925. p. 4. Archived from the original on July 10, 2022. Retrieved July 10, 2022.
  34. ^ from the original on July 15, 2022. Retrieved July 14, 2022.
  35. from the original on August 14, 2019. Retrieved July 10, 2022.
  36. .
  37. ^ State of New York Department of Public Service Metropolitan Division Transit Commission Seventh Annual Report For The Calendar Year 1927. New York State Transit Commission. 1928. p. 13.
  38. ProQuest 1113525665
    .
  39. from the original on August 15, 2019. Retrieved August 15, 2019.
  40. .
  41. from the original on January 7, 2022. Retrieved May 14, 2022.
  42. .
  43. .
  44. ^ Minutes and Proceedings of the New York City Transit Authority. New York City Transit Authority. 1955. Archived from the original on April 21, 2022. Retrieved December 6, 2020.
  45. from the original on June 30, 2019. Retrieved August 1, 2019.
  46. from the original on June 28, 2019. Retrieved August 1, 2019.
  47. ^ from the original on April 28, 2018. Retrieved April 27, 2018.
  48. from the original on April 9, 2018. Retrieved April 8, 2018.
  49. from the original on April 26, 2018. Retrieved April 26, 2018.
  50. from the original on April 26, 2018. Retrieved April 26, 2018.
  51. from the original on June 30, 2018. Retrieved July 14, 2022.
  52. from the original on April 28, 2018. Retrieved April 28, 2018.
  53. from the original on April 28, 2018. Retrieved April 28, 2018.
  54. from the original on April 16, 2018. Retrieved July 10, 2022.
  55. .
  56. from the original on April 28, 2018. Retrieved April 28, 2018.
  57. .
  58. from the original on December 5, 2021. Retrieved July 14, 2022.
  59. .
  60. from the original on March 17, 2018. Retrieved July 14, 2022.
  61. from the original on July 10, 2022. Retrieved July 10, 2022.
  62. .
  63. ^ .
  64. ^ .
  65. .
  66. from the original on July 11, 2022. Retrieved July 11, 2022.
  67. .
  68. .
  69. ^ from the original on July 10, 2022. Retrieved July 10, 2022.
  70. .
  71. from the original on April 26, 2018. Retrieved April 26, 2018.
  72. .
  73. ^ a b c d "New Subway Line on 6th Ave. Opens at Midnight Fete". The New York Times. December 15, 1940. p. 1. Archived from the original on May 15, 2018. Retrieved October 7, 2011.
  74. from the original on April 16, 2018. Retrieved April 15, 2018.
  75. .
  76. ^ .
  77. from the original on July 15, 2022. Retrieved July 14, 2022.
  78. from the original on July 15, 2022. Retrieved July 14, 2022.
  79. ^ . Retrieved July 14, 2022.
  80. ^ .
  81. ^ .
  82. .
  83. from the original on April 29, 2018. Retrieved June 5, 2016.
  84. . Retrieved July 12, 2022.
  85. . Retrieved July 12, 2022.
  86. from the original on February 22, 2020. Retrieved July 11, 2022.
  87. from the original on December 16, 2021. Retrieved July 12, 2022.
  88. from the original on July 15, 2022. Retrieved July 14, 2022.
  89. from the original on May 24, 2015. Retrieved July 14, 2022.
  90. from the original on November 21, 2017. Retrieved July 14, 2022.
  91. from the original on May 24, 2015. Retrieved July 14, 2022.
  92. from the original on May 24, 2015. Retrieved July 14, 2022.
  93. .
  94. ^ from the original on July 5, 2022. Retrieved July 4, 2022.
  95. ^ from the original on August 20, 2017. Retrieved February 1, 2018.
  96. ^ Rein, Lisa (May 24, 1994). "Citing cuts, TA derails Main St. rehab". New York Daily News. p. 683. Archived from the original on July 11, 2022. Retrieved July 11, 2022.
  97. ProQuest 278734171
    .
  98. ^ Kalikow, Peter (October 27, 1994). "The Coliseum Could Lay a Golden Egg". Newsday. pp. 44, 48. Retrieved May 31, 2023.
  99. from the original on May 26, 2015. Retrieved July 14, 2022.
  100. from the original on September 13, 2017. Retrieved July 14, 2022.
  101. from the original on March 22, 2019. Retrieved July 14, 2022.
  102. from the original on July 5, 2012. Retrieved July 11, 2022.
  103. ^ "1058 Avenue of the Americas". Google Maps. August 2012. Archived from the original on July 15, 2022. Retrieved July 10, 2022.
  104. ^ "101 West 40th Street". Google Maps. August 2013. Archived from the original on July 15, 2022. Retrieved July 10, 2022.
  105. ^ "1041 Avenue of the Ameircas". Google Maps. May 2016. Archived from the original on July 15, 2022. Retrieved July 10, 2022.
  106. ^ a b "Transit-Oriented Development Program". mta.info. Metropolitan Transportation Authority. Archived from the original on July 10, 2022. Retrieved July 10, 2022.
  107. ^ a b c "Pacolet-Milliken Enterprises, Inc. With New York City Transit Authority Easement Agreement Dated: As of April 30, 2012". New York City Department of Finance. May 14, 2012. Archived from the original on March 26, 2022. Retrieved July 10, 2022.
  108. ^ "Metropolitan Transportation Authority (MTA) Notice of Public Hearing and Description of Projects – Tuesday, August 23, 2016 4:30 P.M. – Request for Federal Financial Assistance Under the Federal Transportation Authorization For Federal Fiscal Year 2017 Capital Improvement Projects" (PDF). mta.info. Metropolitan Transportation Authority. July 28, 2016. Archived from the original (PDF) on August 17, 2016. Retrieved August 7, 2016.
  109. ^ "MTA Capital Program 2015-2019" (PDF). mta.info. Metropolitan Transportation Authority. October 28, 2015. Archived (PDF) from the original on November 6, 2015. Retrieved December 17, 2016.
  110. ^ "T7041404 Reconstruction of Times Square Shuttle - Phase 3". web.mta.info. Metropolitan Transportation Authority. Archived from the original on September 3, 2017. Retrieved September 3, 2017.
  111. ^ "Capital Program Oversight Committee Meeting - March 2019" (PDF). mta.info. Metropolitan Transportation Authority. March 25, 2019. p. 11. Archived (PDF) from the original on January 10, 2021. Retrieved September 23, 2018.
  112. ^ "T7041404 Reconstruction of Times Square Shuttle - Phase 3". mta.info. Metropolitan Transportation Authority. Archived from the original on September 3, 2017. Retrieved September 3, 2017.
  113. ^ a b c d Guse, Clayton (September 8, 2021). "MTA opens new walkway between Times Square and Bryant Park subway stations, revamped shuttle platforms". New York Daily News. Archived from the original on September 9, 2021. Retrieved September 9, 2021.
  114. ^ a b "Capital Program Oversight Committee Meeting January 2020". Metropolitan Transportation Authority. January 21, 2020. p. 19. Archived from the original on January 10, 2021. Retrieved September 19, 2020.
  115. ^ Martinez, Jose (October 4, 2020). "Closed Private Subway Entrances Give Shuttered Feel to Manhattan Office Buildings and Former Hotspots". The City. Archived from the original on January 16, 2021. Retrieved July 10, 2022.
  116. ^ Martinez, Jose (March 17, 2022). "Privately Owned Midtown Subway Entrance Still Closed as City Pushes for Comeback". The City. Archived from the original on July 15, 2022. Retrieved July 10, 2022.
  117. ^ Rahhal, Emily; Rosoff, Henry (March 25, 2024). "Subway barriers installed at Bryant Park station". PIX11. Retrieved March 26, 2024.
  118. ^ Korman, Joseph (December 29, 2016). "Line Names". thejoekorner.com. Archived from the original on April 10, 2021. Retrieved April 29, 2018.
  119. ^ Brown, Nicole (May 17, 2019). "How did the MTA subway lines get their letter or number? NYCurious". amNewYork. Archived from the original on March 2, 2021. Retrieved January 27, 2021.
  120. ^ Friedlander, Alex; Lonto, Arthur; Raudenbush, Henry (April 1960). "A Summary of Services on the IRT Division, NYCTA" (PDF). New York Division Bulletin. 3 (1). Electric Railroaders' Association: 2–3. Archived (PDF) from the original on September 14, 2020. Retrieved January 27, 2021.
  121. ^ "Fast Subway Service to Fair Is Opened" (PDF). The New York Times. April 25, 1939. p. 1. Retrieved October 2, 2011.
  122. from the original on October 20, 2022. Retrieved October 20, 2022.
  123. .
  124. ^ Linder, Bernard (December 1964). "Service Change". New York Division Bulletin. Electric Railroaders' Association.
  125. from the original on June 17, 2018. Retrieved April 15, 2018.
  126. .
  127. ^ Perlmutter, Emanuel (November 27, 1967). "BMT-IND CHANGES BEWILDER MANY; Transit Authority Swamped With Calls From Riders as New System Starts". The New York Times. Archived from the original on June 16, 2018. Retrieved August 23, 2015.
  128. .
  129. from the original on December 16, 2021. Retrieved September 18, 2017.
  130. from the original on July 11, 2022. Retrieved July 11, 2022.
  131. from the original on November 28, 2016. Retrieved November 27, 2016.
  132. from the original on September 16, 2017. Retrieved July 26, 2017.
  133. . Retrieved June 10, 2023.
  134. ^ The New York Times (March 11, 1990). "JFK express subway to be discontinued". New York City: Observer–Reporter. p. 54. Retrieved July 22, 2016.
  135. ^ Annual Report on 1989 Rapid Routes Schedules and Service Planning. New York City Transit Authority, Operations Planning Department. June 1, 1990. p. 56.
  136. from the original on March 6, 2016. Retrieved May 16, 2023.
  137. from the original on September 29, 2015. Retrieved May 16, 2023.
  138. from the original on March 25, 2010. Retrieved October 14, 2016.
  139. ^ DeJesus, Juan (June 25, 2010). "Last Stop: New Yorkers Bid Adieu to V and W". WNBC. Retrieved June 25, 2010.
  140. ^ a b c d e f g h i j "12: Transportation". East Midtown Rezoning and Related Actions Final Environmental Impact Statement (PDF). New York City Department of City Planning. 2013. p. 124. Archived (PDF) from the original on August 11, 2019. Retrieved April 1, 2021.
  141. ^ a b No. 7 Subway Extension—Hudson Yards Rezoning and Development Program Final Generic Environmental Impact Statement - Appendix S4 (PDF). New York City Department of City Planning. 2004. Archived (PDF) from the original on January 21, 2022. Retrieved July 10, 2022.
  142. ^ from the original on January 24, 2021. Retrieved July 14, 2022.
  143. ^ a b c "Arts & Design - NYCT Permanent Art". MTA. Archived from the original on June 15, 2022. Retrieved July 14, 2022.
  144. from the original on March 24, 2022. Retrieved July 14, 2022.
  145. ^ "Photography". Metropolitan Transportation Authority. Retrieved May 8, 2023.
  146. ^ "The Great Escape". Metropolitan Transportation Authority. Retrieved May 8, 2023.
  147. from the original on July 15, 2022. Retrieved July 14, 2022.
  148. ^ Kahn, E. J.; Ross, Harold (May 4, 1940). "Underground". New Yorker. Archived from the original on July 28, 2011. Retrieved July 23, 2015.
  149. ^
    ProQuest 1260972732
    .
  150. from the original on July 15, 2022. Retrieved July 14, 2022.
  151. ^ Diamond, Randy (March 22, 1991). "Subway rape". New York Daily News. p. 12. Archived from the original on February 7, 2020. Retrieved February 24, 2019.
  152. ^ "Tunnel vision". New York Daily News. March 30, 1991. p. 19. Archived from the original on February 7, 2020. Retrieved February 24, 2019.
  153. ^ "Bank of America and The Durst Organization Break Ground On the Bank of America Tower at One Bryant Park in New York City" (Press release). Bank of America Corporation. August 2, 2004. Archived from the original on October 23, 2007. Retrieved October 19, 2007.
  154. ^ "One Bryant Park". The Durst Organization. Archived from the original on September 11, 2021. Retrieved September 11, 2021.
  155. ^ Snoonian, Deborah (November 2004). "Green grows up... and up and up and up" (PDF). Architectural Record. Vol. 192. p. 45. Archived (PDF) from the original on November 4, 2021. Retrieved July 12, 2022.
  156. ^ a b c d e "MTA Neighborhood Maps: Midtown West" (PDF). mta.info. Metropolitan Transportation Authority. 2015. Archived (PDF) from the original on July 24, 2015. Retrieved December 11, 2015.
  157. ^ a b c d "Station ADA Accessibility Analysis 2017 Station: 42nd Street". New York City Transit. 2019. Archived from the original on July 15, 2022. Retrieved July 10, 2022.
  158. ^ "B Subway Timetable, Effective December 4, 2022". Metropolitan Transportation Authority. Retrieved August 26, 2023.
  159. ^ "D Subway Timetable, Effective January 23, 2023". Metropolitan Transportation Authority. Retrieved August 26, 2023.
  160. ^ a b "F Subway Timetable, Effective August 28, 2023". Metropolitan Transportation Authority. Retrieved August 26, 2023.
  161. ^ "M Subway Timetable, Effective August 28, 2023". Metropolitan Transportation Authority. Retrieved August 26, 2023.
  162. ^ "Subway Service Guide" (PDF). Metropolitan Transportation Authority. September 2019. Retrieved September 22, 2019.
  163. ^ Yakas, Ben (September 8, 2021). "Photos: Nick Cave's Mosaics Grace New 42nd Street Shuttle Connector". Gothamist. Archived from the original on September 10, 2021. Retrieved September 10, 2021.
  164. ^ from the original on June 19, 2022. Retrieved September 7, 2021.
  165. .
  166. ^ "7 Subway Timetable, Effective June 26, 2023". Metropolitan Transportation Authority. Retrieved August 26, 2023.
  167. ^ "MTA Pilots Virtual Retail in Subway". mta.info. Metropolitan Transportation Authority. October 30, 2013. Archived from the original on December 10, 2021. Retrieved January 19, 2022.

External links

nycsubway.org:

Others:

Google Maps Street View: