Line 314: Line 314:
{{as of|2020}}, three SLS versions are planned: Block 1, Block 1B, and Block 2. Each will use the same Core Stage with four main engines, but Block 1B will feature the [[Exploration Upper Stage]] (EUS), and Block 2 will combine the EUS with upgraded boosters.<ref name="AuthAct10">{{cite web|url=http://commerce.senate.gov/public/index.cfm?p=Legislation&ContentRecord_id=8d7c1465-f852-4835-ba84-25faf56bbb36&ContentType_id=03ab50f5-55cd-4934-a074-d6928b9dd24c&Group_id=6eaa2a03-6e69-4e43-8597-bb12f4f5aede|work=Featured Legislation|title=The NASA Authorization Act of 2010|date=July 15, 2010 |publisher=U.S. Senate|archive-url=https://web.archive.org/web/20110410161657/https://www.commerce.senate.gov/public/index.cfm?p=Legislation&ContentRecord_id=8d7c1465-f852-4835-ba84-25faf56bbb36&ContentType_id=03ab50f5-55cd-4934-a074-d6928b9dd24c&Group_id=6eaa2a03-6e69-4e43-8597-bb12f4f5aede|archive-date=April 10, 2011|url-status=dead|access-date=May 26, 2011}} {{PD-notice}}</ref><ref name=slsfact-20171011/><ref>{{cite web|url=http://www.space.com/12957-nasa-giant-rocket-space-launch-system-infographic.html|title=Space Launch System: NASA's Giant Rocket Explained|author=Karl Tate|date=16 September 2011|publisher=Space.com|access-date=26 January 2012|archive-date=27 January 2012|archive-url=https://web.archive.org/web/20120127120812/http://www.space.com/12957-nasa-giant-rocket-space-launch-system-infographic.html|url-status=live}}</ref> In mid-November 2014, construction of the first Core Stage hardware began using a new welding system in the South Vertical Assembly Building at NASA's [[Michoud Assembly Facility]].<ref>{{cite web|url=http://www.nasa.gov/sls/14-171.html#.VGfrNb4_ypc|title=SLS Engine Section Barrel Hot off the Vertical Weld Center at Michoud|publisher=NASA|access-date=16 November 2014|archive-date=19 November 2014|archive-url=https://web.archive.org/web/20141119072126/http://www.nasa.gov/sls/14-171.html#.VGfrNb4_ypc|url-status=live}} {{PD-notice}}</ref> Between 2015 and 2017, NASA test fired RS-25 engines in preparation for use on SLS.<ref name="NSFStennis012015">{{cite web|last1=Campbell|first1=Lloyd|title=NASA conducts 13th test of Space Launch System RS-25 engine|url=http://www.spaceflightinsider.com/space-centers/stennis-space-center/nasa-conducts-13th-test-space-launch-system-rs-25-engine/|publisher=SpaceflightInsider.com|date=25 March 2017|access-date=29 April 2017|archive-date=26 April 2019|archive-url=https://web.archive.org/web/20190426153013/https://www.spaceflightinsider.com/space-centers/stennis-space-center/nasa-conducts-13th-test-space-launch-system-rs-25-engine/|url-status=live}}</ref> As of late 2015, the SLS program was stated to have a 70% confidence level for the first crewed Orion flight by 2023,<ref>{{cite web|url=http://spacenews.com/first-crewed-orion-mission-may-slip-to-2023/|title=First Crewed Orion Mission May Slip to 2023|last=Foust|first=Jeff|date=September 16, 2015|publisher=SpaceNews|access-date=June 23, 2016|archive-date=30 September 2021|archive-url=https://web.archive.org/web/20210930001748/https://spacenews.com/first-crewed-orion-mission-may-slip-to-2023/|url-status=live}}</ref><ref>{{cite web|url=https://spaceflightnow.com/2015/09/16/orion-spacecraft-may-not-fly-with-astronauts-until-2023/|title=Orion spacecraft may not fly with astronauts until 2023|last=Clark|first=Stephen|date=September 16, 2015|website=spaceflightnow.com|access-date=June 23, 2016|archive-date=1 July 2016|archive-url=https://web.archive.org/web/20160701155403/https://spaceflightnow.com/2015/09/16/orion-spacecraft-may-not-fly-with-astronauts-until-2023/|url-status=live}}</ref><ref>{{cite web|url=http://www.spacepolicyonline.com/news/mikulski-deeply-troubled-by-nasas-budget-request-sls-wont-use-70-percent-jcl|title=Mikulski "Deeply Troubled" by NASA's Budget Request; SLS Won't Use 70 Percent JCL|last=Clark|first=Smith|date=May 1, 2014|website=spacepolicyonline.com|access-date=June 23, 2016|archive-date=5 August 2016|archive-url=https://web.archive.org/web/20160805085633/http://www.spacepolicyonline.com/news/mikulski-deeply-troubled-by-nasas-budget-request-sls-wont-use-70-percent-jcl|url-status=live}}</ref> and {{asof|2020|lc=y}}, NASA is continuing to project a 2023 launch.<ref name="IG-20-018">{{cite web|url=https://oig.nasa.gov/docs/IG-20-018.pdf|title=Report No. IG-20-018: NASA's Management of the Orion Multi-Purpose Crew Vehicle Program|work=Office of Inspector General (United States)|publisher=NASA|date=July 16, 2020|access-date=July 17, 2020|archive-date=19 July 2020|archive-url=https://web.archive.org/web/20200719030636/https://oig.nasa.gov/docs/IG-20-018.pdf|url-status=live}} {{PD-notice}}</ref>
{{as of|2020}}, three SLS versions are planned: Block 1, Block 1B, and Block 2. Each will use the same Core Stage with four main engines, but Block 1B will feature the [[Exploration Upper Stage]] (EUS), and Block 2 will combine the EUS with upgraded boosters.<ref name="AuthAct10">{{cite web|url=http://commerce.senate.gov/public/index.cfm?p=Legislation&ContentRecord_id=8d7c1465-f852-4835-ba84-25faf56bbb36&ContentType_id=03ab50f5-55cd-4934-a074-d6928b9dd24c&Group_id=6eaa2a03-6e69-4e43-8597-bb12f4f5aede|work=Featured Legislation|title=The NASA Authorization Act of 2010|date=July 15, 2010 |publisher=U.S. Senate|archive-url=https://web.archive.org/web/20110410161657/https://www.commerce.senate.gov/public/index.cfm?p=Legislation&ContentRecord_id=8d7c1465-f852-4835-ba84-25faf56bbb36&ContentType_id=03ab50f5-55cd-4934-a074-d6928b9dd24c&Group_id=6eaa2a03-6e69-4e43-8597-bb12f4f5aede|archive-date=April 10, 2011|url-status=dead|access-date=May 26, 2011}} {{PD-notice}}</ref><ref name=slsfact-20171011/><ref>{{cite web|url=http://www.space.com/12957-nasa-giant-rocket-space-launch-system-infographic.html|title=Space Launch System: NASA's Giant Rocket Explained|author=Karl Tate|date=16 September 2011|publisher=Space.com|access-date=26 January 2012|archive-date=27 January 2012|archive-url=https://web.archive.org/web/20120127120812/http://www.space.com/12957-nasa-giant-rocket-space-launch-system-infographic.html|url-status=live}}</ref> In mid-November 2014, construction of the first Core Stage hardware began using a new welding system in the South Vertical Assembly Building at NASA's [[Michoud Assembly Facility]].<ref>{{cite web|url=http://www.nasa.gov/sls/14-171.html#.VGfrNb4_ypc|title=SLS Engine Section Barrel Hot off the Vertical Weld Center at Michoud|publisher=NASA|access-date=16 November 2014|archive-date=19 November 2014|archive-url=https://web.archive.org/web/20141119072126/http://www.nasa.gov/sls/14-171.html#.VGfrNb4_ypc|url-status=live}} {{PD-notice}}</ref> Between 2015 and 2017, NASA test fired RS-25 engines in preparation for use on SLS.<ref name="NSFStennis012015">{{cite web|last1=Campbell|first1=Lloyd|title=NASA conducts 13th test of Space Launch System RS-25 engine|url=http://www.spaceflightinsider.com/space-centers/stennis-space-center/nasa-conducts-13th-test-space-launch-system-rs-25-engine/|publisher=SpaceflightInsider.com|date=25 March 2017|access-date=29 April 2017|archive-date=26 April 2019|archive-url=https://web.archive.org/web/20190426153013/https://www.spaceflightinsider.com/space-centers/stennis-space-center/nasa-conducts-13th-test-space-launch-system-rs-25-engine/|url-status=live}}</ref> As of late 2015, the SLS program was stated to have a 70% confidence level for the first crewed Orion flight by 2023,<ref>{{cite web|url=http://spacenews.com/first-crewed-orion-mission-may-slip-to-2023/|title=First Crewed Orion Mission May Slip to 2023|last=Foust|first=Jeff|date=September 16, 2015|publisher=SpaceNews|access-date=June 23, 2016|archive-date=30 September 2021|archive-url=https://web.archive.org/web/20210930001748/https://spacenews.com/first-crewed-orion-mission-may-slip-to-2023/|url-status=live}}</ref><ref>{{cite web|url=https://spaceflightnow.com/2015/09/16/orion-spacecraft-may-not-fly-with-astronauts-until-2023/|title=Orion spacecraft may not fly with astronauts until 2023|last=Clark|first=Stephen|date=September 16, 2015|website=spaceflightnow.com|access-date=June 23, 2016|archive-date=1 July 2016|archive-url=https://web.archive.org/web/20160701155403/https://spaceflightnow.com/2015/09/16/orion-spacecraft-may-not-fly-with-astronauts-until-2023/|url-status=live}}</ref><ref>{{cite web|url=http://www.spacepolicyonline.com/news/mikulski-deeply-troubled-by-nasas-budget-request-sls-wont-use-70-percent-jcl|title=Mikulski "Deeply Troubled" by NASA's Budget Request; SLS Won't Use 70 Percent JCL|last=Clark|first=Smith|date=May 1, 2014|website=spacepolicyonline.com|access-date=June 23, 2016|archive-date=5 August 2016|archive-url=https://web.archive.org/web/20160805085633/http://www.spacepolicyonline.com/news/mikulski-deeply-troubled-by-nasas-budget-request-sls-wont-use-70-percent-jcl|url-status=live}}</ref> and {{asof|2020|lc=y}}, NASA is continuing to project a 2023 launch.<ref name="IG-20-018">{{cite web|url=https://oig.nasa.gov/docs/IG-20-018.pdf|title=Report No. IG-20-018: NASA's Management of the Orion Multi-Purpose Crew Vehicle Program|work=Office of Inspector General (United States)|publisher=NASA|date=July 16, 2020|access-date=July 17, 2020|archive-date=19 July 2020|archive-url=https://web.archive.org/web/20200719030636/https://oig.nasa.gov/docs/IG-20-018.pdf|url-status=live}} {{PD-notice}}</ref>


A [[Test article (aerospace)|test article]] build for the Core Stage began on 5 January 2016 and was expected to be completed in late January 2016.{{citation needed|date=January 2021}}<!-- Seriously? Did NASA/Boeing actually begin the build of a core stage and actually expect to complete it one month later??? Strong statements need strong sources --> Once completed the test article was to be sent to ensure structural integrity at [[Marshall Space Flight Center]].{{update after|2017}}<!-- so did this ever happen? --> A structural test article of the ICPS{{clarify|date=January 2021}} was delivered in 2015.<ref name="SlSUpdate2016">{{cite web|url=https://www.nasa.gov/exploration/systems/sls/multimedia/four-engines-attached-to-sls-core-stage-for-artemis-I-mission.html|title=All Four Engines Are Attached to the SLS Core Stage for Artemis I Mission|website=nasa.gov|access-date=2019-11-12|archive-date=12 November 2019|archive-url=https://web.archive.org/web/20191112214328/https://www.nasa.gov/exploration/systems/sls/multimedia/four-engines-attached-to-sls-core-stage-for-artemis-I-mission.html|url-status=live}} {{PD-notice}}</ref> the Core Stage for [[Artemis 1]] completed the assembly in November 2019.{{citation needed|date=August 2020}}
The Core Stage for the first SLS, built at [[Michoud Assembly Facility]], had all four engines attached in November 2019,<ref name="SlSUpdate2016">{{cite web|url=https://www.nasa.gov/exploration/systems/sls/multimedia/four-engines-attached-to-sls-core-stage-for-artemis-I-mission.html|title=All Four Engines Are Attached to the SLS Core Stage for Artemis I Mission|website=nasa.gov|access-date=2019-11-12|archive-date=12 November 2019|archive-url=https://web.archive.org/web/20191112214328/https://www.nasa.gov/exploration/systems/sls/multimedia/four-engines-attached-to-sls-core-stage-for-artemis-I-mission.html|url-status=live}} {{PD-notice}}</ref>, and it was declared finished by NASA in December 2019.<ref>{{cite web |last1=Clark |first1=Stephen |title=NASA declares first SLS core stage complete |url=https://spaceflightnow.com/2019/12/15/nasa-declares-first-sls-core-stage-complete/ |publisher=Spaceflight Now |access-date=7 October 2021 |date=15 December 2019}}</ref>


The first Core Stage left Michoud for comprehensive testing at Stennis in January 2020.<ref>{{cite news|url=https://www.bbc.com/news/science-environment-51048986|title=Nasa Moon rocket core leaves for testing|last=Rincon|first=Paul|date=2020-01-09|access-date=2020-01-09|archive-date=9 January 2020|archive-url=https://web.archive.org/web/20200109151551/https://www.bbc.com/news/science-environment-51048986|url-status=live}}</ref> The static firing test program at [[Stennis Space Center]], known as the Green Run, operated all the Core Stage systems simultaneously for the first time.<ref>{{cite web|url=https://www.nasaspaceflight.com/2019/12/boeing-nasa-sls-core-stage-green-run-campaign-stennis/|title=Boeing, NASA getting ready for SLS Core Stage Green Run campaign ahead of Stennis arrival|date=2019-12-14|publisher=NASASpaceFlight.com|access-date=2020-01-09|archive-date=30 September 2021|archive-url=https://web.archive.org/web/20210930001752/https://www.nasaspaceflight.com/2019/12/boeing-nasa-sls-core-stage-green-run-campaign-stennis/|url-status=live}}</ref><ref>{{cite web|url=https://www.nextbigfuture.com/2019/08/nasa-will-have-8-minute-hold-down-test-in-2020.html|title=NASA Will Have 8 Minute Hold Down Test in 2020|access-date=August 2, 2019|archive-date=2 August 2019|archive-url=https://web.archive.org/web/20190802192558/https://www.nextbigfuture.com/2019/08/nasa-will-have-8-minute-hold-down-test-in-2020.html|url-status=live}}</ref> Test 7 (of 8), the wet dress rehearsal, was carried out in December 2020 and the fire (test 8) took place on 16 January 2021, but shut down earlier than expected,<ref>{{cite web|last1=Foust|first1=Jeff|title=Green Run hotfire test ends early|url=https://spacenews.com/green-run-hotfire-test-ends-early/|publisher=SpaceNews|access-date=17 January 2021|date=16 January 2021|archive-date=3 October 2021|archive-url=https://web.archive.org/web/20211003032149/https://spacenews.com/green-run-hotfire-test-ends-early/|url-status=live}}</ref> about 67 seconds in total rather than the desired eight minutes. The reason for the early shutdown was later reported to be because of conservative test commit criteria on the thrust vector control system, specific only for ground testing and not for flight. If this scenario occurred during a flight, the rocket would have continued to fly normally. There was no sign of damage to the Core Stage or the engines, contrary to initial concerns.<ref>{{cite web|last1=Rincon|first1=Paul|title=SLS: Nasa finds cause of 'megarocket' test shutdown|url=https://www.bbc.co.uk/news/science-environment-55727686|publisher=BBC News|access-date=20 January 2021|date=20 January 2021|archive-date=20 January 2021|archive-url=https://web.archive.org/web/20210120041016/https://www.bbc.co.uk/news/science-environment-55727686|url-status=live}}</ref> The second fire test was completed on 18 March 2021, with all 4 engines igniting, throttling down as expected to simulate in-flight conditions, and gimballing profiles.
The first Core Stage left [[Michoud Assembly Facility]] for comprehensive testing at [[Stennis Space Center]] in January 2020.<ref>{{cite news|url=https://www.bbc.com/news/science-environment-51048986|title=Nasa Moon rocket core leaves for testing|last=Rincon|first=Paul|date=2020-01-09|access-date=2020-01-09|archive-date=9 January 2020|archive-url=https://web.archive.org/web/20200109151551/https://www.bbc.com/news/science-environment-51048986|url-status=live}}</ref> The static firing test program at [[Stennis Space Center]], known as the Green Run, operated all the Core Stage systems simultaneously for the first time.<ref>{{cite web|url=https://www.nasaspaceflight.com/2019/12/boeing-nasa-sls-core-stage-green-run-campaign-stennis/|title=Boeing, NASA getting ready for SLS Core Stage Green Run campaign ahead of Stennis arrival|date=2019-12-14|publisher=NASASpaceFlight.com|access-date=2020-01-09|archive-date=30 September 2021|archive-url=https://web.archive.org/web/20210930001752/https://www.nasaspaceflight.com/2019/12/boeing-nasa-sls-core-stage-green-run-campaign-stennis/|url-status=live}}</ref><ref>{{cite web|url=https://www.nextbigfuture.com/2019/08/nasa-will-have-8-minute-hold-down-test-in-2020.html|title=NASA Will Have 8 Minute Hold Down Test in 2020|access-date=August 2, 2019|archive-date=2 August 2019|archive-url=https://web.archive.org/web/20190802192558/https://www.nextbigfuture.com/2019/08/nasa-will-have-8-minute-hold-down-test-in-2020.html|url-status=live}}</ref> Test 7 (of 8), the wet dress rehearsal, was carried out in December 2020 and the fire (test 8) took place on 16 January 2021, but shut down earlier than expected,<ref>{{cite web|last1=Foust|first1=Jeff|title=Green Run hotfire test ends early|url=https://spacenews.com/green-run-hotfire-test-ends-early/|publisher=SpaceNews|access-date=17 January 2021|date=16 January 2021|archive-date=3 October 2021|archive-url=https://web.archive.org/web/20211003032149/https://spacenews.com/green-run-hotfire-test-ends-early/|url-status=live}}</ref> about 67 seconds in total rather than the desired eight minutes. The reason for the early shutdown was later reported to be because of conservative test commit criteria on the thrust vector control system, specific only for ground testing and not for flight. If this scenario occurred during a flight, the rocket would have continued to fly normally. There was no sign of damage to the Core Stage or the engines, contrary to initial concerns.<ref>{{cite web|last1=Rincon|first1=Paul|title=SLS: Nasa finds cause of 'megarocket' test shutdown|url=https://www.bbc.co.uk/news/science-environment-55727686|publisher=BBC News|access-date=20 January 2021|date=20 January 2021|archive-date=20 January 2021|archive-url=https://web.archive.org/web/20210120041016/https://www.bbc.co.uk/news/science-environment-55727686|url-status=live}}</ref> The second fire test was completed on 18 March 2021, with all 4 engines igniting, throttling down as expected to simulate in-flight conditions, and gimballing profiles.
The Core Stage was shipped to [[Kennedy Space Center]] to be mated with the rest of the rocket for Artemis 1. It left Stennis on April 24 and arrived at Kennedy on April 27.<ref>{{Cite web|url=http://www.nasa.gov/image-feature/space-launch-system-core-stage-arrives-at-the-kennedy-space-center|title=Space Launch System Core Stage Arrives at the Kennedy Space Center|first=Brian|last=Dunbar|date=29 April 2021|website=NASA|access-date=1 June 2021|archive-date=7 May 2021|archive-url=https://web.archive.org/web/20210507205846/http://www.nasa.gov/image-feature/space-launch-system-core-stage-arrives-at-the-kennedy-space-center/|url-status=live}}</ref> It was refurbished there in preparation for stacking.<ref>{{Cite web|last=Sloss|first=Philip|date=2021-05-20|title=SLS Core Stage thermal protection system refurbishment in work at Kennedy for Artemis 1|url=https://www.nasaspaceflight.com/2021/05/tps-repairs-core-stage-work-updatei/|access-date=2021-05-26|website=NASASpaceFlight.com|language=en-US|archive-date=26 May 2021|archive-url=https://web.archive.org/web/20210526143900/https://www.nasaspaceflight.com/2021/05/tps-repairs-core-stage-work-updatei/|url-status=live}}</ref> On 12 June 2021, NASA announced the assembly of the first SLS rocket was completed at the Kennedy Space Center. The assembled SLS is planned to be used for the unmanned [[Artemis 1]] mission in 2022.<ref name="nsf-20210929" />
The Core Stage was shipped to [[Kennedy Space Center]] to be mated with the rest of the rocket for Artemis 1. It left Stennis on April 24 and arrived at Kennedy on April 27.<ref>{{Cite web|url=http://www.nasa.gov/image-feature/space-launch-system-core-stage-arrives-at-the-kennedy-space-center|title=Space Launch System Core Stage Arrives at the Kennedy Space Center|first=Brian|last=Dunbar|date=29 April 2021|website=NASA|access-date=1 June 2021|archive-date=7 May 2021|archive-url=https://web.archive.org/web/20210507205846/http://www.nasa.gov/image-feature/space-launch-system-core-stage-arrives-at-the-kennedy-space-center/|url-status=live}}</ref> It was refurbished there in preparation for stacking.<ref>{{Cite web|last=Sloss|first=Philip|date=2021-05-20|title=SLS Core Stage thermal protection system refurbishment in work at Kennedy for Artemis 1|url=https://www.nasaspaceflight.com/2021/05/tps-repairs-core-stage-work-updatei/|access-date=2021-05-26|website=NASASpaceFlight.com|language=en-US|archive-date=26 May 2021|archive-url=https://web.archive.org/web/20210526143900/https://www.nasaspaceflight.com/2021/05/tps-repairs-core-stage-work-updatei/|url-status=live}}</ref> On 12 June 2021, NASA announced the assembly of the first SLS rocket was completed at the Kennedy Space Center. The assembled SLS is planned to be used for the unmanned [[Artemis 1]] mission in 2022.<ref name="nsf-20210929" />



Revision as of 05:26, 7 October 2021

Space Launch System
A rocket beside a tower on pad
An artist's rendering of SLS Block 1 with Orion spacecraft on the pad before launch.
FunctionSuper heavy-lift launch vehicle
Country of originUnited States
Project costUS$21.2 billion (as of 2021)[12]
Cost per launchOver US$2 billion excluding development (estimate)[note 1][14][15]
Cost per yearUS$2.5 billion for 2020[1]
Size
Height111.25 m (365.0 ft), Block 2 Cargo
Diameter8.4 m (28 ft), Core Stage
Stages2
Capacity
Payload to LEO[altitude and inclination needed]
Mass
  • Block 1: 95 t (209,000 lb) [16]
  • Block 1B: >100 t (220,000 lb)[17]
  • Block 2: 130 t (290,000 lb) [18]
Payload to trans-lunar injection
Mass
  • Block 1: > 27 t (60,000 lb) [19][20]
  • Block 1B Crew: 38 t (83,700 lb)
  • Block 1B Cargo: 42 t (92,500 lb)
  • Block 2 Crew: > 43 t (94,700 lb)
  • Block 2 Cargo: > 46 t (101,400 lb)
Associated rockets
Comparable
Launch history
StatusAwaiting first launch
Launch sitesKennedy Space Center, LC-39B
First flightNET January 2022[21]
Type of passengers/cargoOrion
Stage info
Boosters (Block 1, 1B)
No. boosters2 five-segment Solid Rocket Boosters
Height54 m (177 ft) [22]
Gross mass730 t (1,610,000 lb) [22]
Powered byoff
Maximum thrust14.6 MN (3,300,000 lbf) sea level
16 MN (1,600 tf; 3,600,000 lbf) vacuum[23]
Total thrust29.2 MN (6,600,000 lbf) sea level
32 MN (3,300 tf; 7,200,000 lbf) vacuum [23]
Specific impulse269 s (2.64 km/s)
Burn time126 seconds
PropellantPBAN, APCP
First stage (Block 1, 1B, 2) – Core stage
Height65 m (212 ft) [24]
Diameter8.4 m (27.6 ft)
Empty mass85 t (187,990 lb)
Gross mass1,073 t (2,365,000 lb)
Powered by4 RS-25D/E [24]
Maximum thrust9.1 MN (2,000,000 lbf) vacuum[25]
Specific impulse366 s (3.59 km/s) (sea level)
452 s (4.43 km/s)[25]
Burn time480 seconds
PropellantLH2 / LOX
Second stage (Block 1) – ICPS
Height13.7 m (45 ft)[26]
Diameter5 m (16 ft)
Empty mass3,490 kg (7,690 lb)[27]
Gross mass32,066 kg (70,693 lb)
Powered by1 RL10B-2
Maximum thrust110.1 kN (24,800 lbf)
Specific impulse465.5 s (4.565 km/s)[28]
Burn time1125 seconds
PropellantLH2 / LOX
Second stage (Block 1B, Block 2) – Exploration Upper Stage
Height17.3 m (57 ft)[27]
Diameter8.4 m (28 ft)
Powered by4 RL10C-3, later 4 RL10C-X
Maximum thrust407.2 kN (91,500 lbf)[27]
Burn time
  • 350 seconds (LEO ascent)
  • 925 seconds (TLI burn)
[27]
PropellantLH2 / LOX

The Space Launch System (SLS) is an American super heavy-lift expendable launch vehicle, under development by NASA since 2011. It replaced the Ares I and Ares V launch vehicles, which were cancelled along with the rest of the Constellation program.[29][30][31] Like those proposals, it is derived from the Space Shuttle.

The SLS is intended to become the primary launch vehicle of NASA's deep space exploration plans throughout the 2020s and beyond, with planned crewed lunar flights of the Artemis program and a possible follow-on human mission to Mars.[32][33][34][35][36] The SLS is being developed in three major phases with increasing capabilities: Block 1, Block 1B, and Block 2.[16] As of 22 December 2019, SLS Block 1 launch vehicles are planned to launch the first three Artemis missions.[37] After this point Block 1B will take over until the introduction of Block 2.[38][36][39]

The SLS is planned to launch the Orion spacecraft as part of the Artemis program and use the ground operations and launch facilities at NASA's Kennedy Space Center in Florida. Artemis will use one SLS each year until at least 2030.[40] The rocket will use the Launch Complex 39B at the Kennedy Space Center. The first launch was originally scheduled for 2016,[41] but it has slipped at least eight times, adding more than five years to the original six-year schedule.[note 2] As of September 2021, the first launch is scheduled for no earlier than January 2022.[21][42]

Description

The SLS is a Space Shuttle-derived launch vehicle, with the first stage of the rocket being powered by one central Core Stage and two outboard solid rocket boosters (SRBs). All SLS Blocks share a common design for the Core Stage to avoid the need for redesigns to meet varying requirements.[43][44][45][46] The SLS is designed to be able to tolerate up to 23 tanking cycles, 13 are reserved for launch attempts on Artemis 1. The assembled rocket is to be able to remain at the launch pad for at least 180 days and can remain in a stacked configuration for at least 200 days.[47][48]

SLS Block Differences
Block Boosters Upper Stage
1 5-segment Shuttle-derived boosters Interim Cryogenic Propulsion Stage (ICPS)
1B Exploration Upper Stage (EUS)
2 Booster Obsolescence and Life Extension (BOLE)
Payload mass to...
SLS variants Low Earth orbit (LEO) Trans-lunar injection (TLI) Heliocentric orbit (HCO)
Block 1 95 t[16] > 27 t[49] ?
Block 1B 105 t[50] 42 t[49]
Block 2 130 t[18] > 46 t[49] 45 t[16]

Core Stage

The Space Launch System Core Stage rolling out of the Michoud Facility for shipping to Stennis

The Core Stage is responsible for propelling the upper stage and payload out of the atmopshere with the assistance of the SRBs and accelerating up to almost orbital velocity. It contains the fuel and oxidizer tanks for the ascent phase, the forward and aft SRB attach points, avionics, and the Main Propulsion System (MPS). The MPS is responsible for supplying the four

oxidizer. The first four flights will each use and expend four of the remaining sixteen RS-25D engines that had previously flown on Space Shuttle missions.[54][55] Aerojet Rocketdyne modified these engines with modernized engine controllers, higher throttle limits, as well as insulation for the high temperatures the engine section will experience from the SRBs.[56] Later flights will switch to an expendable optimized RS-25 variant, lowering per engine costs by over 30%.[57][58] Boeing manufactures the Core Stage at NASA's Michoud Assembly Facility.[59]

Boosters

SLS Booster test at
Solid Rocket Boosters (SRBs). These SRBs use segments that were flown on Shuttle flights as parts of the four-segment Space Shuttle Solid Rocket Boosters, with the addition of a center booster segment, new avionics, lighter and insulation, and without a parachute recovery system.[60] The five-segment SRBs provide approximately 25% more total impulse than the Shuttle SRB, but will no longer be recovered after use.[61][62]
Enough Shuttle booster segments remain to build the sixteen boosters needed for the first eight SLS launches.

The stock of SLS Block 1 to 1B boosters is limited by the number of casings leftover from the Shuttle program, which is enough for eight flights of the SLS.

Northrop Grumman Innovation Systems for further SLS flights, marking the beginning of Block 2. These boosters will be derived from the composite-casing SRBs in development for the now-canceled OmegA launch vehicle, and are projected to increase Block 2's payload to 130 metric tons (130 long tons; 140 short tons) to LEO and at least 46 metric tons (45 long tons; 51 short tons) to TLI.[64][65][66]

Upper stages

The Interim Cryogenic Propulsion Stage (ICPS) is planned to fly on

translunar injection burn to send Orion towards the Moon.[70] The ICPS for Artemis 1 was delivered by ULA to NASA about July 2017[71] and was housed at Kennedy Space Centre as of November 2018.[72] As of February 2020, ICPS (not EUS) is planned for Artemis 1, 2, and 3.[73] ICPS will be human-rated for the crewed Artemis 2 flight.[73]

The Exploration Upper Stage (EUS) is planned to fly on Artemis 4. Similar to the S-IVB, the EUS will complete the SLS ascent phase and then re-ignite to send its payload to destinations beyond LEO.[74] It is expected to be used by Block 1B and Block 2, share the Core Stage diameter of 8.4 meters, and be powered by four RL10C-3 engines.[75] It will eventually be upgraded to use four RL10C-X engines instead.[76]

Development

Diagram of four versions of the Space Launch System rocket
Planned evolution of the Space Launch System, 2018

Funding

During the joint Senate-NASA presentation in September 2011, it was stated that the SLS program had a projected development cost of US$18 billion through 2017, with US$10 billion for the SLS rocket, US$6 billion for the

Orion spacecraft, and US$2 billion for upgrades to the launch pad and other facilities at Kennedy Space Center.[77][78] These costs and schedules were considered optimistic in an independent 2011 cost assessment report by Booz Allen Hamilton for NASA.[79] An internal 2011 NASA document estimated the cost of the program through 2025 to total at least $41 billion for four 95 t (93 long tons; 105 short tons) launches (1 uncrewed, 3 crewed),[80][81] with the 130 t (130 long tons; 140 short tons) version ready no earlier than 2030.[82] The Human Exploration Framework Team (HEFT) estimated unit costs for Block 0 at US$1.6 billion and Block 1 at US$1.86 billion in 2010.[83] However, since these estimates were made the Block 0 SLS vehicle was dropped in late 2011, and the design was not completed.[43]

In September 2012, an SLS deputy project manager stated that US$500 million per launch is a reasonable target cost[

Orion service module.[87] In August 2014, as the SLS program passed its Key Decision Point C review and entered full development, costs from February 2014 until its planned launch in September 2018 were estimated at US$7.021 billion.[88] Ground systems modifications and construction would require an additional US$1.8 billion over the same time.[89]

In October 2018, NASA's inspector general reported that the Boeing Core Stage contract had made up 40% of the US$11.9 billion spent on the SLS as of August 2018. By 2021, Core Stages were expected to have cost US$8.9 billion, twice the initially planned amount.[90] In December 2018, NASA estimated that yearly budgets for the SLS will range from US$2.1 to US$2.3 billion between 2019 and 2023.[91]

In March 2019, the

Vulcan.[93] However, the request for a budget increase of US$1.6 billion towards SLS, Orion, and crewed landers along with the launch manifest seem to indicate support of the development of Block 1B, debuting Artemis 3. Block 1B will be used mainly for co-manifested crew transfers and logistical needs rather than constructing the Gateway. An uncrewed Block 1B is planned to launch the Lunar Surface Asset in 2028, the first lunar outpost of the Artemis program. Block 2 development will most likely start in the late 2020s after NASA is regularly visiting the lunar surface and shifts focus towards Mars.[94]

On 1 May 2020, NASA awarded a contract extension to Aerojet Rocketdyne to manufacture 18 additional RS-25 engines with associated services for US$1.79 billion, bringing the total RS-25 contract value to almost US$3.5 billion.[95]

Budget

For fiscal years 2011 through 2020, the SLS program had expended funding totaling US$18.648 billion in nominal dollars. This is equivalent to US$20.314 billion in 2020 dollars using the NASA New Start Inflation Indices.[96] For the fiscal year 2021, US$2.257 [inconsistent] billion.[1]

Fiscal year Funding (millions) Status
Nominal In US$2020[96]
2011 US$1,536.1 US$1,819.9 Actual[11]
(Formal SLS Program reporting excludes the Fiscal 2011 budget.)[97]
2012 US$1,497.5 US$1,755.5 Actual[10]
2013 US$1,414.9 US$1,634.1 Actual[9]
2014 US$1,600.0 US$1,812.3 Actual[8]
2015 US$1,678.6 US$1,863.8 Actual[7]
2016 US$1,971.9 US$2,159.6 Actual[6]
2017 US$2,127.1 US$2,286.8 Actual[5]
2018 US$2,150.0 US$2,256.6 Actual[4]
2019 US$2,144.0 US$2,199.9 Actual[3]
2020 US$2,525.8 US$2,525.8 Enacted[2]
2021 US$2,585.9 US$2,585.9 Enacted
2011–2020 Total: US$18,648 Total: US$20,314

On top of this, the costs to assemble, integrate, prepare and launch the SLS and its payloads are funded separately under Exploration Ground Systems,[98] currently about US$600 million[99] per year. Payloads that launch on SLS, such as the Orion crew capsule, are similarly accounted separately from SLS. Predecessor programs contributed development to SLS, such as the Ares V Cargo Launch Vehicle (funded from 2008 to 2010[clarification needed])[100] and Ares I Crew Launch Vehicle (funded from 2006 to 2010, a total of US$4.8 billion in development that included the 5-segment Solid Rocket Boosters that will be used on the SLS[100][101]).

Programs that are included under the above SLS cost table include the interim Upper Stage for the SLS, the Interim Cryogenic Propulsion Stage (ICPS), which includes a US$412 million contract.[102] Also included is the future Upper Stage for the SLS, the Exploration Upper Stage (EUS) (funded at US$85 million in 2016,[103] US$300 million in 2017,[104] US$300 million in 2018,[105] and US$150 million in 2019[106])

Per launch costs

Estimates of the per launch costs for the SLS have varied widely, partly due to uncertainty over how much the program will expend during development and testing before the operational launches begin, and partly due to various agencies using differing cost measures (for example, a marginal cost per one additional launch, which ignores the development and annual recurring fixed costs vs. total cost per launch, including recurring costs but excluding development); but also based on differing purposes for which the cost estimates were developed.

There are no official NASA estimates for how much the SLS will cost per launch, nor for the SLS program annual recurring costs once operational. Cost per launch is not a straightforward figure to estimate as it depends heavily on how many launches occur per year.[13] For example, similarly, the Space Shuttle was estimated (in 2012 dollars) to cost US$576 million per launch had it been able to achieve 7 launches per year, while the marginal cost of adding a single additional launch in a given year was estimated to be less than half of that, at just US$252 million of marginal cost. However, at the rate that it flew, the cost, in the end, was US$1.64 billion per Space Shuttle launch, including development.[107]: III−490 

NASA associate administrator William H. Gerstenmaier said in 2017 that there would be no official per flight cost estimates of any variety provided by NASA for the SLS.[108] Other bodies, such as the Government Accountability Office (GAO), the NASA Office of Inspector General, the Senate Appropriations Committee, and the White House Office of Management and Budget have put out cost per launch figures, however. Several internal NASA programs and project concept study reports have released proposed budgets that include future SLS launches. For example, a concept study report for a space telescope was advised [clarification needed] by NASA HQ in 2019 to budget US$500 million for an SLS launch in 2035 [clarification needed].[109] Another study in 2019 also proposing a space telescope assumed a budget for their launch of US$650 million in current-day dollars, or US$925 million for when the launch would occur, also in the "mid-2030s".[110]

Europa Clipper is a NASA scientific mission that was initially required by Congress to launch on the SLS. Oversight bodies both internal and external to NASA disagreed with this requirement. First, NASA's Inspector General office published a report in May 2019[111][112] that stated Europa Clipper would need to give up US$876 million for the "marginal cost" of its SLS launch. Then, an addendum to the letter published in August 2019 increased the estimate and stated that switching to a commercial rocket would save over US$1 billion. (Although these savings may have included a portion of costs related to the delay in launch schedule; a commercial alternative could launch sooner than SLS) A JCL (Joint Cost and Schedule Confidence Level) analysis cited in that letter put the cost savings at US$700 million, with the SLS at US$1.05 billion per launch and the commercial alternative at US$350 million.[113][114] In July 2021, NASA announced that instead of SLS, a SpaceX Falcon Heavy would be used to launch Europa Clipper.[115] The shaking caused by the SLS's solid-fuel boosters would have required expensive changes to the Europa Clipper itself, and the total cost savings was estimated at US$2 billion.[116]

Finally, a letter from the White House Office of Management and Budget (OMB) to the Senate Appropriations Committee in October 2019 revealed that SLS's total cost to the taxpayer was estimated at "over US$2 billion" per launch after development is complete (program development has cost US$20 billion in 2020 dollars).[14] The letter suggested Congress remove this requirement, agreeing the NASA Inspector General, adding that using a commercial launch vehicle for Europa Clipper instead of the SLS would save US$1.5 billion overall. NASA did not deny this US$2 billion cost of launch and an agency spokesperson stated it "is working to bring down the cost of a single SLS launch in a given year as the agency continues negotiations with Boeing on the long-term production contract and efforts to finalize contracts and costs for other elements of the rocket".[13] This OMB figure is dependent on the rate of construction, so building more SLS rockets faster could decrease the per-unit cost.[13] For example, Exploration Ground Systems – whose only role is to support, assemble, integrate, and launch SLS – has separately budgeted fixed costs of US$600 million per year on facilities, spread across however many rockets launch that year.[99] Then NASA Administrator Jim Bridenstine shared informally that he disagrees with the US$2 billion figure since the marginal cost of an SLS launch should decrease after the first few, and is expected to end up around US$800 million to US$900 million, although contract negotiations were only just beginning for those later cores.[117]

Early Plans

Exploration Ground Systems and Jacobs prepare to lift and place the Core Stage of the Space Launch System rocket

The SLS was created by an act of Congress, in which NASA was directed to create a system for launching payloads and crew into space that would replace the capabilities lost with the retirement of the

Orion spacecraft as payload.[118][119][120][121]

The SLS has considered several future development routes of potential launch configurations, with the planned evolution of the blocks of the rocket having been modified many times.[122] Many options, all of which just needed to meet the congressionally mandated payload minimums,[122] were considered, including a Block 0 variant with three main engines,[43] a variant with five main engines,[122] a Block 1A variant with upgraded boosters instead of the improved second stage,[43] and a Block 2 with five main engines plus the Earth Departure Stage, with up to three J-2X engines.[46]

In the initial announcement of the design of the SLS, NASA also announced an "Advanced Booster Competition", to select which boosters would be used on Block 2 of the SLS.[118][123][52][124] Several companies proposed boosters for this competition, all of which were indicated as viable[125]: Aerojet and Teledyne Brown proposed three booster engines each with dual combustion chambers,[126] Alliant Techsystems proposed a modified SRB with lighter casing, more energetic propellant, and four segments instead of five,[127] and Pratt & Whitney Rocketdyne and Dynetics proposed a liquid-fueled booster named Pyrios.[128] However, this competition was planned for a development plan in which Block 1A would be followed by Block 2A, with upgraded boosters. NASA canceled Block 1A and the planned competition in April 2014, in favor of simply remaining with the Ares I's five-segment SRBs (themselves modified from the Space Shuttle's SRBs) until at least the late 2020s.[122][129] The overly powerful advanced booster would have resulted in unsuitably high acceleration, and would need modifications to Launch Pad 39B, its flame trench, and Mobile Launcher.[130][122]

Diagram comparing size of largest launch vehicles
Comparison of super heavy-lift launch vehicles

On 31 July 2013, the SLS passed the Preliminary Design Review (PDR). The review included not only the rocket and boosters but also ground support and logistical arrangements.[131] On 7 August 2014, the SLS Block 1 passed a milestone known as Key Decision Point C and entered full-scale development, with an estimated launch date of November 2018.[88][132] In 2013, NASA and Boeing analyzed the performance of several EUS engine options. The analysis was based on a second-stage usable propellant load of 105 metric tons, and compared stages with four RL10 engines, two MARC-60 engines, or one J-2X engine.[133] In 2014, NASA also considered using the European Vinci instead of the RL10. The Vinci offers the same specific impulse but with 64% greater thrust, which would allow for the same performance at a lower cost.[134][135]

Blue Origin submitted a proposal to replace the Exploration Upper Stage with a cheaper alternative to be designed and fabricated by the company, but it was rejected by NASA in November 2019 on multiple grounds; these included lower performance compared to the existing EUS design, incompatibility of the proposal with the height of the door of the Vehicle Assembly Building being only 390 feet, and unacceptable acceleration of Orion components such as its solar panels.[136][137]: 8 

From 2009 to 2011, three full-duration static fire tests of five-segment SRBs were conducted under the

Northrop Grumman Innovation Systems has completed full-duration static fire tests of the five-segment SRBs. Qualification Motor 1 (QM-1) was tested on 10 March 2015.[141]
Qualification Motor 2 (QM-2) was successfully tested on 28 June 2016.

SLS Construction History

A rocket engine on the road toward a large building
Artemis I Core Stage going into the Vehicle Assembly Building at KSC

As of 2020, three SLS versions are planned: Block 1, Block 1B, and Block 2. Each will use the same Core Stage with four main engines, but Block 1B will feature the Exploration Upper Stage (EUS), and Block 2 will combine the EUS with upgraded boosters.[142][50][143] In mid-November 2014, construction of the first Core Stage hardware began using a new welding system in the South Vertical Assembly Building at NASA's Michoud Assembly Facility.[144] Between 2015 and 2017, NASA test fired RS-25 engines in preparation for use on SLS.[57] As of late 2015, the SLS program was stated to have a 70% confidence level for the first crewed Orion flight by 2023,[145][146][147] and as of 2020, NASA is continuing to project a 2023 launch.[148]

The Core Stage for the first SLS, built at Michoud Assembly Facility, had all four engines attached in November 2019,[149], and it was declared finished by NASA in December 2019.[150]

The first Core Stage left Michoud Assembly Facility for comprehensive testing at Stennis Space Center in January 2020.[151] The static firing test program at Stennis Space Center, known as the Green Run, operated all the Core Stage systems simultaneously for the first time.[152][153] Test 7 (of 8), the wet dress rehearsal, was carried out in December 2020 and the fire (test 8) took place on 16 January 2021, but shut down earlier than expected,[154] about 67 seconds in total rather than the desired eight minutes. The reason for the early shutdown was later reported to be because of conservative test commit criteria on the thrust vector control system, specific only for ground testing and not for flight. If this scenario occurred during a flight, the rocket would have continued to fly normally. There was no sign of damage to the Core Stage or the engines, contrary to initial concerns.[155] The second fire test was completed on 18 March 2021, with all 4 engines igniting, throttling down as expected to simulate in-flight conditions, and gimballing profiles. The Core Stage was shipped to Kennedy Space Center to be mated with the rest of the rocket for Artemis 1. It left Stennis on April 24 and arrived at Kennedy on April 27.[156] It was refurbished there in preparation for stacking.[157] On 12 June 2021, NASA announced the assembly of the first SLS rocket was completed at the Kennedy Space Center. The assembled SLS is planned to be used for the unmanned Artemis 1 mission in 2022.[21]

Originally planned for late 2016, the intended uncrewed first flight of SLS has slipped more than eight times and more than five years.[note 2] NASA plans to announce a specific projected first launch date after Orion is stacked on Artemis 1.[168] NASA limits the amount of time the solid rocket boosters can remain stacked to "about a year" from the time two segments are joined.[169] The first and second segments of the Artemis 1 boosters were joined on 7 January 2021.[170] NASA can choose to extend the time limit based on an engineering review.[171] On 29 September 2021, Northrup Grumman indicated that the limit can be extended to eighteen months for Artemis 1, based on an analysis of the data collected when the boosters were being stacked.[21]

Planned launches

Flight No. Date, time (UTC) Configuration Payload Orbit Outcome
1 16 November 2022, 06:47[172] Block 1 TLI Success
Uncrewed maiden flight of the SLS, first operational flight of the Orion capsule. Carrying
cubesats for ten missions in the CubeSat Launch Initiative (CSLI), and three missions in the Cube Quest Challenge.[173][174] The payloads were sent on a trans-lunar injection trajectory.[175][176]
2 September 2025[177] Block 1 Crew
TLI Planned
Crewed lunar flyby.
3 September 2026[177] Block 1 Crew
Selenocentric Planned
Crewed lunar rendezvous and landing.[178]
4 September 2028[179] Block 1B Crew[180]
  • I-HAB
Selenocentric (NRHO) Planned
Crewed mission to the
International Habitation Module (I-HAB) to the Gateway, following by a crewed lunar landing.[181]
5 March 2030[182] Block 1B Crew[180]
  • ESPRIT
Selenocentric (NRHO) Planned
Crewed mission to the
ESPRIT module to the Gateway.[183]

Criticism

The SLS has been criticized based on program cost, lack of commercial involvement, and the non-competitive nature of a vehicle legislated to use Space Shuttle components. In 2009, the

Commercial Crew Development program accelerated instead.[185][188][189][190][191]

A NASA study that was not publicly released

Georgia Institute of Technology showed this option to be possibly cheaper.[194][195] In 2012, the United Launch Alliance also suggested using existing rockets with on-orbit assembly and propellant depots as needed. The lack of competition in the SLS design was highlighted.[196][197][198][199][200] In the summer of 2019, a former ULA employee claimed that Boeing, NASA's prime contractor for SLS, viewed orbital refueling technology as a threat to the SLS and blocked further investment in it.[201] In 2011, Robert Zubrin, founder of Mars Society and Mars Direct, suggested that a heavy lift vehicle could be developed for US$5 billion on fixed-price requests for proposal.[202]

In 2010, SpaceX's CEO Elon Musk claimed that his company could build a launch vehicle in the 140–150 t (140–150 long tons; 150–170 short tons) payload range for US$2.5 billion, or US$300 million (in 2010 dollars) per launch, not including a potential upper-stage upgrade.[203][204] In the early 2010s, SpaceX went on to start the development of SpaceX Starship, a planned fully reusable super-heavy launch system. Reusability is claimed to allow the lowest-cost super-heavy launcher ever made.[205][unreliable source] If the price per launch and payload capabilities for the Starship is anywhere near Musk's claimed capabilities, the rocket will be substantially cheaper than the SLS.[206]

In 2011, Rep. Tom McClintock and other groups called on the Government Accountability Office (GAO) to investigate possible violations of the Competition in Contracting Act (CICA), arguing that Congressional mandates forcing NASA to use Space Shuttle components for the SLS are de facto non-competitive, single-source requirements assuring contracts to existing Shuttle suppliers.[186][207][208] The Competitive Space Task Force, in September 2011, said that the new government launcher directly violates NASA's charter, the Space Act, and the 1998 Commercial Space Act requirements for NASA to pursue the "fullest possible engagement of commercial providers" and to "seek and encourage, to the maximum extent possible, the fullest commercial use of space".[185][208] Opponents of the heavy launch vehicle have critically used the name "Senate launch system",[67][208][199] a name that was still being used by opponents to criticize the program in 2021, as "the NASA Inspector General said the total cost of the rocket would reach $27 billion through 2025."[209]

In 2013,

Commercial Crew Development and SLS budgets, also referring to earlier critiques by Garver.[212] In 2019, the Government Accountability Office found that NASA had awarded Boeing over US$200 million for service with ratings of good to excellent despite cost overruns and delays. As of 2019, the maiden launch of the SLS was expected in 2021.[213][214] NASA continued to expect that the first orbital launch would be in 2021 as late as May 2021.[165]

A diagram showing two bars on both sides
Visual from the March 2020 Inspector General report, showing how NASA used accounting to "mask"[215]: iv  a cost increase by moving the boosters (which cost US$889M) from the SLS to another cost center, without updating the SLS budget to match.[215]: 22 

NASA moved out US$889 million of costs relating to SLS boosters, but did not update the SLS budget to match, a March 2020 Inspector General report found. This kept the budget overrun to 15% by FY 2019.[215]: 22  At 30%, NASA would have to notify Congress and stop funding unless Congress reapproves and provides additional funding.[215]: 21–23  The Inspector General report found that were it not for this "masking" of cost, the overrun would be 33% by FY 2019.[215]: iv, 23  The GAO separately stated "NASA's current approach for reporting cost growth misrepresents the cost performance of the program".[216]: 19–20 

On 1 May 2020, NASA awarded a US$1.79 billion contract extension for the manufacture of 18 additional RS-25 engines.

Charlie Bolden, who oversaw the initial design and development of the SLS, also shared his criticism of the program in an interview with Politico in September 2020. Bolden said that the "SLS will go away because at some point commercial entities are going to catch up". Bolden further stated, "commercial entities are really going to build a heavy-lift launch vehicle sort of like SLS that they will be able to fly for a much cheaper price than NASA can do SLS".[218]

Gallery

  • RS-25D engine testing at Stennis Space Center.
    RS-25D engine testing at
    Stennis Space Center
    .
  • SLS Mobile Launcher
    SLS Mobile Launcher
  • The Core Stage for the Space Launch System rocket for Artemis I
    The Core Stage for the Space Launch System rocket for Artemis I
  • The Space Launch System Core Stage rolling out of the Michoud Facility for shipping to Stennis.
    The Space Launch System Core Stage rolling out of the Michoud Facility for shipping to Stennis.
  • SRB segment
    SRB segment
  • ICPS on the move
    ICPS on the move
  • Engine shot of the 4 RS-25 engines during the first Green Run hotfire test of the SLS core stage on January 16, 2021
    Engine shot of the 4 RS-25 engines during the first Green Run hotfire test of the SLS core stage on January 16, 2021
  • The first Green Run hotfire test of the SLS core stage on January 16, 2021
    The first Green Run hotfire test of the SLS core stage on January 16, 2021
  • Stacking of the SLS solid rocket boosters for Artemis 1 in the VAB
    Stacking of the SLS solid rocket boosters for Artemis 1 in the VAB
  • The Artemis 1 SLS core stage being loaded onto the Pegasus barge
    The Artemis 1 SLS core stage being loaded onto the Pegasus barge
  • The Green Run testing was the first top-to-bottom integrated testing of the stage's systems prior to its maiden flight
    The Green Run testing was the first top-to-bottom integrated testing of the stage's systems prior to its maiden flight
  • Artemis I core stage going into the Vehicle Assembly Building
    Artemis I core stage going into the Vehicle Assembly Building
  • Artemis I in the Vehicle Assembly Building
  • Block 1 configuration
    Block 1 configuration
  • Block 1B configuration
    Block 1B configuration
  • Block 2 configuration
    Block 2 configuration

See also

References

Notes

  1. ^ This is for the Block 1 launch vehicle alone and does not include the Orion capsule or service module costs.[13]
  2. ^ a b NASA has announced at least seven schedule slips: December 2016,[41][29][158] October 2017,[159] November 2018,[160] 2019,[161] June 2020,[162] April 2021,[163] November 2021,[164][165] December 2021,[42] and then to some time between January 2022 and March 2022.[166][167][21]

Citations

  1. ^ a b c "Updated FY 2021 Spending Plan" (PDF). NASA. Archived (PDF) from the original on 23 September 2021. Retrieved 3 October 2021. {{cite web}}: |archive-date= / |archive-url= timestamp mismatch; 25 September 2021 suggested (help) Public Domain This article incorporates text from this source, which is in the public domain.
  2. ^ a b "Updated FY 2020 Spending Plan" (PDF). NASA. Archived (PDF) from the original on 1 November 2020. Retrieved 3 October 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  3. ^ a b "FY 2019 Spend Plan" (PDF). NASA. Archived (PDF) from the original on 11 November 2020. Retrieved 3 October 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  4. ^ a b "FY 2018 Operating Plan" (PDF). NASA. Archived (PDF) from the original on 12 July 2021. Retrieved 3 October 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  5. ^ a b "FY 2017 Operating Plan" (PDF). NASA. Archived (PDF) from the original on 4 October 2021. Retrieved 3 October 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  6. ^ a b "FY 2016 Operating Plan (Sept. 4 update)" (PDF). NASA. Archived (PDF) from the original on 4 October 2021. Retrieved 3 October 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  7. ^ a b "FY 2015 Operating Plan Update (Aug. 2015)" (PDF). NASA. Archived (PDF) from the original on 17 February 2017. Retrieved 3 October 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  8. ^ a b "FY 2014 Operating Plan" (PDF). NASA. Archived (PDF) from the original on 11 June 2017. Retrieved 3 October 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  9. ^ a b "FY 2013 Operating Plan" (PDF). NASA. Archived (PDF) from the original on 19 January 2021. Retrieved 3 October 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  10. ^ a b "FY 2014 Complete Budget Estimates" (PDF). NASA. Archived (PDF) from the original on 6 September 2021. Retrieved 3 October 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  11. ^ a b "FY 2013 Complete Budget Estimates" (PDF). NASA. Archived (PDF) from the original on 6 September 2021. Retrieved 3 October 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  12. ^ [1][2][3][4][5][6][7][8][9][10][11]
  13. ^ a b c d Berger, Eric (8 November 2019). "NASA does not deny the "over US$2 billion" cost of a single SLS launch". Ars Technica. Archived from the original on 11 November 2019. Retrieved 13 November 2019. "The White House number appears to include both the "marginal" cost of building a single SLS rocket as well as the "fixed" costs of maintaining a standing army of thousands of employees and hundreds of suppliers across the country. Building a second SLS rocket each year would make the per-unit cost "significantly less". {{cite journal}}: Cite journal requires |journal= (help)
  14. ^ a b Vought, Russell T. "Letter to the Chair and Vice Chair of the Senate Appropriations Committee with respect to 10 of the FY 2020 annual appropriations bills" (PDF). whitehouse.gov. p. 7. Archived (PDF) from the original on 13 November 2019. Retrieved 13 November 2019. estimated cost of over US$2 billion per launch for the SLS once development is complete Public Domain This article incorporates text from this source, which is in the public domain.
  15. ^ "White House warns Congress about Artemis funding". SpaceNews. 7 November 2019. Archived from the original on 30 September 2021. Retrieved 13 November 2019.
  16. ^ a b c d e Harbaugh, Jennifer (9 July 2018). "The Great Escape: SLS Provides Power for Missions to the Moon". NASA. Archived from the original on 11 December 2019. Retrieved 4 September 2018. Public Domain This article incorporates text from this source, which is in the public domain.
  17. ^ "NASA's Space Launch System: Exploration, Science, Security" (PDF). The Boeing Company. Archived (PDF) from the original on 9 August 2021. Retrieved 4 October 2021.
  18. ^ a b Creech, Stephen (April 2014). "NASA's Space Launch System: A Capability for Deep Space Exploration" (PDF). NASA. p. 2. Archived (PDF) from the original on 7 March 2016. Retrieved 4 September 2018. Public Domain This article incorporates text from this source, which is in the public domain.
  19. ^ Mohon, Lee (16 March 2015). "Space Launch System (SLS) Overview". NASA. Archived from the original on 25 July 2019. Retrieved 6 July 2019. Public Domain This article incorporates text from this source, which is in the public domain.
  20. ^ "SLS Lift Capabilities and Configurations" (PDF). NASA. 29 April 2020. Archived (PDF) from the original on 21 September 2020. Retrieved 20 January 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  21. ^
    NASASpaceFlight. Archived
    from the original on 29 September 2021. Retrieved 29 September 2021.
  22. ^ a b Harbaugh, Jennifer (17 July 2020). "Stacking the Space Launch System Solid Rocket Boosters". NASA. Archived from the original on 28 August 2020. Retrieved 12 August 2020. Public Domain This article incorporates text from this source, which is in the public domain.
  23. ^ a b Redden, Jeremy J. (27 July 2015). "SLS Booster Development". NASA Technical Reports Server. Archived from the original on 23 August 2021. Retrieved 1 October 2020. Public Domain This article incorporates text from this source, which is in the public domain.
  24. ^ a b "SLS Core Stage Fact Sheet" (PDF). NASA. Archived (PDF) from the original on 20 February 2021. Retrieved 4 October 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  25. ^ a b "RS-25 Engine". Archived from the original on 12 August 2021. Retrieved 12 June 2021.|url-status=live}} Public Domain This article incorporates text from this source, which is in the public domain.
  26. ^ "What is ICPS?". United Launch Alliance. Retrieved 4 October 2021.{{cite web}}: CS1 maint: url-status (link) Public Domain This article incorporates text from this source, which is in the public domain.
  27. ^ a b c d "Space Launch System". Archived from the original on 5 October 2021. Retrieved 4 October 2021.
  28. ^ "RL10 Engine". Archived from the original on 9 July 2021. Retrieved 5 July 2021.|url-status=live}} Public Domain This article incorporates text from this source, which is in the public domain.
  29. ^ a b "S.3729 - National Aeronautics and Space Administration Authorization Act of 2010". United States Congress. 11 October 2010. Archived from the original on 28 April 2021. Retrieved 14 September 2020. Public Domain This article incorporates text from this source, which is in the public domain.
  30. ^ a b Stephen Clark (31 March 2011). "NASA to set exploration architecture this summer". Spaceflight Now. Archived from the original on 15 May 2011. Retrieved 26 May 2011.
  31. ^ Dwayne Day (25 November 2013). "Burning thunder". The Space Review. Archived from the original on 19 August 2014. Retrieved 17 August 2014.
  32. ^ Siceloff, Steven (12 April 2015). "SLS Carries Deep Space Potential". nasa.gov. NASA. Archived from the original on 24 December 2018. Retrieved 2 January 2018. Public Domain This article incorporates text from this source, which is in the public domain.
  33. ^ "World's Most Powerful Deep Space Rocket Set To Launch In 2018". iflscience.com. 29 August 2014. Archived from the original on 7 July 2019. Retrieved 19 September 2021. {{cite web}}: |archive-date= / |archive-url= timestamp mismatch; 1 September 2014 suggested (help)
  34. ^ Chiles, James R. (October 2014). "Bigger Than Saturn, Bound for Deep Space". airspacemag.com. Archived from the original on 12 December 2019. Retrieved 2 January 2018.
  35. ^ "Finally, some details about how NASA actually plans to get to Mars". arstechnica.com. 28 March 2017. Archived from the original on 13 July 2019. Retrieved 2 January 2018.
  36. ^ a b Gebhardt, Chris (6 April 2017). "NASA finally sets goals, missions for SLS – eyes multi-step plan to Mars". NASASpaceFlight.com. Archived from the original on 21 August 2017. Retrieved 21 August 2017.
  37. ^ Gebhardt, Chris (15 August 2019). "Eastern Range updates "Drive to 48" launches per year status". NASASpaceFlight.com. Archived from the original on 30 November 2019. Retrieved 6 January 2020. NASA, on the other hand, will have to add this capability to their SLS rocket, and Mr. Rosati said NASA is tracking that debut for the Artemis 3 mission in 2023.
  38. ^ "Space Launch System". aerospaceguide.net. Archived from the original on 26 July 2019. Retrieved 9 April 2014.
  39. ^ Harbaugh, Jennifer (12 May 2017). "NASA Continues Testing, Manufacturing World's Most Powerful Rocket". nasa.gov. NASA. Archived from the original on 24 May 2017. Retrieved 12 August 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  40. ^ Weitering, Hanneke (12 February 2020). "NASA has a plan for yearly Artemis moon flights through 2030. The first one could fly in 2021". Space.com. Archived from the original on 28 February 2020. Retrieved 20 February 2020.
  41. ^ a b c d "Public Law 111–267 111th Congress, 42 USC 18322. SEC. 302 (c) (2) 42 USC 18323. SEC. 303 (a) (2)" (PDF). 11 October 2010. pp. 11–12. Archived (PDF) from the original on 12 November 2020. Retrieved 14 September 2020. 42 USC 18322. SEC. 302 SPACE LAUNCH SYSTEM AS FOLLOW-ON LAUNCH VEHICLE TO THE SPACE SHUTTLE ... (c) MINIMUM CAPABILITY REQUIREMENTS (1) IN GENERAL — The Space Launch System developed pursuant to subsection (b) shall be designed to have, at a minimum, the following: (A) The initial capability of the core elements, without an upper stage, of lifting payloads weighing between 70 tons and 100 tons into low-Earth orbit in preparation for transit for missions beyond low Earth orbit ... (2) FLEXIBILITY ... (Deadline) Developmental work and testing of the core elements and the upper stage should proceed in parallel subject to appro-priations. Priority should be placed on the core elements with the goal for operational capability for the core elements not later than December 31, 2016 ... 42 USC 18323. SEC. 303 MULTI-PURPOSE CREW VEHICLE (a) INITIATION OF DEVELOPMENT (1) IN GENERAL — The Administrator shall continue the development of a multi-purpose crew vehicle to be available as soon as practicable, and no later than for use with the Space Launch System ... (2) GOAL FOR OPERATIONAL CAPABILITY. It shall be the goal to achieve full operational capability for the transportation vehicle developed pursuant to this subsection by not later than December 31, 2016. For purposes of meeting such goal, the Administrator may undertake a test of the transportation vehicle at the ISS before that date.
  42. ^ a b Clark, Stephen (31 August 2021). "NASA's hopes waning for SLS test flight this year". Spaceflight Now. Archived from the original on 1 September 2021. Retrieved 1 September 2021.
  43. ^ a b c d e Chris Bergin (4 October 2011). "SLS trades lean towards opening with four RS-25s on the core stage". NASASpaceFlight.com. Archived from the original on 16 July 2019. Retrieved 16 September 2013.
  44. ^ Chris Bergin (25 April 2011). "SLS planning focuses on dual phase approach opening with SD HLV". NASASpaceFlight.com. Archived from the original on 29 June 2019. Retrieved 26 January 2012.
  45. ^ Bergin, Chris (16 June 2011). "Managers SLS announcement after SD HLV victory". NASASpaceFlight.com. Archived from the original on 29 January 2012. Retrieved 26 January 2012.
  46. ^ a b Bergin, Chris (23 February 2012). "Acronyms to Ascent – SLS managers create development milestone roadmap". NASASpaceFlight.com. Archived from the original on 30 April 2012. Retrieved 9 April 2012.
  47. ^ "SLS to be robust in the face of scrubs, launch delays and pad stays". NASASpaceFlight.com. 4 April 2012. Archived from the original on 31 March 2019. Retrieved 9 April 2012.
  48. ^ Sloss, Philip (5 February 2021). "NASA, Boeing adjusting SLS Core Stage parameter limits for second Green Run firing". Nasaspaceflight. Archived from the original on 16 February 2021. Retrieved 29 May 2021.
  49. ^ a b c "Space Launch System Lift Capabilities and Configurations" (PDF). Archived (PDF) from the original on 7 August 2020. Retrieved 7 March 2020. Public Domain This article incorporates text from this source, which is in the public domain.
  50. ^ a b "Space Launch System" (PDF). NASA Facts. NASA. 11 October 2017. FS-2017-09-92-MSFC. Archived (PDF) from the original on 24 December 2018. Retrieved 4 September 2018. Public Domain This article incorporates text from this source, which is in the public domain.
  51. ^ Harbaugh, Jennifer (9 December 2019). "NASA, Public Marks Assembly of SLS Stage with Artemis Day". nasa.gov. NASA. Archived from the original on 6 February 2020. Retrieved 10 December 2019. NASA and the Michoud team will shortly send the first fully assembled, 212-foot-tall core stage...27.6-feet-in-diameter tanks and barrels. Public Domain This article incorporates text from this source, which is in the public domain.
  52. ^ a b "space launch system" (PDF). nasa.gov. 2012. Archived from the original (PDF) on 13 August 2012. Public Domain This article incorporates text from this source, which is in the public domain.
  53. ^ Chris Bergin (14 September 2011). "SLS finally announced by NASA – Forward path taking shape". NASASpaceFlight.com. Archived from the original on 2 September 2019. Retrieved 26 January 2012.
  54. ^ Sloss, Philip (2 January 2015). "NASA ready to power up the RS-25 engines for SLS". NASASpaceFlight.com. Archived from the original on 15 May 2019. Retrieved 10 March 2015.
  55. ^ Boen, Brooke (2 March 2015). "RS-25: The Clark Kent of Engines for the Space Launch System". NASA. Archived from the original on 24 December 2020. Retrieved 29 March 2021.
  56. ^ Harbaugh, Jennifer (29 January 2020). "Space Launch System RS-25 Core Stage Engines". NASA. Archived from the original on 18 March 2021. Retrieved 29 August 2021.
  57. ^ a b Campbell, Lloyd (25 March 2017). "NASA conducts 13th test of Space Launch System RS-25 engine". SpaceflightInsider.com. Archived from the original on 26 April 2019. Retrieved 29 April 2017.
  58. ^ "NASA Awards Aerojet Rocketdyne $1.79 Billion Contract Modification to Build Additional RS-25 Rocket Engines to Support Artemis Program | Aerojet Rocketdyne". www.rocket.com. Archived from the original on 23 March 2021. Retrieved 29 March 2021.
  59. ^ "NASA's Space Launch System Core Stage Passes Major Milestone, Ready to Start Construction". Space Travel. 27 December 2012. Archived from the original on 21 December 2019. Retrieved 27 December 2012.
  60. ^ "FOUR TO FIVE: ENGINEER DETAILS CHANGES MADE TO SLS BOOSTER Jan 2016". 10 January 2016. Archived from the original on 25 July 2020. Retrieved 9 June 2020.
  61. ^ Priskos, Alex (7 May 2012). "Five-segment Solid Rocket Motor Development Status" (PDF). ntrs.nasa.gov. NASA. Archived (PDF) from the original on 24 December 2018. Retrieved 11 March 2015. Public Domain This article incorporates text from this source, which is in the public domain.
  62. ^ "Space Launch System: How to launch NASA's new monster rocket". NASASpaceFlight.com. 20 February 2012. Archived from the original on 16 November 2019. Retrieved 9 April 2012.
  63. ^ Bergin, Chris (8 May 2018). "SLS requires Advanced Boosters by flight nine due to lack of Shuttle heritage components". NASASpaceFlight.com. Archived from the original on 1 June 2019. Retrieved 15 November 2019.
  64. ^ Sloss, Philip (12 July 2021). "NASA, Northrop Grumman designing new BOLE SRB for SLS Block 2 vehicle". NASASpaceFlight. Archived from the original on 13 August 2021. Retrieved 13 August 2021.
  65. ^ Tobias, Mark E.; Griffin, David R.; McMillin, Joshua E.; Haws, Terry D.; Fuller, Micheal E. (2 March 2019). "Booster Obsolescence and Life Extension (BOLE) for Space Launch System (SLS)" (PDF). NASA Technical Reports Server. NASA. Archived (PDF) from the original on 15 November 2019. Retrieved 15 November 2019. Public Domain This article incorporates text from this source, which is in the public domain.
  66. ^ Tobias, Mark E.; Griffin, David R.; McMillin, Joshua E.; Haws, Terry D.; Fuller, Micheal E. (27 April 2020). "Booster Obsolescence and Life Extension (BOLE) for Space Launch System (SLS)" (PDF). NASA Technical Reports Server. NASA. Archived (PDF) from the original on 27 January 2021. Retrieved 12 August 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  67. ^ a b Rosenberg, Zach. "Delta second stage chosen as SLS interim" Archived 27 July 2012 at the Wayback Machine. Flight International, May 8, 2012
  68. ^ Henry, Kim (30 October 2014). "Getting to Know You, Rocket Edition: Interim Cryogenic Propulsion Stage". nasa.gov. Archived from the original on 6 August 2020. Retrieved 25 July 2020. Public Domain This article incorporates text from this source, which is in the public domain.
  69. ^ Batcha, Amelia L.; Williams, Jacob; Dawn, Timothy F.; Gutkowski, Jeffrey P.; Widner, Maxon V.; Smallwood, Sarah L.; Killeen, Brian J.; Williams, Elizabeth C.; Harpold, Robert E. (27 July 2020). "Artemis I Trajectory Design and Optimization" (PDF). NASA Technical Reports Server. NASA. Archived (PDF) from the original on 9 September 2021. Retrieved 8 September 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  70. ^ "Space Launch System Data Sheet". SpaceLaunchReport.com. Archived from the original on 1 September 2016. Retrieved 25 July 2014.
  71. ^ "SLS Upper Stage set to take up residence in the former home of ISS modules July 2017". Archived from the original on 7 August 2020. Retrieved 15 February 2020.
  72. ^ Harbaugh, Jennifer (8 November 2018). "Meet the Interim Cryogenic Propulsion Stage for SLS". NASA. Archived from the original on 7 August 2020.
  73. ^ a b "Upper Stage RL10s arrive at Stennis for upcoming SLS launches Feb 2020". Archived from the original on 15 February 2020. Retrieved 15 February 2020.
  74. ^ "SLS prepares for PDR – Evolution eyes Dual-Use Upper Stage". NASASpaceFlight.com. Archived from the original on 14 September 2013. Retrieved 12 March 2015.
  75. ^ "NASA confirms EUS for SLS Block 1B design and EM-2 flight". NASASpaceFlight.com. Archived from the original on 16 July 2014. Retrieved 24 July 2014.
  76. ^ Sloss, Philip (4 March 2021). "NASA, Boeing looking to begin SLS Exploration Upper Stage manufacturing in 2021". Nasaspaceflight. Archived from the original on 24 June 2021. Retrieved 23 June 2021.
  77. ^ Marcia Smith (14 September 2011). "New NASA Crew Transportation System to Cost $18 Billion Through 2017". Space Policy Online. Archived from the original on 2 April 2015. Retrieved 15 September 2011.
  78. ^ Bill Nelson, Kay Bailey Hutchison, Charles F. Bolden (14 September 2011). Future of NASA Space Program. Washington, D.C.: Cspan.org.
  79. ^ Booz Allen Hamilton (19 August 2011). "Independent Cost Assessment of the Space Launch System, Multi-purpose Crew Vehicle and 21st Century Ground Systems Programs: Executive Summary of Final Report" (PDF). nasa.gov. Archived (PDF) from the original on 2 March 2012. Retrieved 3 March 2012. Public Domain This article incorporates text from this source, which is in the public domain.
  80. ^ Andy Paszior (7 September 2011). "White House Experiences Sticker Shock Over NASA's Plans". The Wall Street Journal. Archived from the original on 9 December 2017. Retrieved 22 February 2015.
  81. ^ "ESD Integration, Budget Availability Scenarios" (PDF). Space Policy Online. 19 August 2011. Archived (PDF) from the original on 9 December 2011. Retrieved 15 September 2011.
  82. ^ Marcia Smith (9 September 2011). "The NASA Numbers Behind That WSJ Article". Space Policy Online. Archived from the original on 4 January 2013. Retrieved 15 September 2011.
  83. ^ "HEFT Phase I Closeout" (PDF). nasawatch.com. September 2010. p. 69. Archived (PDF) from the original on 30 September 2021. Retrieved 25 March 2012.
  84. ^ "NASA's huge new rocket may cost US$500 million per launch". NBC News. 12 September 2012. Archived from the original on 12 August 2020. Retrieved 13 November 2019.
  85. ^ Lee Roop (29 July 2013). "NASA defends Space Launch System against charge it 'is draining the lifeblood' of space program". al.com. Archived from the original on 18 February 2015. Retrieved 18 February 2015.
  86. ^ John Strickland (15 July 2013). "Revisiting SLS/Orion launch costs". The Space Review. Archived from the original on 18 February 2015. Retrieved 18 February 2015.
  87. ^ NASA Content Administrator, ed. (12 April 2015) [January 16, 2013]. "NASA Signs Agreement for a European-Provided Orion Service Module". nasa.gov. Archived from the original on 18 January 2013. Public Domain This article incorporates text from this source, which is in the public domain.
  88. ^ a b Foust, Jeff (27 August 2014). "SLS Debut Likely To Slip to 2018". SpaceNews. Archived from the original on 30 September 2021. Retrieved 12 March 2015.
  89. ^ Davis, Jason. "NASA Budget Lists Timelines, Costs and Risks for First SLS Flight". The Planetary Society. Archived from the original on 12 March 2015. Retrieved 11 March 2015.
  90. ^ "NASA'S MANAGEMENT OF THE SPACE LAUNCH SYSTEM STAGES CONTRACT" (PDF). oig.nasa.gov. NASA Office of Inspector General Office of Audits. 10 October 2018. Archived (PDF) from the original on 10 October 2018. Retrieved 14 October 2018. Public Domain This article incorporates text from this source, which is in the public domain.
  91. ^ "NASA FY 2019 Budget Estimates" (PDF). nasa.gov. p. BUD-2. Archived (PDF) from the original on 24 December 2018. Retrieved 16 December 2018. Public Domain This article incorporates text from this source, which is in the public domain.
  92. ^ Smith, Rich (26 March 2019). "Is NASA Preparing to Cancel Its Space Launch System?". The Motley Fool. Archived from the original on 23 June 2019. Retrieved 15 May 2019.
  93. ^ "NASA FY 2019 Budget Overview" (PDF). Archived (PDF) from the original on 4 December 2019. Retrieved 24 June 2019. Quote: "Supports launch of the Power and Propulsion Element on a commercial launch vehicle as the first component of the LOP–Gateway, (page 14) Public Domain This article incorporates text from this source, which is in the public domain.
  94. ^ "Space Launch Report". www.spacelaunchreport.com. Archived from the original on 6 June 2019. Retrieved 22 May 2019.
  95. ^ a b "NASA Commits to Future Artemis Missions with More SLS Rocket Engines" (Press release). NASA. 1 May 2020. Archived from the original on 1 May 2020. Retrieved 4 May 2020. Public Domain This article incorporates text from this source, which is in the public domain.
  96. ^ a b "NASA FY19 Inflation Tables - to be utilized in FY20". NASA. p. Inflation Table. Archived from the original on 6 August 2020. Retrieved 10 May 2020. Public Domain This article incorporates text from this source, which is in the public domain.
  97. ^ "NASA, Assessments of Major Projects" (PDF). General Accounting Office. March 2016. p. 63. Archived (PDF) from the original on 13 April 2016. Retrieved 23 June 2016. Public Domain This article incorporates text from this source, which is in the public domain.
  98. ^ "NASA's Ground Systems Development and Operations Program Completes Preliminary Design Review". NASA. Archived from the original on 30 September 2021. Retrieved 23 June 2016. Public Domain This article incorporates text from this source, which is in the public domain.
  99. ^ a b "NASA FY2021 budget estimates" (PDF). Archived (PDF) from the original on 27 July 2020. Retrieved 14 September 2020.
  100. ^ a b "Fiscal Year 2010 Budget Estimates" (PDF). NASA. p. v. Archived (PDF) from the original on 6 August 2016. Retrieved 23 June 2016. Public Domain This article incorporates text from this source, which is in the public domain.
  101. ^ "FY 2008 Budget Estimates" (PDF). NASA. p. ESMD-14. Archived (PDF) from the original on 3 June 2016. Retrieved 23 June 2016. Public Domain This article incorporates text from this source, which is in the public domain.
  102. ^ "Definitive Contract NNM12AA82C". govtribe.com. Archived from the original on 30 September 2021. Retrieved 16 December 2018. Public Domain This article incorporates text from this source, which is in the public domain.
  103. ^ "Consolidated Appropriations Act 2016" (PDF). house.gov. p. 183. Archived (PDF) from the original on 24 December 2018. Retrieved 16 December 2018. Public Domain This article incorporates text from this source, which is in the public domain.
  104. ^ "NASA outlines plan for 2024 lunar landing". SpaceNews. 1 May 2019. Archived from the original on 30 September 2021. Retrieved 15 May 2019.
  105. ^ Berger, Eric (20 May 2019). "NASA's full Artemis plan revealed: 37 launches and a lunar outpost". Ars Technica. Archived from the original on 23 May 2019. Retrieved 20 May 2019.
  106. ^ Sloss, Philip. "Amid competing priorities, Boeing redesigns NASA SLS Exploration Upper Stage". NASASpaceFlight.com. Archived from the original on 7 August 2020. Retrieved 25 July 2020.
  107. .
  108. ^ Berger, Eric (20 October 2017). "NASA chooses not to tell Congress how much deep space missions cost". arstechnica.com. Archived from the original on 17 December 2018. Retrieved 16 December 2018.
  109. ^ "Origins Space Telescope Mission Concept Study Report" (PDF). 11 October 2019. p. ES-11. Archived (PDF) from the original on 12 July 2020. Retrieved 14 May 2020. The launch cost (US$500 million for the SLS launch vehicle, as advised by NASA Headquarters) is also included. Public Domain This article incorporates text from this source, which is in the public domain.
  110. ^ "Habitable Exoplanet Observatory Final Report" (PDF). 25 August 2019. Archived (PDF) from the original on 11 December 2019. Retrieved 11 May 2020. Section 9-11 9.4.1 Basis of estimate, page 281
  111. ^ "MANAGEMENT OF NASA'S EUROPA MISSION" (PDF). oig.nasa.gov. 29 May 2019. Archived (PDF) from the original on 26 June 2019. Retrieved 8 November 2019. Public Domain This article incorporates text from this source, which is in the public domain.
  112. ^ Foust, Jeff (29 May 2019). "Inspector general report warns of cost and schedule problems for Europa Clipper". SpaceNews. Archived from the original on 30 September 2021. Retrieved 20 January 2021.
  113. ^ "Follow-up to May 2019 Audit of Europa Mission - Congressional Launch Vehicle Mandate" (PDF). oig.nasa.gov. 27 August 2019. Archived (PDF) from the original on 8 November 2020. Retrieved 20 January 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  114. ^ Foust, Jeff (28 August 2019). "NASA inspector general asks Congress for Europa Clipper launch flexibility". SpaceNews. Archived from the original on 30 September 2021. Retrieved 20 January 2021.
  115. ^ Potter, Sean (23 July 2021). "NASA Awards Launch Services Contract for the Europa Clipper Mission" (Press release). NASA. Archived from the original on 24 July 2021. Retrieved 23 July 2021. Public Domain This article incorporates text from this source, which is in the public domain.
  116. ^ "SpaceX to launch the Europa Clipper mission for a bargain price". Ars Technica. 23 July 2021. Archived from the original on 13 August 2021. Retrieved 12 August 2021.
  117. ^ Town Hall with Administrator Bridenstine and NASA's New HEO Associate Administrator Douglas Loverro (YouTube). NASA. 3 December 2019. Event occurs at 24:58. Retrieved 20 January 2021. "I do not agree with the US$2 billion number, it is far less than that. I would also say that the number comes way down when you buy more than one or two. And so I think at the end we're going to be, you know, in the US$800 million to US$900 million range - I don't know, honestly. We've recently just begun negotiations on what number three through whatever - we don't have to buy any quite frankly, but we intend to. But we're looking at what we could negotiate to get the best price for the American taxpayper, which is my obligation as the head of NASA". Public Domain This article incorporates text from this source, which is in the public domain.
  118. ^ a b "NASA Announces Design For New Deep Space Exploration System". NASA. 14 September 2011. Archived from the original on 21 September 2011. Retrieved 14 September 2011. Public Domain This article incorporates text from this source, which is in the public domain.
  119. ^ "NASA Announces Key Decision For Next Deep Space Transportation System". NASA. 24 May 2011. Archived from the original on 15 September 2016. Retrieved 26 January 2012. Public Domain This article incorporates text from this source, which is in the public domain.
  120. ^ "Press Conference on the Future of NASA Space Program". C-Span. 14 September 2011. Archived from the original on 8 February 2012. Retrieved 14 September 2011.
  121. ^ Kenneth Chang (14 September 2011). "NASA Unveils New Rocket Design". The New York Times. Archived from the original on 21 February 2017. Retrieved 14 September 2011.
  122. ^ a b c d e f Bergin, Chris. "Advanced Boosters progress towards a solid future for SLS". NasaSpaceFlight.com. Archived from the original on 23 February 2015. Retrieved 25 February 2015.
  123. ^ Keith Cowing (14 September 2011). "NASA's New Space Launch System Announced – Destination TBD". SpaceRef. Archived from the original on 4 June 2012. Retrieved 26 January 2012.
  124. ^ Frank Morring (17 June 2011). "NASA Will Compete Space Launch System Boosters". Aviation Week. Archived from the original on 11 October 2011. Retrieved 20 June 2011.
  125. ^ "SLS Block II drives hydrocarbon engine research". thespacereview.com. 14 January 2013. Archived from the original on 2 September 2013. Retrieved 13 September 2013.
  126. ^ "NASA's Space Launch System: Partnering For Tomorrow" (PDF). NASA. Archived (PDF) from the original on 2 April 2015. Retrieved 12 March 2013. Public Domain This article incorporates text from this source, which is in the public domain.
  127. ^ "The Dark Knights – ATK's Advanced Boosters for SLS revealed". NASASpaceFlight.com. 14 January 2013. Archived from the original on 12 September 2013. Retrieved 10 September 2013.
  128. ^ Lee Hutchinson (15 April 2013). "New F-1B rocket engine upgrades Apollo-era design with 1.8M lbs of thrust". Ars Technica. Archived from the original on 2 December 2017. Retrieved 15 April 2013.
  129. ^ "Second SLS Mission Might Not Carry Crew". SpaceNews. 21 May 2014. Archived from the original on 27 July 2014. Retrieved 25 July 2014.
  130. ^ "Wind Tunnel testing conducted on SLS configurations, including Block 1B". NASASpaceFlight.com. July 2012. Archived from the original on 24 October 2012. Retrieved 13 November 2012.
  131. ^ "NASA's Space Launch System Program PDR: Answers to the Acronym". NASA. 1 August 2013. Archived from the original on 4 August 2013. Retrieved 3 August 2013. Public Domain This article incorporates text from this source, which is in the public domain.
  132. ^ "NASA Completes Key Review of World's Most Powerful Rocket in Support". NASA. Archived from the original on 27 May 2016. Retrieved 26 October 2015. Public Domain This article incorporates text from this source, which is in the public domain.
  133. ^ Chris Gebhardt (13 November 2013). "SLS upper stage proposals reveal increasing payload-to-destination options". NASASpaceFlight.com. Archived from the original on 18 November 2013. Retrieved 18 November 2013.
  134. ^ David Todd (3 June 2013). "SLS design may ditch J-2X upper stage engine for four RL-10 engines". Seradata. Archived from the original on 4 March 2016.
  135. ^ David Todd (7 November 2014). "Next Steps for SLS: Europe's Vinci is a contender for Exploration Upper-Stage Engine". Seradata. Archived from the original on 4 March 2016.
  136. ^ Berger, Eric (5 November 2019). "NASA rejects Blue Origin's offer of a cheaper upper stage for the SLS rocket". Ars Technica. Archived from the original on 19 December 2019. Retrieved 19 December 2019.
  137. ^ "Redacted_EUS.pdf". sam.gov. 31 October 2019. Archived (PDF) from the original on 5 October 2021. Retrieved 6 October 2021. {{cite web}}: |archive-date= / |archive-url= timestamp mismatch; 6 October 2021 suggested (help)
  138. ^ "NASA and ATK Successfully Test Ares First Stage Motor". NASA. 10 September 2009. Archived from the original on 24 December 2018. Retrieved 30 January 2012. Public Domain This article incorporates text from this source, which is in the public domain.
  139. ^ "NASA and ATK Successfully Test Five-Segment Solid Rocket Motor". NASA. 31 August 2010. Archived from the original on 19 December 2011. Retrieved 30 January 2012. Public Domain This article incorporates text from this source, which is in the public domain.
  140. ^ "NASA Successfully Tests Five-Segment Solid Rocket Motor". NASA. 31 August 2010. Archived from the original on 24 September 2011. Retrieved 8 September 2011. Public Domain This article incorporates text from this source, which is in the public domain.
  141. ^ Bergin, Chris (10 March 2015). "QM-1 shakes Utah with two minutes of thunder". NASASpaceFlight.com. Archived from the original on 13 March 2015. Retrieved 10 March 2015.
  142. ^ "The NASA Authorization Act of 2010". Featured Legislation. U.S. Senate. 15 July 2010. Archived from the original on 10 April 2011. Retrieved 26 May 2011. Public Domain This article incorporates text from this source, which is in the public domain.
  143. ^ Karl Tate (16 September 2011). "Space Launch System: NASA's Giant Rocket Explained". Space.com. Archived from the original on 27 January 2012. Retrieved 26 January 2012.
  144. ^ "SLS Engine Section Barrel Hot off the Vertical Weld Center at Michoud". NASA. Archived from the original on 19 November 2014. Retrieved 16 November 2014. Public Domain This article incorporates text from this source, which is in the public domain.
  145. ^ Foust, Jeff (16 September 2015). "First Crewed Orion Mission May Slip to 2023". SpaceNews. Archived from the original on 30 September 2021. Retrieved 23 June 2016.
  146. ^ Clark, Stephen (16 September 2015). "Orion spacecraft may not fly with astronauts until 2023". spaceflightnow.com. Archived from the original on 1 July 2016. Retrieved 23 June 2016.
  147. ^ Clark, Smith (1 May 2014). "Mikulski "Deeply Troubled" by NASA's Budget Request; SLS Won't Use 70 Percent JCL". spacepolicyonline.com. Archived from the original on 5 August 2016. Retrieved 23 June 2016.
  148. ^ "Report No. IG-20-018: NASA's Management of the Orion Multi-Purpose Crew Vehicle Program" (PDF). Office of Inspector General (United States). NASA. 16 July 2020. Archived (PDF) from the original on 19 July 2020. Retrieved 17 July 2020. Public Domain This article incorporates text from this source, which is in the public domain.
  149. ^ "All Four Engines Are Attached to the SLS Core Stage for Artemis I Mission". nasa.gov. Archived from the original on 12 November 2019. Retrieved 12 November 2019. Public Domain This article incorporates text from this source, which is in the public domain.
  150. ^ Clark, Stephen (15 December 2019). "NASA declares first SLS core stage complete". Spaceflight Now. Retrieved 7 October 2021.
  151. ^ Rincon, Paul (9 January 2020). "Nasa Moon rocket core leaves for testing". Archived from the original on 9 January 2020. Retrieved 9 January 2020.
  152. ^ "Boeing, NASA getting ready for SLS Core Stage Green Run campaign ahead of Stennis arrival". NASASpaceFlight.com. 14 December 2019. Archived from the original on 30 September 2021. Retrieved 9 January 2020.
  153. ^ "NASA Will Have 8 Minute Hold Down Test in 2020". Archived from the original on 2 August 2019. Retrieved 2 August 2019.
  154. ^ Foust, Jeff (16 January 2021). "Green Run hotfire test ends early". SpaceNews. Archived from the original on 3 October 2021. Retrieved 17 January 2021.
  155. ^ Rincon, Paul (20 January 2021). "SLS: Nasa finds cause of 'megarocket' test shutdown". BBC News. Archived from the original on 20 January 2021. Retrieved 20 January 2021.
  156. ^ Dunbar, Brian (29 April 2021). "Space Launch System Core Stage Arrives at the Kennedy Space Center". NASA. Archived from the original on 7 May 2021. Retrieved 1 June 2021.
  157. ^ Sloss, Philip (20 May 2021). "SLS Core Stage thermal protection system refurbishment in work at Kennedy for Artemis 1". NASASpaceFlight.com. Archived from the original on 26 May 2021. Retrieved 26 May 2021.
  158. ^ Davis, Jason (3 October 2016). "To Mars, with a monster rocket: How politicians and engineers created NASA's Space Launch System". The Planetary Society. Archived from the original on 25 September 2020. Retrieved 14 September 2020.
  159. ^ Harwood, William (14 September 2011). "NASA unveils new super rocket for manned flights beyond Earth orbit". CBS News. Archived from the original on 10 August 2020. Retrieved 14 September 2020.
  160. ^ Foust, Jeff (13 April 2017). "NASA inspector general foresees additional SLS/Orion delays". SpaceNews. Archived from the original on 3 October 2021. Retrieved 14 September 2020.
  161. ^ Clark, Stephen (28 April 2017). "NASA confirms first flight of Space Launch System will slip to 2019". Spaceflight Now. Archived from the original on 26 December 2017. Retrieved 29 April 2017.
  162. ^ Clark, Stephen (20 November 2017). "NASA expects first Space Launch System flight to slip into 2020". Spaceflight Now. Archived from the original on 9 August 2018. Retrieved 24 May 2018.
  163. ^ Gebhardt, Chris (21 February 2020). "SLS debut slips to April 2021, KSC teams working through launch sims". NASASpaceFlight.com. Archived from the original on 6 August 2020. Retrieved 21 February 2020.
  164. ^ Clark, Stephen (1 May 2020). "Hopeful for launch next year, NASA aims to resume SLS operations within weeks". Archived from the original on 13 September 2020. Retrieved 3 May 2020.
  165. ^ a b "SMSR Integrated Master Schedule" (PDF). Office of Safety and Mission Assurance. NASA. 7 June 2021. Archived from the original (PDF) on 14 June 2021. Retrieved 9 June 2021.
  166. ^ "Ten month schedule to ready SLS for Artemis 1 launch after Core Stage arrives at KSC". NASASpaceFlight.com. 3 May 2021. Archived from the original on 13 August 2021. Retrieved 7 August 2021.
  167. ^ Sloss, Philip (9 August 2021). "NASA EGS, Jacobs power up Artemis 1 vehicle to begin system checkouts in the VAB". NASASpaceFlight.com. Archived from the original on 1 September 2021. Retrieved 1 September 2021.
  168. ^ Berger, Eric (31 August 2021). "NASA's big rocket misses another deadline, now won't fly until 2022". Ars Technica. Archived from the original on 1 September 2021. Retrieved 1 September 2021.
  169. ^ Sloss, Philip (4 December 2020). "New Artemis 1 schedule uncertainty as NASA EGS ready to continue SLS Booster stacking". nasaspaceflight. Archived from the original on 28 September 2021. Retrieved 28 September 2021.
  170. ^ Clark, Stephen (9 March 2021). "Stacking complete for SLS boosters". spaceflightnow.com. Archived from the original on 3 June 2021. Retrieved 28 September 2021.
  171. ^ Stephen, Clark (15 January 2021). "NASA proceeds with SLS booster stacking in Florida before core stage arrives". Spaceflight Now. Archived from the original on 7 March 2021. Retrieved 28 September 2021.
  172. ^ Roulette, Joey; Gorman, Steve (16 November 2022). "NASA's next-generation Artemis mission heads to moon on debut test flight". Reuters. Retrieved 16 November 2022.
  173. ^ Foust, Jeff (21 May 2019). "In 2020, NASA Will Send Living Things to Deep Space for First Time Since Apollo". Space.com. Archived from the original on 6 August 2019. Retrieved 6 August 2019. BioSentinel is one of 13 cubesats flying aboard the Artemis 1 mission, which is currently targeted for mid-2020. [...] The other 12 cubesats flying aboard Artemis 1 are a diverse lot. For example, the Lunar Flashlight and Lunar IceCube missions will hunt for signs of water ice on the moon, and Near-Earth Asteroid Scout will use a solar sail to rendezvous with a space rock.
  174. ^ Northon, Karen (9 June 2017). "Three DIY CubeSats Score Rides on Exploration Mission-1". National Aeronautics and Space Administration (NASA). Archived from the original on 6 August 2019. Retrieved 6 August 2019. NASA's Space Technology Mission Directorate (STMD) has awarded rides for three small spacecraft on the agency's newest rocket, and $20,000 each in prize money, to the winning teams of citizen solvers competing in the semi-final round of the agency's Cube Quest Challenge.
  175. ^ Crane, Aimee (11 June 2019). "Artemis 1 Flight Control Team Simulates Mission Scenarios". National Aeronautics and Space Administration (NASA). Archived from the original on 6 August 2019. Retrieved 6 August 2019. ...after the Space Launch System performs the Trans-Lunar Injection burn that sends the spacecraft out of Earth orbit and toward the Moon.
  176. ^ Clark, Stephen (22 July 2019). "First moon-bound Orion crew capsule declared complete, major tests remain". SpaceflightNow. Archived from the original on 6 August 2019. Retrieved 6 August 2019. The Artemis 1 mission profile. Credit: NASA [...] The Artemis 1 mission sent the Orion spacecraft into a distant retrograde lunar orbit and back...
  177. ^ a b Tingley, Brett (9 January 2024). "Astronauts won't walk on the moon until 2026 after NASA delays next 2 Artemis missions". Retrieved 9 January 2024.
  178. ^ Foust, Jeff (9 November 2021). "NASA delays human lunar landing to at least 2025". SpaceNews. Retrieved 9 November 2021.
  179. ^ Foust, Jeff (13 March 2023). "NASA planning to spend up to $1 billion on space station deorbit module". SpaceNews. Retrieved 13 March 2023.
  180. ^
    NAC/HEO CMTE 2022. NASA
    . p. 16. Retrieved 20 January 2022.
  181. ^ Foust, Jeff (30 October 2022). "Lunar landing restored for Artemis 4 mission". SpaceNews. Retrieved 31 October 2022.
  182. ^ https://www.nasa.gov/wp-content/uploads/2024/03/nasa-fiscal-year-2025-budget-summary.pdf
  183. ^ Foust, Jeff (20 January 2022). "NASA foresees gap in lunar landings after Artemis 3". SpaceNews. Retrieved 20 January 2022.
  184. ^ Review of U.S. Human Space Flight Plans Committee; Augustine, Austin; Chyba, Kennel; Bejmuk, Crawley; Lyles, Chiao; Greason, Ride (October 2009). "Seeking A Human Spaceflight Program Worthy of A Great Nation" (PDF). NASA. Archived (PDF) from the original on 16 February 2019. Retrieved 15 April 2010. Public Domain This article incorporates text from this source, which is in the public domain.
  185. ^ a b c Henry Vanderbilt (15 September 2011). "Impossibly High NASA Development Costs Are Heart of the Matter". moonandback.com. Archived from the original on 31 March 2012. Retrieved 26 January 2012.
  186. ^ a b Ferris Valyn (15 September 2011). "Monster Rocket Will Eat America's Space Program". Space Frontier Foundation. Archived from the original on 6 October 2011. Retrieved 16 September 2011.
  187. ^ "Statement before the Committee on Science, Space, and Technology US House of Representatives Hearing: A Review of the NASA's Space Launch System" (PDF). The Planetary Society. 12 July 2011. Archived from the original (PDF) on 29 March 2012. Retrieved 26 January 2012.
  188. ^ Rohrabacher, Dana (14 September 2011). "Nothing New or Innovative, Including It's [sic] Astronomical Price Tag". Archived from the original on 24 September 2011. Retrieved 14 September 2011. Public Domain This article incorporates text from this source, which is in the public domain.
  189. ^ "Rohrabacher calls for "emergency" funding for CCDev". parabolicarc.com. 24 August 2011. Archived from the original on 26 November 2014. Retrieved 15 September 2011.
  190. ^ Jeff Foust (15 September 2011). "A monster rocket, or just a monster?". The Space Review. Archived from the original on 17 October 2011. Retrieved 20 October 2011.
  191. ^ Jeff Foust (1 November 2011). "Can NASA develop a heavy-lift rocket?". The Space Review. Archived from the original on 15 October 2011. Retrieved 20 October 2011.
  192. ^ Mohney, Doug (21 October 2011). "Did NASA Hide In-space Fuel Depots To Get a Heavy Lift Rocket?". Satellite Spotlight. Archived from the original on 3 March 2016. Retrieved 10 November 2011.
  193. ^ "Propellant Depot Requirements Study" (PDF). HAT Technical Interchange Meeting. 21 July 2011. Archived (PDF) from the original on 1 October 2021. Retrieved 25 May 2012.
  194. ^ Cowing, Keith (12 October 2011). "Internal NASA Studies Show Cheaper and Faster Alternatives to the Space Launch System". SpaceRef. Archived from the original on 3 October 2021. Retrieved 10 November 2011.
  195. ^ "Near Term Space Exploration with Commercial Launch Vehicles Plus Propellant Depot" (PDF). Georgia Institute of Technology / National Institute of Aerospace. 2011. Archived (PDF) from the original on 4 February 2016. Retrieved 7 March 2012.
  196. ^ "Affordable Exploration Architecture" (PDF). United Launch Alliance. 2009. Archived from the original (PDF) on 21 October 2012.
  197. ^ Grant Bonin (6 June 2011). "Human spaceflight for less: the case for smaller launch vehicles, revisited". The Space Review. Archived from the original on 23 November 2012. Retrieved 20 September 2011.
  198. ^ Robert Zubrin (14 May 2011). "How We Can Fly to Mars in This Decade — And on the Cheap". Mars Society. Archived from the original on 19 March 2012.
  199. ^ a b Rick Tumlinson (15 September 2011). "The Senate Launch System – Destiny, Decision, and Disaster". Huffington Post. Archived from the original on 10 September 2014. Retrieved 9 September 2014.
  200. ^ Andrew Gasser (24 October 2011). "Propellant depots: the fiscally responsible and feasible alternative to SLS". The Space Review. Archived from the original on 27 October 2011. Retrieved 31 October 2011.
  201. ^ Eric Berger (1 August 2019). "The SLS rocket may have curbed development of on-orbit refueling for a decade". Archived from the original on 5 August 2019. Retrieved 5 August 2019.
  202. ^ Alan Boyle (7 December 2011). "Is the case for Mars facing a crisis?". MSNBC. Archived from the original on 7 January 2012.
  203. ^ John K. Strickland Jr. "The SpaceX Falcon Heavy Booster: Why Is It Important?". National Space Society. Archived from the original on 8 July 2015. Retrieved 4 January 2012.
  204. ^ "NASA Studies Scaled-Up Falcon, Merlin". Aviation Week. 2 December 2010. Archived from the original on 27 July 2012.
  205. ^ "Spacex BFR to be lower cost than Falcon 1 at US$7 million per launch". nextbigfuture.com. Archived from the original on 14 July 2018. Retrieved 17 January 2019.
  206. ^ Bergin, Chris (29 August 2014). "Battle of the Heavyweight Rockets – SLS could face Exploration Class rival". NASAspaceflight.com. Archived from the original on 16 March 2015. Retrieved 16 May 2019.
  207. ^ "Congressman, Space Frontier Foundation, And Tea Party In Space Call For NASA SLS Investigation". moonandback.com. 4 October 2011. Archived from the original on 3 October 2011. Retrieved 20 October 2011.
  208. ^ a b c "The Senate Launch System". Competitive Space Task Force. 4 October 2011. Archived from the original on 27 October 2011. Retrieved 20 October 2011.
  209. Washington Post. Archived
    from the original on 3 October 2021. Retrieved 26 February 2021.
  210. ^ "NASA veteran Chris Kraft upfront with criticism". August 2013. Archived from the original on 16 February 2018. Retrieved 2 July 2017.
  211. ^ "Garver: NASA Should Cancel SLS and Mars 2020 Rover". Space News. January 2014. Archived from the original on 3 October 2021. Retrieved 25 August 2015.
  212. ^ "Why NASA Still Can't Put Humans in Space: Congress Is Starving It of Needed Funds". 2015. Archived from the original on 24 August 2015. Retrieved 25 August 2015.
  213. ^ "New Report Finds Nasa Awarded Boeing Large Fees Despite SLS Launch Slips". ArsTechnica. 2019. Archived from the original on 14 August 2019. Retrieved 1 August 2019.
  214. ^ "Space News: Contractors continue to win award fees despite SLS and Orion delays". Space News. 2019. Archived from the original on 3 October 2021. Retrieved 1 August 2019.
  215. ^ a b c d e "NASA'S MANAGEMENT OF SPACE LAUNCH SYSTEM PROGRAMCOSTS AND CONTRACTS" (PDF). NASA - Office of Inspector General - Office of Audits. 10 March 2020. Archived (PDF) from the original on 28 August 2020. Retrieved 14 September 2020. Based on our review of SLS Program cost reporting, we found that the Program exceeded its Agency Baseline Commitment (ABC) by at least 33 percent at the end of FY 2019, a figure that could reach 43 percent or higher if additional delays push the launch date for Artemis I beyond November 2020. This is due to cost increases tied to Artemis I and a December 2017 replan that removed almost $1 billion of costs from the ABC without lowering the baseline, thereby masking the impact of Artemis I's projected 19-month schedule delay from November 2018 to a June 2020 launch date. Since the replan, the SLS Program now projects the Artemis I launch will be delayed to at least spring 2021 or later. Further, we found NASA's ABC cost reporting only tracks Artemis I-related activities and not additional expenditures of almost $6 billion through FY 2020 that are not being reported or tracked through the official congressional cost commitment or the ABC. ... as a result of delaying Artemis I up to 19 months to June 2020, NASA conducted a replan of the SLS Program in 2017 and removed $889 million in Booster and RS-25 Engine-related development costs because SLS Program officials determined those activities were not directly tied to Artemis I. ... In our judgement, the removal of these costs should have reduced the SLS Program's ABC development costs from $7.02 billion to $6.13 billion. ... SLS Program and HEOMD officials disagreed with our assessment and stated the SLS Program's change in cost estimates for the Booster and Engines element offices were not a removal of costs but rather a reallocation of those activities to appropriately account for them as non-Artemis I costs. ... Federal law requires that any time Agency program managers have reasonable knowledge that development costs are likely to exceed the ABC by more than 30 percent, they must notify the NASA Administrator. Once the Administrator determines the SLS Program will exceed the development cost baseline by 30 percent or more, NASA is required to notify Congress and rebaseline program costs and schedule commitments. If the Administrator notifies Congress of the need to rebaseline, NASA is required to stop funding program activities within 18 months unless Congress provides approval and additional appropriations. In our judgement, using NASA's cost estimates from October 2019 and accounting for the removed costs from the replan, the SLS Program was required to rebaseline when the program exceeded its ABC by 33 percent at the end of FY 2019, an increase that could reach 43 percent or higher by the Artemis I launch date. Public Domain This article incorporates text from this source, which is in the public domain.
  216. ^ "NASA HUMAN SPACE EXPLORATION: Persistent Delays and Cost Growth Reinforce Concerns over Management of Programs" (PDF). GAO. Archived (PDF) from the original on 3 October 2021. Retrieved 15 September 2020. NASA's current approach for reporting cost growth misrepresents the cost performance of the program and thus undermines the usefulness of a baseline as an oversight tool. NASA's space flight program and project management requirements state that the agency baseline commitment for a program is the basis for the agency's commitment to the Office of Management and Budget (OMB) and the Congress based on program requirements, cost, schedule, technical content, and an agreed-to joint cost and schedule confidence level. Removing effort that amounts to more than a tenth of a program's development cost baseline is a change in the commitment to OMB and the Congress and results in a baseline that does not reflect actual effort. ... Further, the baseline is a key tool against which to measure the cost and schedule performance of a program. A program must be rebaselined and reauthorized by the Congress if the Administrator determines that development costs will increase by more than 30 percent. Accounting for shifted costs, our analysis indicates that NASA has reached 29.0 percent development cost growth for the SLS program. ... In addition, as we previously reported in May 2014, NASA does not have a cost and schedule baseline for SLS beyond the first flight. As a result, NASA cannot monitor or track costs shifted beyond EM-1 against a baseline. We recommended that NASA establish cost and schedule baselines that address the life cycle of each SLS increment, as well as for any evolved Orion or ground systems capability. NASA partially concurred with the recommendation, but has not taken any action to date. ... By not adjusting the SLS baseline to account for the reduced scope, NASA will continue to report costs against an inflated baseline, hence underreporting the extent of cost growth. NASA's Associate Administrator and Chief Financial Officer stated that they understood our rationale for removing these costs from the EM-1 baseline and agreed that not doing so could result in underreporting of cost growth. Further, the Associate Administrator told us that the agency will be relooking at the SLS program's schedule, baseline, and calculation of cost growth. Public Domain This article incorporates text from this source, which is in the public domain.
  217. ^ Berger, Eric (1 May 2020). "NASA will pay a staggering 146 million for each SLS rocket engine". Ars Technica. Archived from the original on 4 May 2020. Retrieved 4 May 2020.
  218. ^ "Bolden talks expectations for Biden's space policy". Politico. 2020. Archived from the original on 11 September 2020. Retrieved 11 September 2020.

External links