Space Shuttle Enterprise
Enterprise | |
---|---|
Intrepid Museum | |
Space Shuttle orbiters | |
→ |
Space Shuttle Enterprise (
Originally, Enterprise had been intended to be refitted for
Enterprise was restored and placed on display in 2003 at the Smithsonian's new Steven F. Udvar-Hazy Center in Virginia.[4] Following the retirement of the Space Shuttle fleet, Discovery replaced Enterprise at the Udvar-Hazy Center, and Enterprise was transferred to the Intrepid Museum in New York City, where it has been on display since July 2012.[5]
Differences between Enterprise and future shuttles
The design of Enterprise was not the same as that planned for
Enterprise also lacked reaction control system thrusters and hydraulic mechanisms for the landing gear; the landing gear doors were simply opened through the use of explosive bolts and the gear dropped down solely by gravity.[7] As it was only used for atmospheric testing, Enterprise featured a large nose probe mounted on its nose cap, common on test aircraft because the location provides the most accurate readings for the test instruments, being mounted out in front of the disturbed airflow.
Enterprise was equipped with
Construction milestones
Date | Milestone[8] |
---|---|
1972 July 26 | Contract Award to North American Rockwell
|
1972 August 9 | Construction authorization from NASA |
1974 June 4 | Start structural assembly of crew module at Downey plant |
1974 August 26 | Start structural assembly of aft fuselage at Downey plant |
1975 March 27 | Mid fuselage arrives at Palmdale from General Dynamics |
1975 May 23 | Wings arrive at Palmdale from Grumman |
1975 May 25 | Vertical stabilizer arrives at Palmdale from Fairchild Republic
|
1975 August 25 | Start of Final Assembly |
1975 September 9 | Aft fuselage on dock, Palmdale |
1975 October 31 | Lower forward fuselage on dock, Palmdale |
1975 December 1 | Upper forward fuselage on dock, Palmdale |
1976 January 16 | Crew module on dock, Palmdale |
1976 March 3 | Payload bay doors on dock, Palmdale |
1976 March 12 | Complete final assembly and closeout systems installation |
1976 March 15 | Start functional checkout |
1976 June | Complete functional checkout, start ground vibration and proof load tests |
1976 September 17 | Rollout from Palmdale[9] |
1976 October–November | Start systems retest, complete integrated systems checkout |
1977 February 18 | First captive flight |
1977 June 18 | First crewed captive flight[10] |
1977 August 12 | First free flight |
Service

Construction began on Enterprise on June 4, 1974.
In an official memo, White House advisors cited "hundreds of thousands of letters" from Trekkies, "one of the most dedicated constituencies in the country", as a reason for giving the shuttle the name.[11] Although Ford did not publicly mention the campaign, the president said that he was "partial to the name" Enterprise, and directed NASA officials to change the name.[3][12][13]
In mid-1976 the orbiter was used for ground vibration tests, allowing engineers to compare data from an actual flight vehicle with theoretical models.[1]
On September 17, 1976, Enterprise was rolled out of Rockwell's plant at Palmdale, California. In recognition of its fictional namesake, Star Trek creator Gene Roddenberry and most of the principal cast of the original series of Star Trek were on hand at the dedication ceremony.[14]
Approach and landing tests (ALT)
On January 31, 1977, Enterprise was taken by road to
While at NASA Dryden Enterprise was used by NASA for a variety of ground and flight tests intended to validate aspects of the shuttle program.[16] The initial nine-month testing period was referred to by the acronym ALT, for "Approach and Landing Test".[1][17] These tests included a maiden "flight" on February 18, 1977, atop a Boeing 747 Shuttle Carrier Aircraft (SCA) to measure structural loads and ground handling and braking characteristics of the mated system. Ground tests of all orbiter subsystems were carried out to verify functionality prior to atmospheric flight.[10]
The mated Enterprise/SCA combination was then subjected to five test flights with Enterprise uncrewed and unactivated. The purpose of these test flights was to measure the flight characteristics of the mated combination. These tests were followed with three test flights with Enterprise crewed to test the shuttle flight control systems.[1]
On August 12, 1977, Enterprise flew on its own for the first time.[18] Enterprise underwent four more free flights where the craft separated from the SCA and was landed under astronaut control. These tests verified the flight characteristics of the orbiter design and were used to carry out several aerodynamic and weight configurations.[17] The first three flights were flown with a tailcone placed at the end of Enterprise's aft fuselage, which reduced drag and turbulence when mated to the SCA. The final two flights saw the tailcone removed and mockup main engine nozzles installed. On the fifth and final glider flight, pilot-induced oscillation problems were revealed, which had to be addressed before the first orbital launch occurred.[16]
Mated Vertical Ground Vibration Test (MGVT)
Following the conclusion of the ALT test flight program, on March 13, 1978, Enterprise was flown once again, but this time halfway across the country to NASA's Marshall Space Flight Center (MSFC) in Alabama for the Mated Vertical Ground Vibration Testing (MGVT). The orbiter was lifted up on a sling very similar to the one used at Kennedy Space Center and placed inside the Dynamic Test Stand building, and mated to the Vertical Mate Ground Vibration Test tank (VMGVT-ET), which in turn was attached to a set of inert Solid Rocket Boosters (SRB) to form a complete shuttle launch stack, and marked the first time in the program's history that all Space Shuttle elements, an Orbiter, an External Tank (ET), and two SRBs, were mated together. During the course of the program, Enterprise and the rest of the launch stack would be exposed to a punishing series of vibration tests simulating as closely as possible those expected during various phases of launch, some tests with and others without the SRBs in place.[19]
Planned preparations for spaceflight
At the conclusion of this testing, Enterprise was due to be taken back to Palmdale for retrofitting as a fully spaceflight capable vehicle. Under this arrangement, Enterprise would be launched on its maiden spaceflight in July 1981 to launch a communications satellite and retrieve the Long Duration Exposure Facility, then planned for a 1980 release on the first operational orbiter, Columbia. Afterward, Enterprise would conduct two Spacelab missions.[20] However, in the period between the rollout of Enterprise and the rollout of Columbia, a number of significant design changes had taken place, particularly with regard to the weight of the fuselage and wings. This meant that retrofitting the prototype would have been a much more expensive process than previously realized, involving the dismantling of the orbiter and the return of various structural sections to subcontractors across the country. As a consequence, NASA made the decision to convert an incomplete Structural Test Article, numbered STA-099, which had been built to undergo a variety of stress tests, into a fully flight-worthy orbiter, which became Challenger.
# | Date | Designation | Launch pad | Notes |
---|---|---|---|---|
1 | July 16, 1981 | STS-17 | 39-A | Deployment of Intelsat V satellite and retrieval of Long Duration Exposure Facility |
2 | September 30, 1981 | STS-20 | 39-A | Spacelab mission |
3 | November 25, 1981 | STS-22 | 39-A | Spacelab mission |
Fit checks

Following the MGVT program and with the decision to not use Enterprise for orbital missions, it was ferried to Kennedy Space Center on April 10, 1979. By June 1979, it was mated with an external tank and solid rocket boosters (known as a boilerplate configuration) and tested in a launch configuration at KSC Launch Complex 39A for a series of fit checks of the facilities there.[3]
After this period, Enterprise was returned to NASA's

Between November 1984 and May 1985, Enterprise was again mated with an external tank and solid rocket boosters in a boilerplate configuration for a series of fit checks of the
On November 18, 1985, Enterprise was ferried to Washington, D.C., where it became property of the
Post-Challenger
After the Challenger disaster, NASA considered using Enterprise as a replacement. Refitting the shuttle with all of the necessary equipment for it to be used in space was considered, but NASA decided to use spare parts constructed at the same time as Discovery and Atlantis to build Endeavour.[3]
Post-Columbia

In 2003 after the breakup of Columbia during re-entry, the Columbia Accident Investigation Board conducted tests at Southwest Research Institute, which used an air cannon to shoot foam blocks of similar size, mass and speed to that which struck Columbia at a test structure which mechanically replicated the orbiter wing leading edge. They removed a section of fiberglass leading edge from Enterprise's wing to perform analysis of the material and attached it to the test structure, then shot a foam block at it.[26] While the leading edge was not broken as a result of the test, which took place on May 29, 2003, the impact was enough to permanently deform a seal and leave a thin gap 22 in (56 cm) long.[27][28][29] Since the strength of the reinforced carbon–carbon (RCC) on Columbia is "substantially weaker and less flexible" than the test section from Enterprise, this result suggested that the RCC would have been shattered.[29] A section of RCC leading edge from Discovery was tested on June 6, to determine the effects of the foam on a similarly aged leading edge, resulting in a three in (7.6 cm) crack on panel 6 and cracking on a T-shaped seal between panels 6 and 7.[30][31] On July 7, using a leading edge from Atlantis and focused on panel 8 with refined parameters stemming from the Columbia accident investigation, a second test created a ragged hole approximately 16 by 16 in (41 by 41 cm) in the RCC structure.[32][31] The tests clearly demonstrated that a foam impact of the type Columbia sustained could seriously breach the protective RCC panels on the wing leading edge.[31]
The board determined that the probable cause of the accident was that the foam impact caused a breach of a reinforced carbon-carbon panel along the leading edge of Columbia's left wing, allowing hot gases generated during re-entry to enter the wing and cause structural collapse. This caused Columbia to tumble out of control, breaking up with the loss of the entire crew.[33]
Museum exhibit
New Orleans, Louisiana

In 1984, Enterprise was on display during the 1984 Louisiana World Exposition (World's Fair) in New Orleans.
Washington, D.C.
From 1985 to 2003,
New York
Space Shuttle Enterprise | |
The mobile Jersey City. The Shuttle sustained cosmetic damage to a wingtip when a gust of wind blew the barge towards a piling.[45] It was hoisted June 6 onto the Intrepid Museum in Manhattan.[46]
Enterprise went on public display on July 19, 2012, at the Intrepid Museum's new Space Shuttle Pavilion, a temporary shelter consisting of a pressurized, air-supported fabric bubble constructed on the aft end of the carrier's flight deck.[47] ![]() On October 29, 2012, storm surges from Hurricane Sandy caused Pier 86, including the Intrepid Museum's visitor center, to flood, and knocked out the museum's electrical power and both backup generators. The loss of power caused the Space Shuttle Pavilion to deflate, and high winds from the hurricane caused the fabric of the Pavilion to tear and collapse around the orbiter. Minor damage was spotted on the vertical stabilizer of the orbiter, as a portion of the tail fin above the rudder/speedbrake had broken off.[48] The broken section was recovered by museum staff. While the pavilion itself could not be replaced for some time in 2013, the museum erected scaffolding and sheeting around Enterprise to protect it from the environment.[49] By April 2013, the damage sustained to Enterprise's vertical stabilizer had been fully repaired, and construction work on the structure for a new pavilion was under way.[50] The pavilion and exhibit reopened on July 10, 2013.[51] Enterprise was listed on the National Register of Historic Places on March 13, 2013, reference number 13000071, in recognition of its role in the development of the Space Shuttle Program. The historic significance criteria are in space exploration, transportation, and engineering.[52] Gallery
See also
References
Attribution
National Aeronautics and Space Administration .
External linksWikimedia Commons has media related to Space Shuttle Enterprise.
Articles
|